• Title/Summary/Keyword: ground stress behavior

Search Result 297, Processing Time 0.026 seconds

The Numerical analysis of Top-Base Foundation in Siwha Marine Clay (시화 해성점토 지반에서의 팽이기초의 수치해석연구)

  • Kim, Hyun-Soo;Kim, Hak-Moon;Kim, Chan-Kook
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.1155-1165
    • /
    • 2008
  • Full scale size model tests of the top-base foundation was performed in siwha marine clay and the site measurement results were compared with the analytical results from finite different programs, FLAC-2D to investigate the behavior of top-base foundation. The stress distribution obtained from the numerical analysis for the various types of foundation were compared and analysed during the application of allowable load as well as yield load. It was found that the top-base foundation prevents the lateral deformation of soft ground and stress dispersion effect to reduce the surface settlement, and that the foundation creates uniform stress distribution around it, therefore increasing bearing capacity.

  • PDF

Evaluation of excavation damage zone during TBM excavation - A large deformation FE analysis study (TBM 굴착으로 인한 굴착손상영역 범위 추정 - 대변형 수치해석 연구)

  • Seheon Kim;Dohyun Kim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.26 no.1
    • /
    • pp.1-17
    • /
    • 2024
  • Analyzing the tunnel excavation behavior and its effect on the surrounding ground involves large deformation behavior. Therefore, in order to properly simulate the tunnel excavation process and rigorously investigate the actual effect of excavation on surrounding ground and tunnel structure large deformation analysis method is required. In this study, two major numerical approaches capable of considering large deformations behavior were applied to investigate the effect of tunnel boring machine excavation on the surrounding ground: coupled Eulerian-Lagrangian (CEL) and the automatic remeshing (AR) method. Relative performance of both approaches was evaluated through the ground response due to TBM excavation. The ground response will be quantified by estimating the range of the excavation damaged zone (EDZ). By comparing the results, the range of the EDZ will be suggested on the vertical and horizontal direction along the TBM excavation surface. Based on the computed results, it was found that the size of EDZ around the excavation surface and the tendencies was in good agreement among the two approaches. Numerical results clearly show that the size of the EDZ around the tunnel tends to be larger for rock with higher RMR rating. The size of the EDZ is found to be direct proportional to the tunnel diameter, whereas the depth of the tunnel is inversely proportional due to higher confinement stress around the excavation surface.

Investigation on Water Leakage-Induced Tunnel Structure and Ground Responses Using Coupled Hydro-Mechanical Analysis (수리역학 연계해석을 이용한 누수로 인한 터널 구조물 및 지반 거동의 분석)

  • Dohyun Park
    • Tunnel and Underground Space
    • /
    • v.33 no.4
    • /
    • pp.265-280
    • /
    • 2023
  • Water leakage in tunnels is a defect that can affect tunnel stability and the ground movement by changing the stress and pore water pressure of the surrounding ground. Long-term or large-scale water leaks may lead to damage of tunnel structure and the surrounding environment, such as tunnel lining instability and ground surface settlement. The present study numerically investigated the effects of water leakage on the structural stability of a tunnel and the ground behavior. The tunnel was assumed to be under undrained conditions for preventing the inflow of the surrounding water and leaks occurred in the concrete lining after completion of the tunnel construction. A coupled hydro-mechanical analysis using a TOUGH-FLAC simulator developed in Python was conducted for assessing the leakage induced-behavior of the tunnel structure and ground under different conditions of the amount and location of water leak. Additionally, the effect of hydro-mechanical coupling terms on the results of coupled response was investigated and discussed.

An Experimental Study on the Bearing Capacity and Failure Behavior of Composite Ground Reinforced by RAP Method (RAP 복합지반의 지지력 및 파괴거동에 관한 실험적 연구)

  • 천병식
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.5
    • /
    • pp.127-134
    • /
    • 2004
  • Rammed Aggregate Pier (RAP) has extensive applicability as for a foundation of structures. In this study, bearing capacity of the reinforced ground by RAP and the failure behavior of RAP are investigated through experiments. RAPs with diameters of 45, 60, 70 mm were installed in sand, of which relative densities are 60, 70, 90%. Then, two columns of pressure gauges, near the RAPs and one diameter off from the center of piers, are installed 5, 10, 15, 20, 25, 30 cm from the surface of the ground. The test results show that maximum lateral earth pressure is observed near 5∼10 cm (1.0∼2.0D) from the surface, which indicates the occurrence of bulging failure type. In addition, deformation of RAP in radial direction increases with lower relative density of the ground. Furthermore, lateral stress distribution decreases with depth.

A Study on the Concrete Lining Behavior due to Tunnel Deterioration (터널 열화로 인한 콘크리트 라이닝의 거동에 관한 연구)

  • Han, Young-Chul;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.4
    • /
    • pp.21-34
    • /
    • 2014
  • This paper studies the time-dependent behaviors of tunnel and surrounding ground due to tunnel deterioration. In the first part, the literature on deterioration characteristics of tunnels was reviewed. In the second part, a numerical analysis was performed to investigate the behavior of concrete lining on the typical section of Korean high-speed rail tunnel (weathered rock) after determination of input variables related to deterioration impact. The result shows that the settlement at the crown of tunnel and surface ground increased up to 7.0% and 30.2% of the total settlements during construction stage, respectively, and the internal convergence reduction of 9.0 mm for concrete linings was generated within 30 years after completion of tunnel construction. Also the loosening height increased up to 2.55 times of tunnel height within 50 years, which is higher than that of Terzaghi's recommendation on ultimate state. Due to this process of extending zones, it is found that additional loads were applied to concrete lining with the axial stress about 3.20~3.66 MPa, which accelerates tunnel deterioration. Finally the quantitative design approach to evaluate time-dependent behavior of lining and surrounding ground due to tunnel deterioration was proposed.

The behavior of tunnel and ground according to the loading of building construction on the ground (터널 상부 지반에 시공되는 건물 하중에 따른 터널 및 주변지반의 거동)

  • Cha, Seok-Kyu;Lee, Sang Duk
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.4
    • /
    • pp.731-742
    • /
    • 2018
  • Recently, the construction of the urban area has been rapidly increasing, and the excavation work of the ground has been frequently performed at the upper part of the existing underground structure. Especially, when the structure is constructed after the excavation of the ground, the loading and unloading process is repeated in the lower ground of the excavation so that it can affect existing underground structures. Therefore, in order to maintain the stability of the existing underground structure due to the excavation of the ground, it is necessary to accurately grasp the influence of the excavation and the structure load in the adjoining part. In this study, the effects of the ground excavation and the new structure load on the existing tunnel were investigated by large - scale experiment and numerical analysis. For this purpose, a large model tester with a size reduced to 1/5 of the actual size was constructed, and model tests and numerical analyzes were carried out to investigate the effects of the excavation of the body ground by maintaining the distance between the excavation floor and the tunnel ceiling constant, The impacts were identified. As a result of the study, it was confirmed that the deeper the excavation depth, the larger the influence on the existing tunnel. At the same distance, it was confirmed that the tunnel displacement increased with the increase of the building load, and the ground stress increased up to 2.4 times. From this result, it was confirmed that the effect of the increase of the underground stress on the existing tunnel is affected by the increase of the building load, and the influence of the underground stress is decreased from the new load width above 3.0D.

Numerical Analysis on the Effect of Heterogeneous/Anisotropic Nature of Rock Masses on Displacement Behavior of Tunnel (비균질/이방성 암반에서의 터널 거동 분석을 위한 수치해석적 연구)

  • Baek, Seung-Han;Kim, Chang-Yong;Kim, Kwang-Yeom;Hong, Sung-Wan;Moon, Hyun-Koo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.939-948
    • /
    • 2006
  • The structural anisotropy and heterogeneity of rock mass, caused by discontinuities and weak zones, have a great influence on the deformation behavior of tunnel. Tunnel construction in these complex ground conditions is very difficult. No matter how excellent a geological investigation is, local uncertainties of rock mass conditions still remain. Under these uncertain circumstances, an accurate forecast of the ground conditions ahead of the advancing tunnel face is indispensable to safe and economic tunnel construction. This paper presents the effect of anisotropy and heterogeneity of the rock masses to be excavated by numerical analysis. The influences of distance from weak zone, the size or dimension, the different stiffness and the orientation of weak zones are analysedby 2-D and 3-D finite element analysis. By analysing these numerical results, the tunnel behavior due to excavation can be well understood and the prediction of rock mass condition ahead of tunnel face can be possible.

  • PDF

A comparative study on dynamic behavior of high-rise building and low-rise building considering SSI analysis (SSI 해석을 고려한 초고층 및 저층 건물 동적거동 비교 연구)

  • You, Kwang-Ho;Kim, Seung-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.973-987
    • /
    • 2018
  • Most of the previous seismic analyses have been carried out by separating the ground and structures, and there is a lack of comparative study on the dynamic behavior of high-rise and low-rise buildings. Therefore, in this study, the sensitivity analysis was performed with selected parameters by using a finite element analysis program in order to grasp the dynamic behavior of high-rise and low-rise buildings. As a result, it was turned out that the horizontal displacement, the interstory drift ratio, and the bending stress of a high-rise building were more affected by a long seismic wave than a low-rise buildings. Also, the weak parts of a high-rise and low-rise building were more affected by type of seismic wave than the ground conditions. Therefore, it is inferred that it will be helpful for seismic designs to consider the influence of ground conditions and seismic wave type on buildings.

Behavior of integral abutment bridge with partially protruded piles

  • Park, Min-Cheol;Nam, Moon S.
    • Geomechanics and Engineering
    • /
    • v.14 no.6
    • /
    • pp.601-614
    • /
    • 2018
  • This study presents structural and parametric analyses on the behavior of an integrated and pile-bent abutment with mechanically stabilized earth wall (IPM) bridge. The IPM bridge is an integral abutment bridge (IAB) with partially protruded piles, which excludes earth pressure by means of a mechanically stabilized earth wall developed by the authors. The results of the analysis indicate that the IPM bridge, as any other IAB, is influenced to a large extent by temperature and time-dependent loads. When these loads are applied, the stress on a pile in the IPM bridge decreases as the displacement of the pile top increases, because the piles protrude from the ground surface and no soil reaction is generated on the protruded pile. Because the length of an IAB is restricted by the forces acting on its piles, the IPM bridge is an effective alternative to extend its length.

The Development of Tunnel Behavior Prediction System Using Artificial Neural Network (인공신경망을 이용한 터널 거동 예측 시스템 개발)

  • 이종구;문홍득;백영식
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.2
    • /
    • pp.267-278
    • /
    • 2003
  • Artificial neural networks are efficient computing techniques that are widely used to solve complex problems in many fields. In this study, in order to predict tunnel-induced ground movements, Tunnel Behavior Prediction System (TBPS) was developed by using these artificial neural networks model, based on a Held instrumentation database (i.e. crown settlement, convergence, axial force of rock bolt, compressive and shear stress of shotcrete, stress of concrete lining etc.) obtained from 193 location data of 31 different tunnel sites where works are completed. The study and test of the network were performed by Back Propagation Algorithm which is known as a systematic technique for studying the multi-layer artificial neural network. The tunnel behaviors predicted by TBPS were compared with monitored data in the tunnel sites and numerical analysis results. This study showed that the values obtained from TBPS were within allowable limits. It is concluded that this system can effectively estimate the tunnel ground movements and can also be used f3r tunneling feasibility study, and basic and detailed design and construction of tunnel.