• Title/Summary/Keyword: ground displacement

검색결과 1,210건 처리시간 0.023초

수직전력구 내진설계를 위한 응답변위 산정에 대한 사례 조사 (Case Study of Estimate the Response Displacement for the Seismic Design of Shaft Cable Tunnel)

  • 김용민;정상섬;김영호;권영기
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.634-639
    • /
    • 2009
  • The response displacement method is the most frequently used method for the seismic design of underground structures. Underground structures under seismic loading will tend to deform with the surrounding ground, and thus the structure is designed to accommodate the free-field deformation without loss of its structural integrity. This method is pseudo-static method, and response displacement of surrounding ground are most important steps. In this study, the single cosine method and the equivalent linear analysis are applied to estimate the response displacement of the real sites, and the results of the each method are compared. Response analysis was also performed with respect to bedrock depth. As a results, Equivalent linear analysis result was larger than single cosine method. And, the relative displacement becomes lager according to depth of the bedrock.

  • PDF

SAR 영상을 활용한 지반침하의 위험평가를 위한 지표결정에 대한 연구 (A Study on the Determination of Indicators for the Risk Assessment of Ground Depression Using SAR Imageson)

  • 이효진;윤홍식;한학
    • 한국지반환경공학회 논문집
    • /
    • 제22권7호
    • /
    • pp.13-20
    • /
    • 2021
  • 2015년 4월 개통한 호남고속철도 근처 노반의 침하 문제가 지속적으로 제기되고 있으며 이에 따라 호남고속철도 인근지역의 지반 안정성 또한 문제가 있을 수 있다. 위험지도를 제작하는데 있어서 지표 및 지표를 결정하는 인자를 선정하는 것은 매우 중요하다. 기존의 위험지표는 관측된 기간 중 가장 마지막 관측날을 기준으로한 최종 변위량으로 산정하는데 침하 원인과 지표의 거동을 분석하기 위해서는 시계열적인 지표변위를 확인해야한다. 또한 광범위한 지역의 경우 직접 수준측량을 실시하기에 경제적으로 비효율적이므로 SAR 영상을 이용해 지표변위를 관측하고자 하였다. 본 논문에서는 PS-InSAR기법을 이용해 시계열 지표변위를 관측하였으며 위험지표를 결정하기 위한 인자로 최종지표변위량, 누적지표변위량, 최소변위량과 최대변위량의 차를 이용해 각 인자로 위험도를 등급화하여 비교하였다. 그 결과 최종변위량의 위험도 등급과 각 인자 간 위험도 등급이 상이하였으며 위험지표를 결정하는데 있어 다양한 관점의 인자를 추가하는 것을 제안하였다. 이는 지반침하의 원인을 찾고 해결방안을 모색하는데 있어 중요한 연구가 될 것으로 기대한다.

Numerical study on stability and deformation of retaining wall according to groundwater drawdown

  • Hyunsung Lim;Jongjeon Park;Jaehong Kim;Junyoung Ko
    • Geomechanics and Engineering
    • /
    • 제33권2호
    • /
    • pp.195-202
    • /
    • 2023
  • In this study, the ground settlement in backside of retaining wall and the behavior of the retaining wall were analyzed according to the method of groundwater drawdown due to excavation by using two-dimensional(2D) finite element analysis. Numerical analysis was performed by applying 1) fixed groundwater level, 2) constant groundwater drawdown, and 3) transient groundwater drawdown. In addition, the behavior of the retaining wall according to the initial groundwater level, ground conditions, and surcharge pressure in backside of retaining wall was evaluated. Based on the numerical analysis results, it was confirmed that when the groundwater level is at 0.1H from the ground surface (H: Excavation soil height), the wall displacement and ground settlement are not affected by the method of groundwater drawdown, regardless of soil conditions (dense or loose) and surcharge pressure. On the other hand, when the groundwater level is at 0.5H from the ground surface, the method of groundwater drawdown was found to have a significant effect on wall displacement and ground settlement. In this case, the difference in ground settlement presents by up to 4 times depending on the method of groundwater drawdown, and the surcharge load could increase the ground settlement by up to 1.5 times.

연약지반상 고성토 교대구간의 지반거동 특성 (Characteristics of Ground Movement in High Filling Abutment on Soft Ground)

  • 허열;송석철;안광국;오승탁;서상구
    • 한국지반환경공학회 논문집
    • /
    • 제9권7호
    • /
    • pp.13-23
    • /
    • 2008
  • 본 연구에서는 모래다짐말뚝으로 개량된 점성토 지반에 고성토시 발생될 수 있는 측방유동과 교대의 안정성을 파악하기 위하여 원심모형실험과 수치해석을 수행하였다. 원심모형실험과 수치해석은 교대 배면구간을 EPS로 성토한 경우(Case 1)와 토사로 성토한 경우(Case 2)에 대하여 수행하였으며, 모형실험시 교대와 성토체에 potentiometer를 설치하여 교대상부의 수직변위와 수평변위 및 성토체의 수직변위를 측정하였다. 원심모형실험결과 Case 1에서 교대의 수평변위는 1.4cm 정도로 해석결과와 거의 일치하며, 허용기준을 만족하는 것으로 나타났다. 반면, Case 2에서 교대의 수평변위는 12cm 정도로 해석결과에 비해 18% 정도 크게 평가되었으며, 허용기준을 초과하는 것으로 나타났다. 해석결과 Case 1에서 말뚝의 최대수평변위는 1.26cm로 허용 수평변위 기준(1.5cm)을 만족하는 것으로 나타난 반면, Case 2에서 말뚝의 최대 수평변위는 1.005m로 허용기준을 크게 초과하는 것으로 나타났다.

  • PDF

상시 계측시스템을 이용한 붕괴 절토사면 거동 특성 분석 및 안정성 해석 (The Stability and Characteristic Analysis of Cut Slope Behavior using Real-time Monitoring System)

  • 백용;구호본;장기태;유병선;배규진
    • 지질공학
    • /
    • 제14권1호
    • /
    • pp.71-80
    • /
    • 2004
  • 토사면의 붕괴는 매년 해빙기와 여름철 집중호우기에 자주 발생한다. 본 연구는 지반의 거동에 대한 원인을 분석하고 향후 사면 붕괴의 거동을 예측하기 위하여 상시 계측시스템을 도입한 현장에서 수집된 자료를 해석한 것이다. 연구방법으로 현장조사와 계측결과를 종합적으로 검토하여 붕괴 규모 및 붕괴 메카니즘을 분석하였다. 또한, 현장에 설치된 상시 계측시스템 전송 자료 분석과 수반하여 안정성 해석을 수행하였다. 본 절토사면은 총 17개의 신축계 센서를 설치하여 계측을 실시하였으며, 그 결과, 총 3회의 지반 변위가 발생하였고 부분적으로 다수의 인장균열이 발생하였다. 사암과 세일로 구성된 본 절토사면에서 집중호우와 하부 지지력 상실에 기인하여 초기 거동이 시작되었다. 지반거동 특성의 정량적 분석을 위하여 총 5개의 측선을 구성하여 계측을 실시하였다. 계측결과를 종합하여 보면 대책공법이 기 시공된 구간에서는 매우 미미한 변이가 발생되었으나, 대책방안이 마련되지 않은 구간에서는 최대 400mm이상의 변위가 진행되고 있다. 변위 자료와 강우자료의 분석결과 지반의 거동과 강우와는 밀접한 관계가 있는 것으로 판단되었다. 지반의 포화도를 변화하면서 안정성 해석을 실시한 결과, 지반 포화도가 55%이상 일때부터 안전율이 1.0이하로 나타나는 것을 알 수 있다. 현재의 지반거동 추이는 오차 범위내에 속하는 안정한 단계로 판단되어지나, 향후 동절기의 외부온도 변화와 동반하여 지반의 변동이 우려되므로 인하여 지속적인 관찰과 자료 분석이 수행되어야 할 것으로 판단된다.

공간적으로 변이하는 지진파에 대한 터널의 응답 예측 (Prediction of Tunnel Response by Spatially Variable Ground Motion)

  • 김인태;한정우;윤세웅;박두희
    • 한국지반환경공학회 논문집
    • /
    • 제9권4호
    • /
    • pp.53-61
    • /
    • 2008
  • 지진파는 진원지로부터 지표면으로 전파되는 과정에서 전파경로와 부지증폭정도의 차이, 그리고 비균질한 지반에서의 지진파 산란 등으로 인하여 공간적으로 변이하게 된다. 공간적으로 변이하는 지진파는 교량과 터널과 같이 종단방향 길이가 긴 구조물에 큰 영향을 미칠 수 있다. 지진파의 공간적 변이성이 교량에 미치는 영향에 대해서는 잘 알려져 있지만 터널에 미치는 영향에 대해서는 체계적인 연구가 수행된 바 없다. 본 연구에서는 공간적으로 변이하는 지진파에 대한 터널의 응답을 예측하기 위한 새로운 기법을 개발하였다. 개발된 기법의 핵심은 이격거리별 계산된 공간적으로 변이하는 지진파의 시간이력으로부터 생성되는 종단방향 변위 주상도이다. 종단방향 변위 주상도는 일련의 3차원 유사정적 유한요소해석을 수행하는데 사용되었다. 해석결과, 공간적으로 변이하는 지진파는 터널에 종단방향 휨을 유발하며 터널 라이닝에 큰 축력이 발생할 수 있는 것으로 나타났다. 이는 특히 지반의 특성이 변이하는 경계면에서 영향이 큰 것으로 나타났다.

  • PDF

A NEW FEEDBACK TECHNIQUE FOR TUNNEL SAFETY BY USING MEASURED DISPLACEMENTS DURING TUNNEL EXCAVATION

  • Sihyun PARK;Yongsuk SHIN;Sungkun PARK
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.432-439
    • /
    • 2009
  • This research project was carried out to develop the technique to assess quantitatively and rapidly the stability of a tunnel by using the measured displacement at the tunnel construction site under excavation. To achieve this purpose, a critical strain concept was introduced and applied to an assessment of a tunnel under construction. The new technique calculates numerically the strains of the surrounding ground by using the measured displacements during excavation. A numerical practical system was developed based on the proposed analysis technique in this study. The feasibility of the developed analysis module was verified by incorporating the analysis results obtained by commercial programs into the developed analysis module. To verify the feasibility of the developed analysis module, analysis results of models both elastic and elasto-plastic grounds were investigated for the circular tunnel design. Then the measured displacements obtained in the field are utilized practically to assess the safety of tunnels using critical strain concept. It was verified that stress conditions of in-situ ground and ground material properties were accurately assessed by inputting the calculated displacement obtained by commercial program into this module for the elastic ground. However for the elasto-plastic ground, analysis module can reproduce the initial conditions more closely for the soft rock ground than for the weathered soil ground. The stability of tunnels evaluated with two types of strains, that is, the strains obtained by dividing the crown displacement into a tunnel size and the strains obtained by using the analysis module. From this study, it is confirmed that the critical strain concept can be fully adopted within the engineering judgment in practical tunnel problems and the developed module can be used as a reasonable tool for the assessment of the tunnel stability in the field.

  • PDF

수치해석을 이용한 우물통 기초의 관성력과 동적토압의 위상관계 분석 (Analysis on Phase Relation between Inertia Force and Dynamic Earth Pressure of Caisson by Numerical Analysis)

  • 김성렬;장학성
    • 한국지진공학회논문집
    • /
    • 제12권2호
    • /
    • pp.23-31
    • /
    • 2008
  • 지진시 구조물에 작용하는 동적토압은 구조물 관성력과 동적토압의 위상관계에 따라 구조물의 변위에 대한 하중 또는 저항력으로 발휘될 수 있다. 본 연구에서는 위상관계를 고려한 동적토압 산정 절차를 제안하고, 이 절차에 따라 교량 우물통 기초에 대한 수치해석을 수행하여 구조물 관성력과 동적토압의 위상관계를 분석하였다. 그 결과, 지반강성이 작아서 지반의 변위진폭이 구조물의 변위 진폭보다 큰 경우에는 동적토압이 구조물의 변위를 증가시키는 하중으로 발휘되며, 지반강성이 커서 지반의 변위진폭이 구조물의 변위진폭보다 작은 경우에는 동적토압이 구조물의 변위를 감소시키는 저항력으로 발휘되는 것으로 나타났다.

Protocol for testing of cold-formed steel wall in regions of low-moderate seismicity

  • Shahi, Rojit;Lam, Nelson;Gad, Emad;Wilson, John
    • Earthquakes and Structures
    • /
    • 제4권6호
    • /
    • pp.629-647
    • /
    • 2013
  • Loading protocols have been developed for quasi-static cyclic testing of structures and components. However, it is uncertain if protocols developed for conditions of intense ground shaking in regions of high seismicity would also be applicable to regions of low-moderate seismicity that are remote from the tectonic plate boundaries. This study presents a methodology for developing a quasi-static cyclic displacement loading protocol for experimental bracing evaluation of cold-formed steel stud shear walls. Simulations presented in the paper were based on conditions of moderate ground shaking (in Australia). The methodologies presented are generic in nature and can be applied to other regions of similar seismicity conditions (which include many parts of China, Korea, India and Malaysia). Numerous response time histories including both linear and nonlinear analyses have been generated for selected earthquake scenarios and site classes. Rain-flow cycle counting method has been used for determining the number of cycles at various ranges of normalized displacement amplitude. It is found that the number of displacement cycles of the loading protocol increases with increasing intensity of ground shaking (associated with a longer return period).

Monitoring Time-Series Subsidence Observation in Incheon Using X-Band COSMO-SkyMed Synthetic Aperture Radar

  • Sang-Hoon Hong
    • 대한원격탐사학회지
    • /
    • 제40권2호
    • /
    • pp.141-150
    • /
    • 2024
  • Ground subsidence in urban areas is mainly caused by anthropogenic factors such as excessive groundwater extraction and underground infrastructure development in the subsurface composed of soft materials. Global Navigation Satellite System data with high temporal resolution have been widely used to measure surface displacements accurately. However, these point-based terrestrial measurements with the low spatial resolution are somewhat limited in observing two-dimensional continuous surface displacements over large areas. The synthetic aperture radar interferometry (InSAR) technique can construct relatively high spatial resolution surface displacement information with accuracy ranging from millimeters to centimeters. Although constellation operations of SAR satellites have improved the revisit cycle, the temporal resolution of space-based observations is still low compared to in-situ observations. In this study, we evaluate the extraction of a time-series of surface displacement in Incheon Metropolitan City, South Korea, using the small baseline subset technique implemented using the commercial software, Gamma. For this purpose, 24 COSMO-SkyMed X-band SAR observations were collected from July 12, 2011, to August 27, 2012. The time-series surface displacement results were improved by reducing random phase noise, correcting residual phase due to satellite orbit errors, and mitigating nonlinear atmospheric phase artifacts. The perpendicular baseline of the collected COSMO-SkyMed SAR images was set to approximately 2-300 m. The surface displacement related to the ground subsidence was detected approximately 1 cm annually around a few Incheon Subway Line 2 route stations. The sufficient coherence indicates that the satellite orbit has been precisely managed for the interferometric processing.