• Title/Summary/Keyword: heavy water leakage section

Search Result 2, Processing Time 0.02 seconds

A Case Study on Reinforcement of Cut Slope with Fault Zone (단층대가 발달한 사면의 보강대책에 관한 사례 연구)

  • Kim, Jeong-Ho;Park, Choon-Sik;Kim, Tae-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.930-937
    • /
    • 2008
  • From the result of precise field investigation and stability analysis for the cut slope, following results were acquired. 1. The cause of the collapse of cut slope came from circle sliding collapse by fault zone which remained inner weathering zone. 2. The existing destructed soil and rock can be removed by reinforcement. And to prevent the additional destruction, it is judged that applying the method after relaxing the slope would be reasonable. 3. To make cut slope stable, soft rock layer should be done cutting 1:1.5 and 1:2.0 ~ 1:2.5 for weathered rock and soil layer. 4. Heavy water leakage section should be applied horizontal drain method so that water pressure should not act to the cut slope.

  • PDF

Practical 2-Arch Road Tunnel Design in Mountainous area (산악지형에서 효율적인 2-Arch 터널의 설계사례)

  • Jeong, Kyeong-Han;Lee, Joo-Gong;Han, Sung-Su;Hwang, Yong-Sub;Kim, Ji-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.601-612
    • /
    • 2005
  • In mountainous area, Two parallel tunnels have been usually recognized as a road tunnel which has benefits in aspects of cost and stability. However, Design and construction of 2-Arch road tunnel are growing recently due to environmental destruction, compensation of land and difficulty of route separation. As studies are mainly undergoing on only guaranteeing stability and developing a waterproofing-drainage system to avoid water leakage through comprehension for characteristics of 2-arch tunnel behaviors, there is a tendency to evaluate quantity of support by empirical method with a tunnel which has a complicated cross-section and lack of construction ability. In this study, therefore, we made a plan of tunnel cross-section which had shown good construction ability and developed the waterproofing-drainage system which is able to solve the water leakage problem fundamentally by analyzing precedented 2-arch tunnels and investigating their sites in and out of nation. We also determined fixed quantity of support by a large-scale model test and numerical analysis. We want to contribute to 2-arch tunnel design hereafter introducing design procedure and method applied here.

  • PDF