• Title/Summary/Keyword: health stepping stone project

Search Result 1, Processing Time 0.015 seconds

Adjustment of the Appropriate Cost Support Rate for Measuring the Working Environment (작업환경측정 적정 비용지원율 수준으로의 조정 방안)

  • Park, Ji-Yeon
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.31 no.4
    • /
    • pp.353-366
    • /
    • 2021
  • Objectives: An appropriate level of cost support is being proposed to maximize the participation rate. In addition, as the amount of support is highly concentrated at the level of the limit under the current level of supports, the level of cost support is low when the actual level of cost of measuring the working environment exceeds the limit. This paper describes the adjustment of an appropriate cost support rate. Methods: First, this paper analyzes the current cost support status using data from the KOSHA. Second, an alternative for adjusting the cost support rate is presented in consideration of the incentive aspect. Third, we present simulation results for the average cost support rate, the impact of each alternative on finance, and more. Fourth, the most desirable adjustment method is presented after comparing and analyzing the results of various alternatives. Results: In this paper, we present a new scale model. This model is a mixture of flat-rate, fixed rate, and subside cap. It is expected that the new model will not only facilitate participation in businesses with low measurement costs, but also have the effect of controlling measurement costs for institutions that incur greater costs. It is also expected that setting a cap will have the effect of considering government finances and inducing excessively costly institutions to reduce costs. Thus, the new model is likely to be superior to others. If the fourth plan is applied to new businesses and the fifth plan is applied to sustainable businesses, the average cost support rates will be 87.68 percent and 65.18 percent, respectively, and the needed finances will be 2.5 billion won, 18.8 billion won, and 21.3 billion won in total. Conclusions: It seems most desirable to introduce a new model that combines flat-rate, fixed-rate, and subsidy cap systems and achieve an appropriate cost support rate through this model.