• Title/Summary/Keyword: guidelines of repair

Search Result 83, Processing Time 0.022 seconds

The Field Operation and Policies of Repair Works for Architectural Treasures in Late Japanese Colonial era based on Repair Works of Hwaumsa Kakhwangjeon (화엄사 각황전 수리공사를 통해 본 「보존령」 제정 이후 일제강점기 보물 건조물 수리공사의 현장운영과 수리방침)

  • Seo, Hyo-Won;Jeon, Bong-Hee
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.1
    • /
    • pp.41-52
    • /
    • 2018
  • The purpose of this study is to examine the circumstances of repair works after enacting "Low for Conservation of Joseon Treasure, Historic Site, Scenic Beauty & Natural Monument (朝鮮寶物古跡名勝天然記念物保存令)". For this purpose, the official documents produced by the Government-general Museum of Joseon were analyzed. They included the contents of repair works of Hwaumsa Kakhwangjeon(華嚴寺 覺皇 殿). As a result, this study reveals that the repair work of Hwaumsa Kakhwangjeon had become a momentum of introducing specific guidelines such as "Guidelines for Architectural Treasure's Repair 寶物建造物修理施行準則", "Regulations for administration of Hwaumsa Kakhwangjeon's repair work 華嚴寺覺皇殿修理工事取扱手續)". The guidelines and regulations systematized the planning phase of the repair works and provided to organize the field office formed by experts. In spite of these positive changes, the repair works were controlled by the central government to the certain extent, and the Japanese repair techniques were mingled with traditional techniques recklessly.

Improvement of Supervision Work in Cultural Heritage Repair (문화재 감리업무 개선방안 연구)

  • Park, Hwan-Pyo;Han, Jae-Goo;Kim, Kyong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.1
    • /
    • pp.61-71
    • /
    • 2020
  • The Cultural Heritage Administration is operating the resident supervision and non-resident supervision system to prevent poor repair and ensure the quality of cultural heritage repairs And recently, responsible supervision system was introduced to enhance the supervision of cultural heritage repairs. However, many problems have arisen in the operation of the supervision work, and need improvement. Accordingly, this study improved the resident and non-resident supervision of cultural heritage repair and developed work guidelines for the responsible supervision. First, this research has derived unreasonable sectors and problems of work guidelines for resident supervision about cultural heritage repair and has suggested supervision work guidelines which are improved. Second, we have derived the problems of work guidelines for non-resident supervision about cultural heritage repair and has suggested non-resident supervision work guidelines which are improved. Third, this paper has proposed the development direction and detailed supervision work to perform responsible supervision as a result of the adoption of the supervision system for cultural heritage repair.

A Study on Guidelines for the Repair of Water-Leakage Cracks in Concrete Structures (콘크리트 구조물에 있어서 누수균열 보수를 위한 일반지침 제안 연구)

  • Oh, Sang-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.97-107
    • /
    • 2010
  • This study outlines a successful and effective plan for repairing water-leakage cracks in concrete structures. The lack of adequate solutions for water-leakage cracks often results in unnecessarily high repair costs, and as such this remains a problem that requires constant attention. Unfortunately, despite the availability of a vast number of different materials and methods, it is often difficult to attain a perfect waterproof sealing The reason for the difficulties in the repair of water-leakage cracks can be attributed to an insufficient knowledge and understanding of the negative factors (i.e., chemical and physical (mechanical) conditions) that cause water-leakage cracks, and of the properties of the repair materials and methods. In this study, guidelines and methods for the selection of adequate materials for the repair of water-leakage cracks in concrete structures were developed for countries that do not already have general guidelines on this subject, and for local regulatory authorities elsewhere.

Long-term results of unilateral cleft lip repair with multiple infantile hemangiomas including one involving the cleft side of the upper lip

  • Jeong, Dae Kyun;Lee, Jae Woo;Choi, Soo Jong;Bae, Yong Chan
    • Archives of Plastic Surgery
    • /
    • v.47 no.3
    • /
    • pp.263-266
    • /
    • 2020
  • Infantile hemangiomas have a growth phase and an involution phase. For this reason, serial observation has generally been recommended as the treatment for uncomplicated infantile hemangiomas. Recently, however, individualized approaches have been emphasized. Although cleft lip and infantile hemangioma are common congenital diseases, infantile hemangiomas on the cleft side (i.e., in the operative field of the cleft lip) are extremely rare, and no clear guidelines have been established for their treatment. We experienced a case in which a patient with a cleft lip had an infantile hemangioma on the cleft side. In accordance with general treatment guidelines, cleft repair was performed 3 months after birth. The Millard rotation-advancement technique, which involves the use of a lower small triangular flap, was used for the repair. No intraoperative complications, such as massive bleeding, or postoperative complications were noted. The patient has received regular follow-up for the past 18 years, and other than a reddish scar on the lower lip, he currently has no related issues. Therefore, this case demonstrates that cleft lip repair performed according to cleft lip treatment guidelines produces good outcomes, even in cases involving a hemangioma on the cleft side.

A Study on the maintenance situation of the deteriorted high-rise apartments (노후 고츨아파트의 유지관리 및 개선실태 조사)

  • 주서령;이미정
    • Journal of the Korean housing association
    • /
    • v.12 no.3
    • /
    • pp.75-83
    • /
    • 2001
  • The deteriorted high-rise apartments make a social problem in now days. As a result, and new alternative plan for deteriorted high-rise apartments such as the remodeling concept must be considered. This study aims to develop the remodeling items which is the guide lines when remodeling of the apartment will be conducted. Thorough the case studies of maintenance and repair status of the deteriorted apartments in seoul, reasonable guidelines for selection of remodeling items were developed. Physical maintenance items includes those that need major repair activity like wall painting, water proof roof, change/repairs/implement of heating system, boiler, city gas pipelines, cold and hot water pipes, elevators, cleaning of water tanks. The period of repair is shorter than the durable year of law or codes. As a result of the study, basic maintenance items and actual repair period were proposed. This result will be the basic guidelines for remodeling items.

  • PDF

Repair work of Sasungjeon, one of the main building of Jangansa temple, and an attempt to transform the repair system of historic architecture in 1940s (금강산 장안사 사성전 보존 수리공사와 1940년대 수리체제 전환 시도)

  • Seo, Hyowon
    • Journal of architectural history
    • /
    • v.29 no.4
    • /
    • pp.7-16
    • /
    • 2020
  • The purpose of this study is to reveal the development process of modern repair systems in the Korean peninsula. Sasungjeon, one of the main buildings of Jangansa temple located in Geumgangsan, was repaired from 1941 to 1944. It was the very last restoration work of historic wooden architecture performed during the Japanese colonial era. This work was delayed multiple times because of insufficient materials and human resources. The Bureau of Education(學務局), which was in charge of repair work, understood that the problems of the repair system and suggested reorganizing the system as a solution. This study examined the repair work of Sasungjeon as a background of the bureau's suggestion and considered this suggestion as an attempt to transform the repair system.

A Study on the Development of Remodeling Items for Apartments (공동주택 리모델링 항목개발을 위한 조사연구)

  • 이미정;주서령
    • Journal of the Korean housing association
    • /
    • v.13 no.2
    • /
    • pp.7-14
    • /
    • 2002
  • The deteriorated high-rise apartments make a social problem in now days. As a result, an new alternative plan for deteriorated high-rise apartments such as the remodeling concept must be considered. This study aims to develop the remodeling items which is the guide lines when remodeling of the apartment will be conducted. Thorough the previous case studies of maintenance and repair status of the deteriorated apartments in Seoul, the analysis of the period of repair and improvement and the degree of request far remodeling items, reasonable guidelines for selection of remodeling items were developed. According to the ages of apartments As a result of the study, basic guidelines fur selection of remodeling items were proposed.

Quasi-Static Test for Seismic Performance of R/C Bridge Piers Retrofitted with Glassfibers (준정적실험에 의한 섬유보강된 철근콘크리트 교각의 내진성능 평가)

  • 이대형;이재형;정영수;박진영
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.05a
    • /
    • pp.871-876
    • /
    • 2001
  • Recent earthquakes in California and Japan caused extensive damage to highway bridge structures. It is also thought that during probable earthquakes bridge structures in Korea could be failed due to the structural deficiencies, which were nonseismically designed and constructed before 1992. In these regards, innovative strengthening methods have been developed to repair reinforced concrete bridge columns, especially by glassfiber sheet bonding methods which are widely used today. The primary objective of this research is to investigate the seismic behavior of RC bridge columns retrofitted with composite straps and to propose pertinent guidelines of repair and rehabilitation method for earthquake resistant design procedure of RC bridges which are located in low or moderate seismicity regions. Six scaled-down concrete test specimens were made with test variables such as lap splice ratio, axial force ratio, confinement ratio, composite straps in the plastic hinge region. Pertinent design guidelines could be developed for the earthquake resistant design of RC bridge piers retrofitted with glassfibers in low or moderate seismic region.

  • PDF

Delayed surgical repair of the deltoid following acromioplasty: a case report

  • Zohaib Sherwani;Chase Kelley;Hassan Farooq;Nickolas G. Garbis
    • Clinics in Shoulder and Elbow
    • /
    • v.25 no.4
    • /
    • pp.334-338
    • /
    • 2022
  • Currently, the literature contains few studies that describe any potential complications following arthroscopic acromioplasty. Because part of the anterior deltoid originates from the anterior acromion, there is a risk for violation and subsequent iatrogenic rupture or avulsion during this procedure. This type of injury can be a devastating problem for patients that may lead to poor function and debilitating pain. We present a patient with deltoid insufficiency following arthroscopic acromioplasty who elected to proceed with operative management with a planned arthroscopic evaluation of the shoulder followed by an open deltoid repair. At the final follow-up visit 2.5 years postoperatively, the patient reported improved pain from baseline and no residual disability and was able to perform most activities of daily living without difficulty. This case serves as an example of a surgical repair for a deltoid avulsion following arthroscopic acromioplasty. As there is still a lack of standard guidelines, our suture repair technique can be considered one method of treatment for this type of injury.