• Title/Summary/Keyword: gangform

Search Result 8, Processing Time 0.024 seconds

Development of Automated Gangform Climbing System for Apartment Housing (공동주택 전용 갱폼 자동 인양 시스템 개발)

  • Lee, Jeong-Ho;Kim, Soon-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.114-115
    • /
    • 2019
  • Gangform is used as exterior wall forms in the most of apartments. Existing system forms developed for high-rise building, RCS and ACS, are too heavy and over-designed to be applied to general apartments, leading to higher costs. A more simplified rail Gangform(R/GF) is also used, but it depends entirely on T/C for the lift like Gangform. The T/C's legal inactivity time for moving Gangform and materials has increased, and the higher allowances have to be paid for overtime work, thus causing to the cost increase and time delay. Therefore, this study aims to develop an automated Gangform climbing system that can be used universally and economically in apartment houses. The use of the development system is expected to improve the safety of Gangform operations and reduce the workload on T/C.

  • PDF

Quantitative Risk Assessment based on Fault Tree Analysis for Gangform Accident (갱폼 재해의 FTA를 통한 정량적 위험성 산정에 관한 연구)

  • Ham, Young Jong;Kee, Jung Hun;Park, Jong Yil
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.4
    • /
    • pp.40-47
    • /
    • 2020
  • Although gangform has good workability due to the integration of outer wall forms and working platforms, 22 workers were died from 21 gangform related accidents during 2012 to 2016. Quantitative risk assessment is required for evident based prevention measure selection. In this study, based on 52 accident data from 2004 to the first half of 2019, FTA is conducted for probabilities of direct causes and their contribution to accidents. Three stages are considered; gangform installation, dismantling and lifting, and using. The effectiveness of countermeasures is evaluated through minimum cut set, RAW and RRW. Complete assembly of gangform on the ground level, detailed planning, and fall prevention device are suggested as prevention measures for installation, dismantling and lifting, and using stages, respectively.

Development of an Automated Gangform Climbing System for Apartment Housing Construction - Structural Stability and Tower Crane Lifting Load Analysis - (공동주택 전용 갱폼 인양 자동화 기술의 개발 - 구조적 안정성 및 타워크레인 양중부하 분석 -)

  • Lee, Jeong-Ho;Yang, Sang-Hoon;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.48-59
    • /
    • 2012
  • Gangform, compared to the traditional forms, is a systemized form which can reduce construction duration and cost by the advantage of using it repeatedly. However, transportation and climbing process of the Gangform is highly dependant on the performance of tower crane. Gangform climbing process takes one day out of six to seven days of a structural work cycle. Tower cranes can not be used in other lifting works when they lift the Gangform during the structural work cycle, causing the delay in the construction project. Numerous efforts and researches have been done in domestic and international industry to solve such limitations of Gangform climbing process. Especially, "A Study on the Development of Automatic Gangform Climbing System for Apartment Housing Construction"has suggested a conceptual model which can climb the Gangform system without a tower crane. In this paper, the technical and economical feasibilities of previously proposed Automatic Gangform climbing system are examined by evaluating its structural stability and lifting load reduction effect.

Lightweight Gang Form Utilizing Engineering Composite Material (엔지니어링 복합소재를 활용한 갱폼의 경량화)

  • Lee, Changsu;Lee, Dongmin;Lee, Dongyoun;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.97-98
    • /
    • 2018
  • Despite of its advantange on shortening framework period of a super-tall building, gangform is prone to high safety risk due to its heavy weight during operation. Thus, this study is conducted to investigate the applicability of a lightweight gangform made of engineering composite materials. Compared to the conventional gangform, the proposed gangform showed greater performance not only in reduction of safety accidents on-site, but also in constructability and environmental aspects. The results of this study are expected to be served as the basis for developing the lightweight gangform in future.

  • PDF

A Study on the Development of Automated Gangform Climbing System for Apartment Housing Construction (공동주택 전용 갱폼 인양 자동화 기술 개발에 관한 연구)

  • Yang, Sang-Hoon;Cho, Jae-Yong;Cho, Ji-Won;Lee, Jeong-Ho;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.53-66
    • /
    • 2012
  • Gangform compared with conventional wood and steel form is systemized form which has a capability to install and dismantle form at a time without repeating to assembly and disassembly small members. Gangform compared with ACS has some problems such as 1) Tower Crane load increase, 2) increase in safety incidence during climbing Gangform, 3) decrease in detachment operation productivity, 4) stop work due to climate impacts, and 5) decrease in labor cost, productivity, quality. A conceptual design model of automated Gangform climbing system is suggested for apartment housing construction to show its technical/economic feasibility and workers' safety while increasing operation productivity and concrete quality.

Improvement of the PVC Window Frame Installation Method Integrated with Gangform and Field Applicability Analysis

  • Choi, Hyo-Sung;Lee, Jeong-Ho;Yoo, Huyn-Seok;Kim, Young-Suk;Han, Seung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.482-500
    • /
    • 2011
  • In apartment housing construction, window frame installation work, which is conducted after the structural framework, is very important, because its completion time directly affects the starting time of successive interior finishing works, as well as the overall construction period. Construction delays in interior finishing works might occur due to problems inherent to the conventional window frame installation method, such as the poor verticality of window frames, and the water leakage around them. The primary objective of this study is to analyze the problems of a 'Gangform integrated PVC window frame pre-installation method' based on its pilot test results. Next, this study proposes an improved conceptual model that enables the end users to enhance the field applicability of this method in terms of productivity, time, and cost. The field applicability of the proposed 'Gangform integrated PVC window frame pre-installation method' was also verified through a survey.

Revitalization Methods of EIFS for High-rise Residential Buildings through Using TACT and Gangform System with Hanging Scaffolding

  • Lee, Sang-Hyun;Yi, June-Seong;Shin, Seung-Woo;Kang, Hae-Min
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.4
    • /
    • pp.407-418
    • /
    • 2011
  • Recently energy management measures at the political level, for the purpose of reducing energy consumption in the building sector, are being actively introduced. As a practical method, the exterior insulation method, which is proven to effective in reducing the energy loss through walls, has been favored. In this study, detailed implementations are suggested to activate exterior insulation system which can improve the housing insulation performance. The newly designed Gang-form system with hanging scaffolding was suggested to revamp constructability for finishing outer wall. The research results are based on a multifaceted analysis of the current problems of exterior insulation systems, and on recommendations proposed by exterior insulation experts in the Charrette discussion. The study has indicates that the customized TACT schedule considering the site condition has shortened the construction period to 5 months from 7.5 months. Through utilizing the suggestions of this study, the prevalence of exterior insulation systems is expected to become widespread.

Suggestion of Safety Vest Prototype according to Work Type for Construction Workers (건설 작업자의 공종별 안전조끼 프로토타입 제안)

  • Lee, Jeong-Hoon;Lee, Jae-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.863-873
    • /
    • 2023
  • This research explores the efficacy of safety vest colors at construction sites to enhance worker safety. Utilizing the Munsell color system and the Korean Standard Color Analysis program(KSCA), the study developed a prototype safety vest tailored to specific types of construction work. A safety vest with a color contrasting the site's environment significantly improves worker visibility and intuitiveness in identification, potentially reducing safety incidents. The study determined the optimal color specifications(hue, value, chroma) for safety vests in various construction roles, such as 10GY, 8, 8 for rebar placement, 8.75B, 7, 8 for Euroform, 3.75B, 2, 4 for Gangform, and 6.25BG, 5, 10 for steel erection. Feedback from construction experts on these prototypes, particularly regarding the safety vests for rebar placement and steel framework, was overwhelmingly positive(90% approval). Consequently, the proposed safety vest color scheme is deemed highly effective.