• Title/Summary/Keyword: heuristic algorithms

Search Result 598, Processing Time 0.024 seconds

A Restricted Neighborhood Generation Scheme for Parallel Machine Scheduling (병렬 기계 스케줄링을 위한 제한적 이웃해 생성 방안)

  • Shin, Hyun-Joon;Kim, Sung-Shick
    • IE interfaces
    • /
    • v.15 no.4
    • /
    • pp.338-348
    • /
    • 2002
  • In this paper, we present a restricted tabu search(RTS) algorithm that schedules jobs on identical parallel machines in order to minimize the maximum lateness of jobs. Jobs have release times and due dates. Also, sequence-dependent setup times exist between jobs. The RTS algorithm consists of two main parts. The first part is the MATCS(Modified Apparent Tardiness Cost with Setups) rule that provides an efficient initial schedule for the RTS. The second part is a search heuristic that employs a restricted neighborhood generation scheme with the elimination of non-efficient job moves in finding the best neighborhood schedule. The search heuristic reduces the tabu search effort greatly while obtaining the final schedules of good quality. The experimental results show that the proposed algorithm gives better solutions quickly than the existing heuristic algorithms such as the RHP(Rolling Horizon Procedure) heuristic, the basic tabu search, and simulated annealing.

Minimizing the Number of Inter-Cell Movement of Parts with Consideration of a Machine-Cell Size (제한된 기계군의 크기하에서 부품의 이동을 최소로 하는 GT기법)

  • Park, Chang-Kyu
    • IE interfaces
    • /
    • v.12 no.4
    • /
    • pp.532-539
    • /
    • 1999
  • The first step to design a cellular manufacturing system is to make part-families and machine-cells. This process is called the machine-part grouping. This paper considers a machine-cell size when grouping machine-cells. By considering a machine-cell size, an unrealistically big size of machine-cell which may be caused by the chaining effect can be avoid. A heuristic algorithm which minimizes the number of inter-cell movement of parts considering a machine-cell size is presented. The effectiveness and performance of the proposed heuristic algorithm are compared with those of several heuristic algorithms previously reported. The comparison shows that the proposed heuristic algorithm is efficient and reliable in minimizing the number of inter-cell movement of parts and also prevents the chaining effect.

  • PDF

A Two-Stage Heuristic for Disassembly Scheduling with Capacity Constraints

  • Jeon Hyong-Bae;Kim Jun-Gyu;Kim Hwa-Joong;Lee Dong-Ho
    • Management Science and Financial Engineering
    • /
    • v.12 no.1
    • /
    • pp.95-112
    • /
    • 2006
  • Disassembly scheduling is the problem of determining the quantity and timing of disassembling used or end-of-life products while satisfying the demand of their parts and/or components over a planning horizon. The case of assembly product structure is considered while the resource capacity constraints are explicitly considered. A cost-based objective is considered that minimizes the sum of disassembly operation and inventory holding costs. The problem is formulated as an integer programming model, and a two-stage heuristic with construction and improvement algorithms is suggested in this paper. To test the performance of the heuristic, computational experiments are done on randomly generated problems, and the results show that the heuristic gives near optimal solutions within a very short amount of computation time.

LSB Algorithm for the Job Oriented Heuristic Scheduling (작업지향 탐색적 일정계획을 위한 LSB 기법)

  • Kim Hyun-joon;Park Changkyu
    • Korean Management Science Review
    • /
    • v.21 no.2
    • /
    • pp.79-91
    • /
    • 2004
  • In industrial production settings, scheduling problems for detailed day-to-day operations are often ordeals to production practitioners. For those who have scheduling experiences with the Gantt Chart, the job oriented heuristic scheduling has illustrated its merits in solving practically large scale scheduling problems. It schedules all operations of a job within a finite capacity before considering the next job. In this paper, we Introduce the LSB (load smoothing backward) scheduling algorithm for the job oriented heuristic scheduling. Through a computer experiment in a hypothetical setting, we make a performance comparison of LSB scheduling algorithm with existing algorithms and also suggest a guideline for selecting the suitable algorithm for certain industrial settings.

Optimal Feeder Routing for Distribution System Planning Using a Heuristic Strategy (휴리스틱 탐색전략을 이용한 배전계통 계획의 급전선 최적 경로 선정)

  • Choi, Nam-Jin;Kim, Byung-Seop;Shin, Joong-Rin
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.11
    • /
    • pp.566-574
    • /
    • 2000
  • This paper propose a heuristic algorithm based on the Branch-Exchange (BE) method to solve Optimal feeder Routing(OFR) problem for the distribution system planning. The cost function of the OFR problem is consisted of the investment cost representing the feeder installation and the system operation cost representing the system power loss. We propose a properly designed heuristic strategy, which can handle the horizon-year expansion planning problem of power distribution network. We also used the loop selection method which can define the maximum loss reduction in the network to reduce calculation time, and proposed a new index of power loss which is designed to estimate the power loss reduction in the BE. The proposed index, can be considered with both sides, the low voltage side and voltage side branch connected with tie one. The performances of the proposed algorithms and loss index were shown with 32, 69 example bus system.

  • PDF

Diffusion-Based Influence Maximization Method for Social Network (소셜 네트워크를 위한 확산기반 영향력 극대화 기법)

  • Nguyen, Tri-Hai;Yoo, Myungsik
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.41 no.10
    • /
    • pp.1244-1246
    • /
    • 2016
  • Influence maximization problem is to select seed node set, which maximizes information spread in social networks. Greedy algorithm shows an optimum solution, but has a high computational cost. A few heuristic algorithms were proposed to reduce the complexity, but their performance in influence maximization is limited. In this paper, we propose general degree discount algorithm, and show that it has better performance while keeping complexity low.

A novel heuristic for handover priority in mobile heterogeneous networks based on a multimodule Takagi-Sugeno-Kang fuzzy system

  • Zhang, Fuqi;Xiao, Pingping;Liu, Yujia
    • ETRI Journal
    • /
    • v.44 no.4
    • /
    • pp.560-572
    • /
    • 2022
  • H2RDC (heuristic handover based on RCC-DTSK-C), a heuristic algorithm based on a highly interpretable deep Takagi-Sugeno-Kang fuzzy classifier, is proposed for suppressing the mobile heterogeneous networks problem of frequent handover and handover ping-pong in the multibase-station scenario. This classifier uses a stack structure between subsystems to form a deep classifier before generating a base station (BS) priority sequence during the handover process, and adaptive handover hysteresis is calculated. Simulation results show that H2RDC allows user equipment to switch to the best antenna at the optimal time. In high-BS density load and mobility scenarios, the proposed algorithm's handover success rate is similar to those of classic algorithms such as best connection (BC), self tuning handover algorithm (STHA), and heuristic for handover based on AHP-TOPSIS-FUZZY (H2ATF). Moreover, the handover rate is 83% lower under H2RDC than under BC, whereas the handover ping-pong rate is 76% lower.

A Scheduling Problem to Minimize Total Tardiness in the Two-stage Assembly-type Flowshop (총 납기지연시간 최소화를 위한 두 단계 조립시스템에서의 일정계획에 관한 연구)

  • Ha, Gui-Ryong;Lee, Ik-Sun;Yoon, Sang-Hum
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.33 no.3
    • /
    • pp.1-16
    • /
    • 2008
  • This paper considers a scheduling problem to minimize the total tardiness in the two-stage assembly-type flowshop. The system is composed of multiple fabrication machines in the first stage and a final-assembly machine in the second stage. Each job consists of multiple tasks, each task is performed on the fabrication machine specified in advance. After all the tasks of a job are finished, the assembly task can be started on the final-assembly machine. The completion time of a job is the time that the assembly task for the job is completed. The objective of this paper is to find the optimal schedule minimizing the total tardiness of a group of jobs. In the problem analysis, we first derive three solution properties to determine the sequence between two consecutive jobs. Moreover, two lower objective bounds are derived and tested along with the derived properties within a branch-and-bound scheme. Two efficient heuristic algorithms are also developed. The overall performances of the proposed properties, branch-and-bound and heuristic algorithms are evaluated through numerical experiments.

An Explicit Column Generation Algorithm for the Profit Based Unit Commitment Problem in Electric Power Industry (전력산업에서의 Profit-Based Unit Commitment Problem 최적화를 위한 명시적 열생성 알고리즘)

  • Lee, Kyung-Sik;Song, Sang-Hwa
    • IE interfaces
    • /
    • v.20 no.2
    • /
    • pp.186-194
    • /
    • 2007
  • Recent deregulation of Korean electricity industry has made each power generation company pay more attention to maximizing its own profit instead of minimizing the overall system operation cost while guaranteeing system security. Electricity power generation problem is typically defined as the problem of determining both the on and off status and the power generation level of each generator under the given fuel constraints, which has been known as Profit-Based Unit Commitment (PBUC) problem. To solve the PBUC problem, the previous research mostly focused on devising Lagrangian Relaxation (LR) based heuristic algorithms due to the complexity of the problem and the nonlinearity of constraints and objectives. However, these heuristic approaches have been reported as less practical in real world applications since the computational run time is usually quite high and it may take a while to implement the devised heuristic algorithms as software applications. Especially when considering long-term planning problem which spans at least one year, the complexity becomes higher. Therefore, this paper proposes an explicit column generation algorithm using power generation patterns and the proposed algorithm is successfully applied to a Korean power generation company. The proposed scheme has a robust structure so that it is expected to extend general PBUC problems.

Algorithms for Localization of a Moving Target in RFID Systems (RFID 시스템에서 이동체의 위치 추적을 위한 알고리즘)

  • Joo, Un-Gi
    • IE interfaces
    • /
    • v.23 no.3
    • /
    • pp.239-245
    • /
    • 2010
  • This paper considers a localization problem of a moving tag on RFID(Radio Frequency Identification) systems, where a positioning engine collects TDOA(Time-difference of Arrival) signal from a target tag to estimate the position of the tag. To localize the tag in the RFID system, we develop two heuristic algorithms and evaluate their performance in the estimation error and computational time by using randomly generated numerical examples. Based upon the performance evaluation, we can conclude our algorithms are valuable for localization the moving target.