Performance Analysis of Once-through HRSG and Steam Turbine System (관류형 열회수 증기발생기와 증기터빈 시스템의 성능해석)

  • Yang, J.S.;Kim, T.S.;Ro, S.T.
    • Proceedings of the KSME Conference
    • /
    • 2001.11b
    • /
    • pp.872-877
    • /
    • 2001
  • This study analyzed the design performance of the bottoming system of combined cycle power plants adopting a single-pressure once-through heat recovery steam generator with reheat. A computer program was constructed and parametric analyses were carried out to present the criteria for determining the reheat pressure and the location of the starring point of the reheater in the HRSG. The performance of the bottoming system was presented for the range from high subcritical to supercritical pressures. It was founded that the power of the bottoming system can be as high as that of the present triple-pressure bottoming system even with a higher exhaust gas temperature. A requirement for this high performance is a proper arrangement of the reheater.

  • PDF

Characteristics of Flow Uniformity at the Section before Tube Bank with the Change of Expansion Inlet Duct Shape in a Heat Recovery Steam Generator (배열회수보일러 입구 덕트 확관 형상 변화에 따른 전열관군 전단 유동균일화 특성)

  • Ha, Ji-Soo
    • Journal of the Korean Institute of Gas
    • /
    • v.16 no.1
    • /
    • pp.1-7
    • /
    • 2012
  • The present study has been carried out to analyze the flow characteristics in the inlet expasion duct of a heat recovery steam generator by using numerical flow analysis. The inlet of HRSG corresponds the outlet of gas turbine exit and the flow after gas turbine has strong swirl flow and turbulence. The inlet flow condition of HRSG should be included the exit flow characteristics of gas turbine. The present numerical analysis adopted the flow analysis result of gas turbine exit flow as a inlet flow condition of HRSG analysis. Because the flow characteristics in the inlet duct of the tube bank is strongly related to the performance of a HRSG, it is most important for the optimal design of HGSG to understanding the flow phenomena in the inlet duct of HRSG. From the present study, the position of breakpoint in the inlet expansion duct should be lower than the reference breakpoint position for the optimal flow uniformity before the tube bank.

Study on Safety Design of Vertical-Type Heat Recovery Steam Generator Based on Large-Scale Analysis (대규모해석을 활용한 수직형 배열회수 증기발생기의 안전설계에 관한 연구)

  • Ryu, Tae-Young;Yang, Sang-Mo;Jang, Hyun-Min;Choi, Jae-Boong;Myung, Ki-Chul;Lee, Dong-Yun;Choi, Shin-Beom
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.36 no.12
    • /
    • pp.1535-1542
    • /
    • 2012
  • A Heat Recovery Steam Generator(HRSG) is the main component of a Combined Cycle Power Plant(CCPP). It is a very large structure that is made from relatively thin metal sheets. Therefore, the structural integrity of an HRSG is very important to ensure safe operation during plant lifetime. In particular, thermal deformation and thermal fatigue have been revealed as the main causes of the mechanical degradation of an HRSG. In order to prevent unexpected damage, safety evaluation based on a large-scale analysis is necessary. Therefore, this study aims to improve the safety of HRSG by using Finite Element Analysis(FEA) results derived from large-scale analysis. Furthermore, the modified design is verified by comparing it with the original one. This result will be used as basic data for improving the safety of a vertical-type HRSG.

Experimental Study on Thermal Characteristics of Heat Exchanger Modules for Multi Burner Boiler (멀티버너 보일러용 열교환기 모듈 특성 시험 - 모듈 순서에 따른 특성결과 -)

  • Kang, Sae-Byul;Kim, Jong-Jin;Ahn, Joon
    • Proceedings of the KSME Conference
    • /
    • 2008.11b
    • /
    • pp.3053-3058
    • /
    • 2008
  • We develop a heat exchanger modules for a multi-burner boiler. The heat exchanger module is kind of a heat recovery steam generator (HRSG). This heat recovery system has 4 heat exchanger modules. The 1st module consists of 27 bare tubes due to high temperature exhaust gas and the others consist of 27 finned tubes. The maximum steam pressure of each module is 1 MPa and tested steam pressure is 0.7 MPa. In order to test these heat exchanger modules, we make a 0.5t/h flue tube boiler (LNG, $40\;Nm^3/h$). We tested the heat exchanger module with changing the position of each heat exchanger module. We measured the inlet and outlet temperature of each heat exchanger module and calculated the heat exchange rate. The results show that if module C is placed at second stage (the 1st stage is always module O, bare tube module), there is no need to attach an additional heat exchanger module. In this case the exit temperature of module C is low enough to enter an economizer which is more effective in heat recovery than a heat exchanger module.

  • PDF

A Numerical Analysis of Flow Characteristics in a Heat Recovery Steam Generator with the Change of Inlet Flow Conditions (배열회수보일러(HRSG)의 입구유동 경계조건에 따른 유동특성 변화에 관한 연구)

  • Kim, Tae-Kwon;Lee, Boo-Yoon;Ha, Ji-Soo
    • Journal of the Korean Institute of Gas
    • /
    • v.15 no.3
    • /
    • pp.53-57
    • /
    • 2011
  • The present study has been carried out to analyze the flow characteristics of a heat recovery steam generator with the change of inlet flow conditions by using numerical flow analysis. The inlet of HRSG corresponds the outlet of gas turbine exit and the flow after gas turbine has strong swirl flow and turbulence. The inlet flow condition of HRSG should be included the exit flow characteristics of gas turbine. The present numerical analysis adopted the flow analysis result of gas turbine exit flow as a inlet flow condition of HRSG analysis. The computational flow analysis result of gas turbine exit shows that the maximum axial velocity appears near circular duct wall and the maximum turbulent kinetic energy and dissipation rate exist relatively higher gradient region of axial velocity. The comparison of flow analysis will be executed with change of inlet turbulent flow condition. The first case is using the inlet turbulent properties from the result of computational analysis of gas turbine exit flow, and the second case is using the assumed turbulent intensity with the magnitude proportional to the velocity magnitude and length scale. The computational results of flow characteristics for two cases show great difference especially in the velocity field and turbulent properties. The main conclusion of the present study is that the flow inlet condition of HRSG should be included the turbulent properties for the accurate computational result of flow analysis.

Stress Analysis and Evaluation of Steam Separator of Heat Recovery Steam Generator (HRSG) (배열회수보일러 기수분리기의 응력해석 및 평가)

  • Lee, Boo-Youn
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.17 no.4
    • /
    • pp.23-31
    • /
    • 2018
  • Stress of a steam separator, equipment of the high-pressure (HP) evaporator for a HRSG, was analyzed and evaluated according to ASME Boiler & Pressure Vessel Code Section VIII Division 2. First, from the analysis results of the piping system model of the HP evaporator, reaction forces of the riser tubes connected to the steam separator, i.e., nozzle loads, were derived. Next, a finite element model of the steam separator was constructed and analyzed for the design pressure and the nozzle loads. The results show that the maximum stress occurred at the bore of the riser nozzle. The primary membrane stresses at the shell and nozzle were found to be less than the allowable stress. Next, the steam separator was analyzed for the steady-state operating conditions of operating pressure, operating temperature, and nozzle loads. The maximum stress occurred at the bore of the riser nozzle. The primary plus secondary membrane plus bending stress at the shell and nozzle was found to be less than the allowable stress.

A Numerical Study of the Turbulent Flow Characteristics in the Inlet Transition Square Duct Based on Roof Configuration (4각 안내덕트 루프형상에 의한 난류특성변화 수치해석)

  • Yoo, Geun-Jong;Choi, Hoon-Ki;Choi, Kee-Lim;Shin, Byeong-Ju
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.33 no.7
    • /
    • pp.541-551
    • /
    • 2009
  • Configuration of the inlet transition square duct (hereinafter referred to as "transition duct") for heat recovery steam generator (hereinafter referred to as "HRSG") in combined cycle power plant is limited by the construction type of HRSG and plant site condition. The main purpose of the present study is to analyze the effect of a variation in turbulent flow pattern by roof slop angle change of transition duct for horizontal HRSG, which is influencing heat flux in heat transfer structure to the finned tube bank. In this study, a computational fluid dynamics(CFD) is applied to predict turbulent flow pattern and comparisons are made to 1/12th scale cold model test data for verification. Re-normalization group theory (RNG) based k-$\epsilon$ turbulent model, which improves the accuracy for rapidly strained flow and swirling flow in comparison with standard k-$\epsilon$ model, is used for the results cited in this study. To reduce the amount of computer resources required for modeling the finned tube bank, a porous media model is used.

Analysis of Start-up Characteristics of a Heat Recovery Steam Generator Considering Thermal Constraints (열적 제한요소를 고려한 열회수 증기발생기의 시동 특성 해석)

  • Kim, Young Il;Kim, Tong Seop;Kim, Jae Hwan;Ro, Sung Tack;Kauh, Sang Ken
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.23 no.11
    • /
    • pp.1410-1417
    • /
    • 1999
  • A thorough understanding of the transient behavior during start-up is essential in the design and operation of the heat recovery steam generator(HRSG). During this period of time, material that is exposed to high temperature and experiences a large temperature variation is subject to high thermal stress. In this work, a transient formulation of the HRSG is constructed including the estimation of the thermal stress and fatigue of the drum wall. Start-up behavior of a single-pressure HRSG is analyzed and the effect of bypassing part of the gas turbine exhaust flow on the thermal stress evolution is examined. It is found that the modulation of the gas flow rate using a bypass damper is very useful in view of reducing the thermal stress of the drum and ensuring the fatigue lifetime.

Performance Design Analysis of the Supercritical Pressure Bottoming System of Combined Cycle Power Plants Using Once-Through Steam Generator (관류형 증기발생기를 사용한 복합발전용 초임계압 하부시스템의 성능 설계해석)

  • 양진식;김동섭;노승탁
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.26 no.10
    • /
    • pp.1370-1377
    • /
    • 2002
  • This study analyzed the design performance of the bottoming system of combined cycle power plants using a once-through heat recovery steam generator. For a parallel arrangement of the main heater and reheater, parametric analyses were carried out to present the criteria for determining the reheater pressure and the location of the starting point of the reheater in the HRSG. The performance of the bottoming system was presented fer a range from high subcritical to supercritical pressure. The steam turbine power is as high as that of conventional triple-pressure bottoming systems. The serial arrangement of heat exchangers with division of each heater into several segments can achieve similar power level.

Dynamic Simulation of Heat Recovery Steam Generator (폐열회수 보일러의 동특성 시뮬레이션)

  • Lee, Ki-Hyun;Lee, Dong-Su;Cho, Chang-Ho
    • Proceedings of the KSME Conference
    • /
    • 2001.11b
    • /
    • pp.847-852
    • /
    • 2001
  • A thorough understanding of the transient behavior during load following and start-up is essential in the design and operation of an heat recovery steam generator(HRSG). During this period of time, material that is exposed to high temperature and experiences a large temperature variation is subject to high thermal stress. APESS(Advanced Plant Engineering & Simulation System) is a dynamic simulation software for power plant which is under being developed by Doosan Heavy Industries & Construction Co., Ltd. This paper present the introduction of APESS and the result of simulation for an heat recovery steam generator.

  • PDF