• Title/Summary/Keyword: geosynthetic layer

Search Result 31, Processing Time 0.022 seconds

Surface displacements due to tunneling in granular soils in presence and absence of geosynthetic layer under footings

  • Rebello, Nalini E.;Shivashankar, R.;Sastry, Vedala R.
    • Geomechanics and Engineering
    • /
    • v.15 no.2
    • /
    • pp.739-744
    • /
    • 2018
  • This paper presents the results of numerical modeling studies on the effect of displacements of tunneling in granular soils. Presence of building loads is considered, to find displacement generated at the surface on tunnel. Effect of varying eccentricities of building is simulated, to find influence of building on vertical and horizontal displacement. Studies were carried out in two cases of with and without a geosynthetic layer installed at the bottom of the footing. Results of analysis revealed, the presence of geosynthetic layer under footing, with building placed on centre line, reduced the surface displacements compared to displacement generated without geosynthetic layer. Presence of geosynthetic layer under footing had a dominant effect in reducing displacements in high storey structures. However, when the building was shifted to greater eccentricities from centre line, presence of geosynthetic layer, led to insignificant reduction of displacements on the centre line at the surface.

Influence of inclusion of geosynthetic layer on response of combined footings on stone column reinforced earth beds

  • Maheshwari, Priti;Khatri, Shubha
    • Geomechanics and Engineering
    • /
    • v.4 no.4
    • /
    • pp.263-279
    • /
    • 2012
  • The present paper deals with the analysis of combined footings resting on geosynthetic reinforced granular fill overlying stone column improved poor soil. An attempt has been made to study the influence of inclusion of geosynthetic layer on the deflection of the footing. The footing has been idealized as a beam having finite flexural rigidity. Granular fill layer has been represented by Pasternak shear layer and stone columns and poor soil have been represented by nonlinear Winkler springs. Nonlinear behavior of granular fill layer, stone columns and the poor soil has been considered by means of hyperbolic stress strain relationships. Governing differential equations for the soil-foundation system have been derived and solution has been obtained employing finite difference scheme by means of iterative Gauss Elimination method. Results of a detailed parametric study have been presented, for a footing supporting typically five columns, in non-dimensional form in respect of deflection with and without geosynthetic inclusion. Geosynthetic layer has been found to significantly reduce the deflection of the footing which has been quantified by means of parametric study.

The Evaluation of Geosynthetic Clay Liner as a barrier layer for the Final Cover System in landfill (폐기물 매립지 최종복토 차단층으로서 Geosynthetic Clay Liner 적용성 평가)

  • Lee, Jung-Lan;Moon, Chul-Hwan;Jung, Chan-Kee;Lee, Jai-Young
    • Journal of the Korean Geosynthetics Society
    • /
    • v.3 no.2
    • /
    • pp.23-29
    • /
    • 2004
  • One of the most important concern in the design of barrier layer in to protect the water through the landfill. The barrier layer consists of a single compacted clay liner(CCL) or a composite liner with high density polyethylene(HDPE). The construction of barrier layer at the edge of cover system usually has some problems because of steep slope in the landfill. In this study the authors evaluate the geosynthetic clay liner(GCL) as a barrier layer at the edge of the final cover system in landfill. The GCLs were simulated the stability of slope, the HELP(Hydrologic Evaluation of Landfill Performance) and the durability of environmental situation. As the results, the GCL has more stable than the CCL. Therefore, the authors suggest that the GCL in good for the barrier layer of the final cover system in the landfill.

  • PDF

Evaluations of a Seismic Performance of Geosynthetic-Reinforced Embankment Supporting Piles for a Ultra Soft Ground (침하 억제를 위하여 초연약지반에 설치된 섬유보강 성토지지말뚝의 내진성능 평가)

  • Lee, Il-Wha;Kang, Tae-Ho;Lee, Su-Hyung;Lee, Sung-Jin;Bang, Eui-Seok
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.918-927
    • /
    • 2008
  • The problems associated with constructing high-speed concrete track embankments over soft compressible soil has lead to the development and/or extensive use of many of the ground improvement techniques used today. Drains, surcharge loading, and geosynthetic reinforcement, have all been used to solve the settlement and embankment stability issues associated with construction on soft soils. Geosynthetic-reinforced embankment supporting piles method consist of vertical columns that are designed to transfer the load of the embankment through the soft compressible soil layer to a firm foundation and one or more layers of geosynthetic reinforcement placed between the top of the columns and the bottom of the embankment. In the paper, the evaluations of a seismic performance of geosynthetic-reinforced embankment piles for a ultra soft ground during earthquake were studied. the equivalent linear analysis was performed by SHAKE for soft ground. A seismic performance analysis of Piles was performed by GROUP PILE and PLAXIS for geosynthetic-reinforced embankment piles. Guidelines is required for pile displacement during earthquake. Conclusions of the studies come up with a idea for soil stiffness, conditions of pile cap, pile length and span.

  • PDF

Effect of the Settlement Reduction to each Geosynthetic Reinforced Pile Supported Embankments Design Condition (토목섬유보강 성토지지말뚝의 설계조건별 침하억제 효과)

  • Lee, Il-Wha;Lee, Sung-Jin;Lee, Su-Hyung;Moon, In-Ho
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1519-1524
    • /
    • 2009
  • Construction of high-speed concrete track embankments over soft ground needs many of the ground improvement techniques. Drains, surcharge loading, and geosynthetic reinforcement, have all been used to solve the settlement and embankment stability issues associated with construction on soft soils. However, when time constraints are critical to the success of the project, another measures should be considered. Especially, since the design criteria of residual settlement is limited as 30mm for concrete track embankment, it is very difficult to satisfy this allowable settlement by using the former construction method. Pile net method consist of vertical columns that are designed to transfer the load of the embankment through the soft compressible soil layer to a firm foundation and one or more layers of geosynthetic reinforcement placed between the top of the columns and the bottom of the embankment. In this paper, three cases with different embankment height and number of geosynthetic reinforcement, were studied through FEM analysis for efficient use of pile net method.

  • PDF

A review on uplift response of symmetrical anchor plates embedded in reinforced sand

  • Niroumand, Hamed;Kassim, Khairul Anuar
    • Geomechanics and Engineering
    • /
    • v.5 no.3
    • /
    • pp.187-194
    • /
    • 2013
  • The most soil anchor works have been concerned with the uplift problem on embedded in non-reinforced soils under pullout test. Symmetrical anchor plates are a foundation system that can be resisting tensile load with the support of around soil in which symmetrical anchor plate is embedded. Engineers and authors proved that the uplift response can be improved by grouping the symmetrical anchor plates, increasing the unit weight, embedment ratio and the size of symmetrical anchor plates. Innovation of geosynthetics in the field of geotechnical engineering as reinforcement materials found to be possible solution in symmetrical anchor plate responses. Unfortunately the importance of reinforcement in submergence has received very little attention by researchers. In this paper, provision of tensile reinforcement under embedded conditions has been studied through uplift experiments on symmetrical anchor plates by few researchers. From the test results it has been showed that the provision of geogrid reinforcement system enhances the uplift response substantially under uplift test although other results are such as increase the ultimate uplift response of symmetrical anchor plate embedded using geosynthetic and Grid Fixed Reinforced (GFR) and symmetrical anchor plate improvement is very dependent on geosynthetic layer length and increases significantly until the amount of beyond that further increase in the layer length does not show a significant contribution in the anchor response.

Sand-Nonwoven geotextile interfaces shear strength by direct shear and simple shear tests

  • Vieira, Castorina Silva;Lopes, Maria de Lurdes;Caldeira, Laura
    • Geomechanics and Engineering
    • /
    • v.9 no.5
    • /
    • pp.601-618
    • /
    • 2015
  • Soil-reinforcement interaction mechanism is an important issue in the design of geosynthetic reinforced soil structures. This mechanism depends on the soil properties, reinforcement characteristics and interaction between these two elements (soil and reinforcement). In this work the shear strength of sand/geotextile interfaces were characterized through direct and simple shear tests. The direct shear tests were performed on a conventional direct shear device and on a large scale direct shear apparatus. Unreinforced sand and one layer reinforced sand specimens were characterized trough simple shear tests. The interfaces shear strength achieved with the large scale direct shear device were slightly larger than those obtained with the conventional direct shear apparatus. Notwithstanding the differences between the shear strength characterization through simple shear and direct shear tests, it was concluded that the shear strength of one layer reinforced sand is similar to the sand/geotextile interface direct shear strength.

Analysis of Cyclic Loading Transferred Mechanism on Geosynthetic-Reinforced and Pile-Supported Embankment (토목섬유로 보강된 성토지지말뚝 시스템의 반복하중 전이 메커니즘 분석)

  • Lee, Sung-Jee;Yoo, Min-Taek;Lee, Su-Hyung;Baek, Min-Cheol;Lee, Il-Wha
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.12
    • /
    • pp.79-91
    • /
    • 2016
  • Geosynthetic-reinforced and Pile-supported (GRPS) embankment method is widely used to construct structures on soft ground due to restraining residual settlement and their rapid construction. However, effect of cyclic loading has not been established although some countries suggest design methods through many studies. In this paper, cyclic loading tests were conducted to analyze dynamic load transfer characteristics of pile-supported embankment reinforced with geosynthetics. A series of 3 case full scale model tests which were non-reinforced, one-layer-reinforced, two-layer reinforced with geosynthetics were performed on piled embankments. In these series of tests, the height of embankment and pile spacing were selected according to EBGEO (2010) standard in Germany. As a result of the vertical load parts on the pile and on the geosynthetic reinforcement measured separately, cyclic loads transferred by only arching effect decreased with strength geosynthetic-reinforced case. However, final loads on the pile showed no differences among the cases. These results conflict with previous studies that reinforcement with geosynthetics increases transfer load concentrated on piles. In addition, it is observed that the load transferred to pile decreases at the beginning of cycle number due to reduction of arching effected by cyclic loading. Based on these results, transferred mechanism for cyclic load on GRPS system has been presented.

Viscoelastic Behaviors of Geosynthetic-Reinforced Asphalt Pavements (섬유보강 아스팔트 포장의 점탄성 거동연구)

  • In, Sik-Youn;Kim, Hyung-Bae;Ann, Sung-Sun;Suh, Young-Chan
    • International Journal of Highway Engineering
    • /
    • v.6 no.2 s.20
    • /
    • pp.37-45
    • /
    • 2004
  • The asphalt concrete pavement takes various advantages of better riding quality, serviceability and easier maintenance. At the same time, it addresses a weak point of the premature failures due to rapid increasement of traffic volume, heavy vehicles and high temperature in summer. It increases the expenditure of maintenance and repair. In order to improve the performance of asphalt pavement avoiding this premature failure, the use reinforcements with geosynthetics have been considered. Geosynthetics are known as an effective reinforcement to restrain fatigue and reflective cracks in asphalt pavements. In this study, a comprehensive parametric study is conducted to capture the efficiency of geosynthetic-reinforcements using viscoelastic properties of the asphalt concrete(AC) layer. The investigated parameters were reinforcement location, AC layer thickness, temperature distribution across the AC layer and modulus of AC and base layer. As a result of observations, that reinforced asphalt concrete could be used effectively for improving resistance against fatigue cracks and permanent deformation. Especially, when a geogrid was placed at the interface between the asphaltic base and the subbase, tensile stress in the horizontal direction was significantly reduced.

  • PDF

Evaluation of Discharge Capacity for Gravel mat due to Geosynthetic Using Calibration Chamber Test (모형실험을 통한 토목섬유 적용에 따른 쇄석배수층 통수능 평가)

  • Kim, Jae-Hong;Im, Eun-Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.2
    • /
    • pp.11-20
    • /
    • 2014
  • To create a large-scale complex, it is often the case to perform ground improvement by using vertical drain method after the reclamation of coastal soft ground, for construction period shortening and stable site renovation. During this process, the pore water migrates to the horizontal drainage layer of the ground surface through the vertical drain installed in the soft ground and discharged out to the open. In the past sand was used as the material for the horizontal drainage layer in numerous cases, however recently, due to material shortage and high pricing, the use of crushed stones has increased. To prevent mixing of the materials between the horizontal drainage layer and the upper landfill, geosynthetics (PPMat) are installed. However, the use of geosynthetics results in high additional cost for material purchase and installation, therefore it is necessary to examine the validity of the installation itself. In this study, to verify the necessity, model tests were performed. Results from the model tests indicate that the drainage ability of the horizontal drainage layer is barely affected by the application of geosynthetics.