• Title/Summary/Keyword: geotechnical design

Search Result 1,815, Processing Time 0.028 seconds

Estimation of Dynamic Characteristics of Core Zone of Rockfill Dam by Multi-channel Analysis of Surface Waves (MASW 조사를 통한 사력댐 코어존 동적물성의 평가)

  • Lee, Jong-Wook;Ha, Ik-Soo;Oh, Byung-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.860-868
    • /
    • 2008
  • Seismic safety analysis of rockfill dams are consist of the stability analysis as an simplifed method and the dynamic analysis as an detailed method. When high risk dams such as Multi-purpose dams were often applied detailed method by dynamic analysis, dynamic properties of dam materials such as shear modulus are considered as most important factor. Dynamic material properties such as shear modulus had to be investigated by cyclic triaxial test et al. during design and construction stage but these were not conducted because of the condition of domestic seismic design technique. MASW and SASW methods had been applied as a non destructive method to investigate dynamic material properties of existing rockfill dam, has no problems in dam safety at present. These methods were usually performed under the assumptions that the subsurface can be described horizontally homogeneous and isotropic layers. Recent studies(Marwin, 1993, Kim, 2001) showed that surface waves generated through inclined structures have different characteristics from those through a horizontally homogeneous layered model. further Kim et al(2005) and Min and Kim(2006) showed that central core type rockfill dam overestimated the shear wave velocities as increasing the depth through the 3D numerical modelling dut to the effect of outer rockfill and geometrical reasons In this study the results of shear wave velocities of seven rockfill dams form comprehensive facility review, was carried out from 2003 to 2007, were collected and analysed to establish the shear wave velocity distribution characteristics in increasing confining stress in rockfill dams and surface wave velocity ranges in rockfill dam through MASW and the limitation in application are discussed to be utilized as an reference value for dynamic analysis.

  • PDF

Slope stability method establish and carry out in vertical slope for tunnel excavation (터널의 굴착을 위한 수직사면의 안정대책 방안 수립 및 시행)

  • Park, Chal-Sook;Kim, Jun-Yong;Kwan, Han;Kim, Min-Jo;Choi, Yu-Kyung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.992-1006
    • /
    • 2008
  • The tunnel type spillways is under construction to increasing water reservoir capacity in Dae-am dam. Cutting-slope adjacent to outlet of spillways had been originally designed to be 63 degrees and about 65m in height. Examination is carried out in preceding construction that it is caused to some problems possibility which of machine for slope cutting couldn't approach to the site, blasting for cutting slope might have negative influence on highway and roads nearby, and fine view along the Tae-hwa river would be eliminated. In order to establish stability of tunnel and more friendly natural environment that we are carry out detailed geological surface survey and analysis of slope stability. So, we are design and construct for tunnel excavation with possible method that it is keep up natural slope. The result of survey and analysis that natural slope was divided 3 zone(A, B, C zone). In A and B zone, in first removed floating rock, high tensile tension net is install that it prevent of release and falling of rock, in order to security during under working. In addition to, pre-stressed rock anchor is install purpose of security during tunnel excavation because of fault zone near vertical developed above excavation level. Zone C is relatively good condition of ground, design is only carry out random rock bolt. All zone are designed and constructed drainage hole for groundwater and surface water is easily drain. Desinged slpoe is harmony with near natural environment. Successfully, construction is completed.

  • PDF

A Case Study on the High-quality DCM applied to the Foundation of Breakwater (방파제 기초에 적용된 고품질 DCM공법의 설계 및 시공 사례)

  • Kang, Yeoun-Ike;Shim, Min-Bo;Shim, Sung-Hyun;Kim, Ha-Young;Shim, Jae-Bum;Chun, Youn-Chul;Yoon, Jung-Ik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.815-826
    • /
    • 2009
  • The paper presents a case study addressing the design and construction aspects for DCM(Deep Cement Mixing) method employed as the foundation of a caisson type breakwater with heavy weight(10,700 ton/EA) and a high design wave height($H_{1/3}$=8.7m). The DCM was designed for the project(Ulsan New Port North Breakwater Phase 1) by optimizing the pattern of DCM columns with a combination of short and long columns (i.e., block type(upper 3m)+wall type(lower)) and considering overlapped section between columns as a critical section against shear force where the coefficient of effective width of treated column($\alpha$) was estimated with caution. It was shown that the value can be 0.9 under the condition with the overlapped width of 30cm. In addition to that, a field trial test was performed after improving conventional DCM equipment (e.g., mixing blades, cement paste supplying pipes, multi auger motor, etc.) to establish a standardized DCM construction cycle (withdrawal rate of mixing blades) which can provide the prescribed strength. The result of the field strength test for cored DCM specimens shows that the averaged strength is larger than the target strength and the distribution of the strength(with a defect rate of 7%) also satisfies with the quality control normal distribution curve which allows defect rate of 15.9%.

  • PDF

Design of Large-scale Drilled Shaft (대구경 현장타설말뚝의 설계 사례)

  • Im, Chul-O;Choi, Young-Seok;Kwak, Ki-Seok;Jang, Hak-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.545-553
    • /
    • 2009
  • A lot of long-span marine bridge, which connects land to island or island to island, are being designed and constructed lately in south-west coast in South Korea. In the past, caisson foundations in marine were mainly adopted in construction and stability aspect, however, nowadays with development of pile construction technology, drilled shaft foundations are mainly adopted. As the long span cable stayed bridge and suspension bridge applied with lots of loads are being designed, the scale of pile foundations are getting larger. As the construction cost of substructure including foundation in marine bridges is too high, the appropriate evaluation of the axial bearing capacity of pile becomes a core factor to decide the construction cost of foundation if the drilled shaft is adopted as foundation type of bridge. The evaluation values of skin friction and end bearing capacity of drilled shaft in weathered rock suggested in south Korea are only to introduce the foreign specifications, and most of them are designed in a kind of hard soil layer. Also the allowable load of pile section is less than the expected bearing capacity of pile in the soil condition since the allowable capacity of pile is undervalued. Recently in order to improve this factor the bi-axial hydraulic load test of pile was taken, the data of load transfer analysis of pile, unit of skin friction and end bearing capacity are accumulated. In our country, the design of piles are made with ASD, however, LRFD considering service, strength and extreme state was adopted in Incheon Grand Bridge implemented with BTL, and the research to systematize the resistance coefficient appropriate at home country are being progressed.

  • PDF

Reliability Evaluation of Extrapolated Failure Load of Drilled Shafts Embedded in Weathered Rock (풍화암에 근입된 현장타설말뚝의 외삽 파괴하중 신뢰성 분석)

  • Jung, Sung-Jun;Lee, Sang-Inn;Jeon, Jong-Woo;Kim, Myoung-Mo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.993-1000
    • /
    • 2009
  • In general, a drilled shaft embedded in weathered rock has a large load bearing capacity. Therefore, most of the load tests are performed only up to the load level that confirms the pile design load capacity, and stopped much before the failure load of the pile is attained. If a reliable failure load value can be extracted from the premature load test data, it will be possible to greatly improve economic efficiency as well as pile design quality. The main purpose of this study is to propose a standard for judging the reliability of the failure load of piles that is obtained from extrapolated load test data. To this aim, eleven static load test data of load-displacement curves were obtained from testing of piles to their failures from 3 different field sites. For each load-displacement curve, loading was assumed as 25%, 50%, 60%, 70%, 80%, and 90% of the actual pile bearing capacity. The limited known data were then extrapolated using the hyperbolic function, and the failure load was re-determined for each extrapolated data by the ASCE 20-96 method (1997). Statistical analysis was performed on the reliability of the re-evaluated failure loads. The results showed that if the ratio of the maximum-available displacement to the failure-load displacement exceeds 0.6, the extrapolated failure load may be regarded as reliable, having less than a conservative 20% error on average. The applicability of the proposed standard of judgment was also verified with static load test data of driven piles.

  • PDF

A Study on the Behavior of Cut and Cover Tunnel according to the Excavation Plane by Numerical Analysis (굴착사면 변화에 따른 복개 터널구조물의 역학적 거동에 관한 수치해석적 연구)

  • Bae, Gyu-Jin;Lee, Seok-Won;Lee, Gyu-Phil;Park, Si-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.4 no.1
    • /
    • pp.79-90
    • /
    • 2002
  • The structural analysis such as rigid frame analysis has been used for the design of cut and cover tunnel due to its simplicity and convenience. This analysis, however, could not account for the geometrical factors such as interface elements, slope of excavation plane, distance between lining and excavation plane, etc. To develop the analysis technique and design technology for the cut and cover tunnel, in this study, the numerical analyses considering not only geometrical but geotechnical factors are conducted. Especially, the effects on the mechanical behaviors of cut and cover tunnel due to the slope of excavation plane and the distance between lining and excavation plane are mainly focused in this study.

  • PDF

FracSys와 UDEC을 이용한 사면 파괴 양상 분석 통계적 절리망 생성 기법 및 Monte Carlo Simulation을 통한 사면 안정성 해석

  • 김태희;최재원;윤운상;김춘식
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.651-656
    • /
    • 2002
  • In general, the most important problem in slope stability analysis is that there is no definite way to describe the natural three-dimensional Joint network. Therefore, the many approaches were tried to anlayze the slope stability. Numerical modeling approach is one of the branch to resolve the complexity of natural system. UDEC, FLAC, and SWEDGE are widely used commercial code for the purpose on stability analysis. For the purpose on the more appropriate application of these kind of code, however, three-dimensional distribution of joint network must be identified in more explicit way. Remaining problem is to definitely describe the three dimensional network of joint and bedding, but it is almost impossible in practical sense. Three dimensional joint generation method with random number generation and the results of generation to UDEC have been applied to settle the refered problems in field site. However, this approach also has a important problem, and it is that joint network is generated only once. This problem lead to the limitation on the application to field case, in practical sense. To get rid of this limitation, Monte Carlo Simulation is proposed in this study 1) statistical analysis of input values and definition of the applied system with statistical parameter, 2) instead of the consideration of generated network as a real system, generated system is just taken as one reliable system, 3) present the design parameters, through the statistical analysis of ouput values Results of this study are not only the probability of failure, but also area of failure block, shear strength, normal strength and failure pattern, and all of these results are described in statistical parameters. The results of this study, shear strength, failure area, pattern etc, can provide the direct basement on the design, cutoff angle, support pattern, support strength and etc.

  • PDF

Site Application of Artificial Neural Network for Tunnel Construction (인공신경망을 이용한 터널시공에서 현장 적용성)

  • Song, Joohyeon;Chae, Hwiyoung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.8
    • /
    • pp.25-33
    • /
    • 2012
  • Although it is important to reflect the accurate information of the ground condition in the tunnel design, the analysis and design are conducted by limited information because it is very difficult to consider various geographies and geotechnical conditions. When the tunnel is under construction, examination of accurate safety and prediction of behavior are overcome the limits of predicting behavior by Artificial Neural Network in this study. First, construct the suitable structure after the data of field was made sure by the multi-layer back propagation, then apply with algorithm. Employ the result of measured data from database, and consider the influence factor of tunnel, like supporting pattern, RMR, Q, the types of rock, excavation length, excavation shape, excavation over, to carry out the reliable analysis through field applicability of Artificial Neural Network. After studying, using the ANN model to predict the shearing displacement, convergence displacement, underground displacement, Rock bolt output follow the excavation over of tunnel construction field, then determine the field applicability with ANN through field measured value and comparison analysis when tunnel is being constructed.

Liquefaction Assessment Variations with Regard to the Cyclic Resistance Ratio Estimation Methods (전단저항강도비 산정 방법에 따른 액상화 평가의 변화)

  • Song, Sungwan;Kim, Hansaem;Cho, Wanjei
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.1
    • /
    • pp.13-19
    • /
    • 2020
  • Recently, as the number of earthquakes increases in the Korean Peninsula and surrounding area, the importance of earthquake countermeasures and seismic design has been increasing. As a result, interest and concerns about liquefaction, which is one of the problems that concern the earthquake, are increasing. There are various methods that can assess the possibility of liquefaction by using geotechnical information for specific ground. However, direct comparisons of each method are not yet available. In this study, the two methods using the SPT-N value and the shear wave velocity among the methods for estimating the Cyclic Resistance Ratio (CRR) value required for the simplified liquefaction assessment method were compared. And the correction of the ground information required to use the two methods respectively was compared. As a result, more accurate evaluation results were obtained when the CRR value is calculated using the SPT-N values.

A Study on the Evaluation of Dynamic Behavior and Liquefaction Cau8ed by Earthquake of Sea Dike Structures on the Ground (방조제 축조 예정지반의 지진에 의한 액상화 거동 평가)

  • 도덕현;장병욱;고재만
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.35 no.2
    • /
    • pp.43-56
    • /
    • 1993
  • The laboratory tests are performed on how the liquefaction potential of the sea dike structures on the saturated sand or silty sand seabed could be affected due to earthquake before and after construction results are given as follows ; 1. Earthquake damages to sea dike structures consist of lateral deformation, settlement, minor abnormality of the structures and differential settlement of embankments, etc. It is known that severe disasters due to this type of damages are not much documented. Because of its high relative cost of the preventive measures against this type of damages, the designing engineer has much freedom for the play of judgement and ingenuity in the selection of the construction methods, that is, by comparing the cost of the preventive design cost at a design stage to reconstruction cost after minor failure. 2. The factors controlling the liquefaction potential of the hydraulic fill structure are magnitude of earthquake(max. surface velocity), N-value(relative density), gradation, consistency(plastic limit), classification of soil(G & vs), ground water level, compaction method, volumetric shear stress and strain, effective confining stress, and primary consolidation. 3. The probability of liquefaction can be evaluated by the simple method based on SPT and CPT test results or the precise method based on laboratory test results. For sandy or silty sand seabed of the concerned area of this study, it is said that evaluation of liquefaction potential can be done by the one-dimensional analysis using some geotechnical parameters of soil such as Ip, Υt' gradation, N-value, OCR and classification of soils. 4. Based on above mentioned analysis, safety factor of liquefaction potential on the sea bed at the given site is Fs =0.84 when M = 5.23 or amax= 0.12g. With sea dike structures H = 42.5m and 35.5m on the same site Fs= 3.M~2.08 and Fs = 1.74~1.31 are obtained, respectively. local liquefaction can be expected at the toe of the sea dike constructed with hydraulic fill because of lack of constrained effective stress of the area.

  • PDF