The Journal of the Korea institute of electronic communication sciences
/
v.10
no.8
/
pp.953-958
/
2015
Generally, Urban railway have special characteristics with short distance journey and minimum headway intercity transportation. These days, urban railway operators choose the driverless operation system without driver. On the contrary, Conventional & high speed railway utilize for long distance and high speed running. Because of special conditions of freight railway operation compared with urban railway, operation of conventional & high speed railway is showed very different characteristics. In this paper, We compares different operation scheme of urban railway and conventional & high speed railway and then present condition for train control system based on radio.
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.8
/
pp.1064-1069
/
2014
The railway signalling system plays an essential role in the headway and routing control for a safe and efficient train operation. The reliable and safe operation of the system is very important because the failure of the railway signalling system can lead to the collision, derailment, or unexpected stop of a train. So far, the conventional wayside signal mode (ATS: Automatic Train Stop) has been generally used as the railway signalling system. However, this system is highly linked to a risk of major accidents resulted from human mistakes such as missing a signal or careless control of train speed. Accordingly, the onboard signal mode (ATC: Automatic Train Control) as an alternative of ATS has been recently introduced and applied to transmit effectively the information on speed control of a train by using computers and communication equipment. In the process of replacing the obsolete signal system, it is necessary to switch over the system while providing passengers with normal services. Therefore, the integration of a railway signaling system compatible for both ATS and ATC and its interface is discussed in this study. In particular, the implementation scenario required for operation planning of the integrated system was designed, and the results as well as effects of its applicability test were also presented.
In the major operation section of urban railway, there has been occurred habitual delay, and delay propagation and spread to consecutive trains. Therefore, this delay cause the increase of operation time and irregular operation, also the increase of crowd and inconvenience to passengers. The railway operation plan is a promise to passengers and must have reliability. In the case of high frequency urban operation, dwell time have considerable influence on operational headway, so it is very important to efficiently plan and control the dwell time at stations. In this paper, the survey of the research on dwell time for urban railways is presented. The practical estimation model for minimum required dwell time, and the numerical example and validity are proposed.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.11
/
pp.1-9
/
2016
Train control systems have changed from wayside electricity-centric to onboard communications-centric. The latest train control system, the CBTC system, has high efficiency for interval control based on two-way radio communications between the onboard and wayside systems. However, since the wayside system is the center of control, the number of input trains to allow a wayside system is limited, and due to the cyclic-path control flows between onboard and wayside systems, headway improvement is limited. In this paper, we propose a train interval-control and train-centric distributed interlocking algorithm for an autonomous train-driving control system. Because an autonomous train-driving control system performs interval and branch control onboard, both tracks and switches are shared resources as well as semaphore elements. The proposed autonomous train-driving control performs train interval control via direct communication between trains or between trains and track-side apparatus, instead of relying on control commands from ground control systems. The proposed interlocking algorithm newly defines the semaphore scheme using a unique key for the shared resource, and a switch that is not accessed at the same time by the interlocking system within each train. The simulated results show the proposed autonomous train-driving control system improves interval control performance, and safe train control is possible with a simplified interlocking algorithm by comparing the proposed train-centric distributed interlocking algorithm and various types of interlock logic performed in existing interlocking systems.
The Transactions of The Korean Institute of Electrical Engineers
/
v.62
no.9
/
pp.1324-1328
/
2013
The reason of train location detection is generally the train interval control between the railway stations and the train path control in the railway station yard in order to avoid train collision. It is very important to know the train location for shortening the train headway, and improving the efficiency of railway maintenance as well as the safe operation of trains. Therefore, the accurate detection of train location is the prerequisite technology in railway signalling system. The track circuit and the wheel sensor of rolling stock have been used to detect the train location widely in urban railway as well as high speed train. The track circuit is continuously monitored by electrical equipment to detect the absence of the train and the tachometer and encoder is used for the wheel sensor to measure the train speed. But speed sensor failures are frequent due to the extremely harsh operating conditions encountered in rail vehicle. The CBTC(Communication based Train Control) system has been used in urban railway system recently. But the installation of CBTC system is very high and the modification of design is difficult. This paper deals with the feasibility of new train location detection method using magnetic sensors.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.9
/
pp.6274-6281
/
2015
Radio-based train control system has driving headway shortening effect by real-time train interval control using two-way radio communication between onboard and wayside systems, and reduces facility investment because it does not require any track-circuit. Automatic train protection(ATP), the most significant part of the radio-based train control system, makes sure a safe distance between preceding and following trains, based on real-time train location tracing. In this paper, we propose the overall ATP train interval control algorithm to control the safe interval between trains, and preprocessing-based speed profile calculation algorithm to improve the processing speed of the ATP. The proposed speed profile calculation algorithm calculates the permanent speed limit for track and train in advance and uses as the most restrictive speed profile. If the temporary speed limit is generated for a particular track section, it reflects the temporary speed limit to pre-calculated speed profile and improves calculation performance by updating the speed profile for the corresponding track section. To evaluate the performance of the proposed speed profile calculation algorithm, we analyze the proposed algorithm with O-notation and we can find that it is possible to improve the time complexity than the existing one. To verify the proposed ATP train interval control algorithm, we build the train interval control simulator. The experimental results show the safe train interval control is carried out in a variety of operating conditions.
Journal of the Korea Institute of Information and Communication Engineering
/
v.25
no.8
/
pp.1074-1081
/
2021
It has recently been noticed that the headway of unlicensed wireless technology is necessary as user's demands of wireless tech increase and the development of high-speed data service by using low-power short-range wireless network is needed. Hence, it is inevitable to study sharing and coexistence for broadband spectrum of diverse unlicensed application with wide bandwidth. In this paper, an interference examination between unlicensed WiFi (Wireless Fidelity) in the 6GHz and OB (Outside Broadcasting) system which is an incumbent service in the same frequency band was conducted and it suggests separation distance for the coexistence. Thus, MCL (Minimum Coupling Loss) and MC (Monte Carlo) methods were used to set up interference scenarios for the interference analysis and compute the separation distance between two systems according to the same frequency band and frequency separation.
KSCE Journal of Civil and Environmental Engineering Research
/
v.14
no.6
/
pp.1273-1279
/
1994
There are 3 cases that only permissive left-turn(PLT) vehicles use the possible lane for PLT. In these cases, left turn and through movements can not be included in the same lane group, hence saturation flow rate and left turn adjustment factor of PLT are obtained separately from through movement. In capacity analysis procedures at signalized intersection with PLT phasing, PLT capacity should be known to discriminate among 3 cases stated above. The capacity is directly used not only to get saturation flow rate and left turn adjustment factor, but as a threshold for the feasibility of PLT control. This study calculated through field data the critical gap and minimum headway of left turn which affect the PLT capacity. The capacity was obtained by using theoretical models, which consequently could be used to calculate the saturation flow rate and left turn adjustment factor.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.6
/
pp.1116-1122
/
2009
ATS(Automatic Train Stop) system makes train stop when it runs over the speed limit and ensure the safe operation of train. Seoul Metro line 2 in Korea, which started its passenger service in 1982, has adopted ATS system for its signaling system. The ATS system has only a train stop function at the time of emergency, and Seoul Metro is planning to replaced them with ATC(Automatic Train Control)/ATO(Automatic Train Operation) system which can provide the dedicated speed control for headway reduction and automatic operation of train. Until all the ATS system is replaced with the new ATC system, both systems are to operate simultaneously at the same metro line. In this situation, ATS system sometimes reveals improper operation: train stops suddenly without any obstacles in front of it. These emergency stops cause interruption of passenger service, and abnormal abrasion of wheels and rail. This paper makes it clear that these interruptions are caused by EMI phenomena between ATS on-board device and ATC wayside device : Signal current flowing in AF track circuit of ATC is turn out to be a EMI source that prevent normal operation of the ATS on-board device. Although the two systems have different frequency-ranges (ATS system has frequency range between $78{\sim}130$[kHz] and ATC system has frequency range between $9.5{\sim}16.5$[kHz]), it turned out that EMI phenomena appears between the both systems. This is investigated by measuring the output signal from ATS on-board device passing over ATC wayside device. The FFT(Fast Fourier Transform) analysis of the signal reveals that AF track circuit signal is transmitted to the ATS on-board device and induce noise causing improper operation. The countermeasures to the EMI phenomena are examined in three ways; blocking EMI transmission, enforcement of EMS (Electromagnetic Susceptibility) of ATS on-board device, and blocking the EMI source. It is suggested that the practical solution be blocking EMI source temporarily, that is breaking AF track circuit signal when the trains with ATS on-board device pass over it. To this purpose, TODS(Train Occupation Detection System) is developed, and has made a success in preventing the EMI problem of Seoul Metro line 2.
KSCE Journal of Civil and Environmental Engineering Research
/
v.36
no.6
/
pp.1075-1082
/
2016
In order to calculate the optimum installation interval between a speed hump and hump type crosswalk that are installed continuously in succession, this study examined the speed of a vehicle that passes different intervals between speed humps and hump type crosswalks from the approach section of a roundabout having a maximum speed limit of 30km/h; analyzed the effects of speed humps and hump type crosswalks installed continuously in succession on vehicle driving speed; and simulated the optimum installation height of hump type crosswalk. As a result, the following conclusion was drawn. First, it was found that the optimum interval between a speed hump and hump type crosswalk, which are the representative traffic calming techniques for reducing vehicle speed, to control vehicle speed under 30km/h is 30m. Second, as a result of comparing the deceleration of a vehicle that pass hump type crosswalks, it was found that if the installation interval is 65 m and above, a speed hump and hump type crosswalk had no effect. Therefore, it is desirable that the maximum installation interval between a speed hump and hump type crosswalk for controlling vehicle speed within a fixed road section should not exceed 65m. Third, the analysis showed that the optimum installation height of hump type crosswalk is 6-8cm in case vehicle speed at the approach section is 20km/h or lower, 8-10cm in case of 30km/h, and 10cm in case of 30km/h or higher, respectively. Fourth, even at a road section on which a speed hump and hump type crosswalk are installed, speed reduction effects may sometimes be insignificant due to a driver's studying effect, traffic conditions and so on. Thus, it is judged that speed reduction effects will be greater if several traffic calming techniques such as speed hump, chicane, and choker are applied at the same time. Therefore, in case of applying traffic calming techniques for the purpose of reducing vehicle speed in order to promote pedestrian safety, the composite application of several techniques should be considered.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.