• Title/Summary/Keyword: guidelines of repair

Search Result 83, Processing Time 0.024 seconds

Characterization of Fracture Behavior in Repaired Skin/Stiffener Structure with an Inclined Central Crack

  • Chung, Ki-Hyun;Yang, Won-Ho;Heo, Sung-Pil
    • Journal of Mechanical Science and Technology
    • /
    • v.16 no.5
    • /
    • pp.599-608
    • /
    • 2002
  • Finite element analysis for the stress intensity factor (SIF) at the skin/stiffener structure with inclined central crack repaired by composite stiffened panels is developed. A numerical investigation was conducted to characterize the fracture behavior and crack growth behavior at the inclined crack. In order to investigate the crack growth direction, maximum tangential stress (MTS) criterion are used. Also, this paper is to study the performance of the effective bonded composite patch repair of a plate containing an inclined central through-crack. The main objective of this research is the validation of the inclined crack patching design. In this paper, the reduction of stress intensity factors at the crack-tip and prediction of crack growth direction are determined to evaluate the effects of various non-dimensional design parameter including; composite patch thickness and stiffener distance. We report the results of finite element analysis on the stiffener locations and crack slant angles and discuss them in this paper. The research on cracked structure subjected to mixed mode loading is accomplished and concludes that more work using a different approaches is necessary. The authors hope the present study will aid those who are responsible for the repair of damaged aircraft structures and also provide general repair guidelines.

Seismic repair of exterior R/C beam-to-column joints using two-sided and three-sided jackets

  • Tsonos, Alexander G.
    • Structural Engineering and Mechanics
    • /
    • v.13 no.1
    • /
    • pp.17-34
    • /
    • 2002
  • The use of local two-sided and three-sided jacketing for the repair and strengthening of reinforced concrete beam-column joints damaged by severe earthquakes is investigated experimentally and analytically. Two exterior beam-column joint specimens ($O_1$ and $O_2$) were submitted to a series of cyclic lateral loads to simulate severe earthquake damage. The specimens were typical of existing older structures built in the 1960s and 1970s. The specimens were then repaired and strengthened by local two-sided or three-sided jacketing according to UNIDO Manual guidelines. The strengthened specimens ($RO_1$ and $RO_2$) were then subjected to the same displacement history as that imposed on the original specimens. The repaired and strengthened specimens exhibited significantly higher strength, stiffness and better energy dissipation capacity than the original specimens.

A study on the improvement plan for precision safety diagnosis and seismic repair and reinforcement measures according to seismic performance evaluation (내진성능평가에 따른 정밀안전진단 및 내진 보수보강 조치의 개선방안 연구)

  • Kim, Jang-Ook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.87-88
    • /
    • 2022
  • For an earthquake-safe urban environment, the Republic of Korea conducts seismic performance evaluation in accordance with laws and guidelines to assign safety ratings and implement necessary management measures such as repairs and reinforcements. In the seismic performance evaluation result, structures lacking in preparation for earthquakes are prioritized and classified into measures such as repair, reinforcement, or careful observation to respond to physical risks such as earthquakes. Such repair and reinforcement work is not a one-time thing, but it is necessary to further enhance the effect through continuous follow-up observation. In this study, the location of the vertical and horizontal displacement measuring part of the construction part is displayed so that the post-construction status of the reinforcement construction part can be visually checked by identifying the problems in the process of post-monitoring in 2022 for the maintenance and reinforcement work of local governments' public facilities carried out in 2021. We propose a plan to institutionalize the installation of, inspection tools, and crack gauges at certain locations in the construction department, and to have facility managers periodically inspect and manage them with a smartphone program or the 'Facility Autonomous Safety Inspection' app.

  • PDF

Steam Generator Management Program (원전 증기발생기 관리프로그램)

  • Cho, Nam-Cheoul;Kim, Moo-Soo;Lee, Kwang-Woo
    • Proceedings of the KSME Conference
    • /
    • 2003.04a
    • /
    • pp.610-616
    • /
    • 2003
  • Recently, the common concern of nuclear power industry in the development of technology mitigating and preventing the aging of steam generator tubes prevails, because the trends of steam generator flaws at Uljin unit #1,2 and KSNP(Korea Standard Nuclear Power Plant) impose a burden on the operation of nuclear power plant. While the regulatory agency is demanding the establishment of the advanced general performance maintenance system, the steam generator management program adapting advanced technology is being developed which may comply with EPRI PWR SG Guidelines based on NEI 97-06 ‘ General Guidelines including all the maintenance aspects consist of the tube integrity assessment criteria, repair limit, allowable leakage level, water chemistry will be composed in order to obtain the approval of regulatory agency and be applied to Nuclear power plant early 2005. This presentation is to introduce maintenance state including SG tube degradation and main contents of advanced SG management program being developed, and futhermore update present and future plan, and estimate the alternation after the completion.

  • PDF

Reliability and Availability Modeling of the MIN (Multistage Interconnection Network) System (신뢰도를 고려한 다단계 스위치 망의 성능 분석)

  • 이강원
    • Korean Management Science Review
    • /
    • v.15 no.1
    • /
    • pp.63-76
    • /
    • 1998
  • Reliability evaluation methodologies of the multipath MIN system are reviewed and critically compared. Some guidelines are proposed to select efficient evaluation method for the system designers to use. Considering the switch failure and repair characteristics of the MIN system, three types of Markov models are proposed for the MIN system availability models. These models can be used for the MIN performance analysis. The performance of the MIN system are supposed to vary according to the failure state of the system.

  • PDF

A Study on the Correlation between Damage and Repair Volume of Bridge Maintenance (교량 유지보수의 손상물량과 보수물량 상관관계 연구)

  • Lee, Changjun;Park, Taeil
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.4
    • /
    • pp.577-585
    • /
    • 2024
  • Infrastructure plays a crucial role in the industrial development and economic growth of a nation. However, recently, domestic infrastructure has been causing not only safety risks due to aging but also social and economic inefficiencies, increasing the need for maintenance. In particular, the deterioration rate of bridges is serious, so application of appropriate repair and rehabilitation methods and estimation of its quantity are required. In this study, frequently applied repair methods for bridges using data from the Facility Integrated Management System (FMS) were identified. the empirical correlation between damage volume and the repair volume was analyzed using Bridge Management System (BMS) data. The result of the analysis showed that the ratio of the repair volume to the damage volume was 1.0. The guideline, on the other hand, suggest 1.5 the ratio of the repair volume to the damage volume. Although the guidelines differently present more conservative figures considering safety, this study is significant in that it presents a practical ratio through data analysis results. This results can be used to develop a model that can calculate the amount of repair and rehabilitation of various facilities in the future.

Outcomes of Open Repair of Mycotic Aortic Aneurysms with In Situ Replacement

  • Kim, Hyo-Hyun;Kim, Do Jung;Joo, Hyun-Chel
    • Journal of Chest Surgery
    • /
    • v.50 no.6
    • /
    • pp.430-435
    • /
    • 2017
  • Background: Mycotic aortic aneurysms are rare and life-threatening. Unfortunately, no established guidelines exist for the treatment of patients with mycotic aortic aneurysms. The purpose of this study was to evaluate the midterm outcomes of the open repair of mycotic thoracic and thoracoabdominal aneurysms and suggest a therapeutic strategy. Methods: From 2006 to 2016, 19 patients underwent open repair for an aortic aneurysm. All infected tissue was extensively debrided and covered with soft tissue. We recorded the clinical findings, anatomic location of the aneurysm, bacteriology results, antibiotic therapy, morbidity, and mortality for these cases. Results: The median age was $62{\pm}7.2years$ (range, 16 to 78 years), 13 patients (68%) were men, and the mean aneurysm size was $44.5{\pm}4.9mm$. The mean time from onset of illness to surgery was $14.5{\pm}2.4days$. Aortic continuity was restored in situ with a Dacron prosthesis (79%), homograft (16%), or Gore-Tex graft (5%). Soft-tissue coverage of the prosthesis was performed in 8 patients. The mean follow-up time was $43.2{\pm}11.7months$. The early mortality rate was 10.5%, and the 5-year survival rate was $74.9%{\pm}11.5%$. Conclusion: This study showed acceptable early and midterm outcomes of open repair of mycotic aneurysms. We emphasize that aggressive intraoperative debridement with soft-tissue coverage results in a high rate of success in these high-risk patients.

Repair and Replacement Methodology for Electrical Equipment Used in Nuclear Power Plants (원자력발전소 전기기기의 보수, 교체 방법론)

  • Park, Chulhee;Park, Wan-gyu;Lee, Manbok;Kim, Choon-sam
    • Proceedings of the KIPE Conference
    • /
    • 2018.07a
    • /
    • pp.177-179
    • /
    • 2018
  • After Fukushima nuclear accident at 2011, nuclear industrial has been focused on operation and maintenance phase, not design and construction phase. Continued good operating performance of nuclear power plants has been the best critical issue to nuclear utilities. Replacement for complete components as well as parts of components is being procured because nuclear utilities must maintain safety and reliability of operating nuclear power plants. However, many suppliers and manufacturers are giving up a nuclear quality assurance program under reduction in new construction of nuclear power plants. It is able to be increased difficulty in procuring spare parts to support operations and maintenance of nuclear power plants. Over 20% of nuclear power plant equipment in some countries is obsolete. Owing to obsolescence of nuclear safety-related items and/or withdrawing a nuclear quality assurance program of suppliers and manufactures, some replacement item and part might be procured to the item not covered by appendix B to USNRC 10 CFR Part 50. Under various methods of the nuclear repair and replacement methodology, utilities are supposed to establish a typical program for a repair and replacement of an electrical equipment and its parts in conjunction with a nuclear quality assurance. Concerning this typical program, this study suggests the repair and replacement methodology of electrical equipments used in nuclear power plants by procurement of a power supply, based on nuclear regulations, codes, standards, guidelines, specific and general technical information, etc..

  • PDF

Estimation of Residual Strength for an Aged Floating Dock (노후화된 플로팅도크의 잔류 구조강도 평가)

  • Seo, Kwang-Cheol;Hong, Taeho;Park, Joo-Shin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.25 no.1
    • /
    • pp.122-129
    • /
    • 2019
  • Due to its nature the manufacturing industry faces a cyclical economy, and therefore there is an urgent need for a companion industry to cope with this cyclic pattern in the long run. The sector suitable for meeting this demand is the repair and shipbuilding industry. In order to operate a shipbuilding repair business, a floating dock is indispensable, and most obsolete floating docks were imported from overseas and operated through repair/maintenance. However, there is no precise guideline for floating dock safety, and most models have been in use for at least 30 years without being required to enter classification at the time of operation. In this study, structural strength analysis was carried out using measured thickness information of aged floating docks, and the residual structural strength of floating docks in operation was analyzed. The main results derived from this study can be referred to as guidelines for the review of the structural safety of similar equipment, and it is expected that an optimal solution will be found within a short time using this method for repair/maintenance.

Perception Survey on the Necessity of Improvement for the Standard Buoys Fouling Maintenance

  • Yoo, Yun-Ja;Kim, Tae-Goun;Gug, Seung-Gi
    • Journal of Navigation and Port Research
    • /
    • v.43 no.2
    • /
    • pp.93-100
    • /
    • 2019
  • In 2001, about 20 years after the introduction of the standard buoys, the natural environment and maritime traffic flow changes in the waters near Korea and the necessity of improvement of the AtoN (Aids to Navigation) maintenance was suggested. The IALA provides guidelines for maintenance and management of AtoN, and Korea provides guidelines for the management and operation of standard buoys by means of the Enforcement on the AtoN laws. The objective of this study was to investigate the installation status and the repair status of the standard type buoys by sea area in order to improve the management and operation of the steel standard buoys. In addition, a survey was conducted on the improvement of the steel buoy fouling and the improvement of the lifting inspection cycle towards on the AtoN managers and producers of the representative authority by sea area. In the case of LL-26 (M) buoy type, the standard type buoy installation status of Korea in 2017 was 57.1%, and the LL-26 (M) type was 58.9% showing the highest repair rate. According to the results of the survey on buoys fouling, 51.2% were caused by the attachment of shellfish, and 43.2% were caused by bird feces. The results of the survey on the improvement of the regular buoy inspection cycle showed that the measures are to maintain the current inspection period of 2 years regardless of the characteristics of the sea area (water depth, inside and outside port, buoy size, etc.).