AN ECONOMIC PRODUCTION QUANTITY INVENTORY MODEL INVOLVING FUZZY DEMAND RATE AND FUZZY DETERIORATION RATE

  • De, Sujit-Kumar;A. Goswami;P.K. Kundu
    • Journal of applied mathematics & informatics
    • /
    • 제12권1_2호
    • /
    • pp.251-260
    • /
    • 2003
  • Generally, in deriving the solution of economic production quantity (EPQ) inventory model, we consider the demand rate and deterioration rate as constant quantity. But in case of real life problems, the demand rate and deterioration rate are not actually constant but slightly disturbed from their original crisp value. The motivation of this paper is to consider a more realistic EPQ inventory model with finite production rate, fuzzy demand rate and fuzzy deterioration rate. The effect of the loss in production quantity due to faulty/old machine have also been taken into consideration. The methodology to obtain the optimum value of the fuzzy total cost is derived and a numerical example is used to illustrate the computation procedure. A sensitivity analysis is also carried out to get the sensitiveness of the tolarance of different input parameters.

FUZZY GOAL PROGRAMMING FOR CRASHING ACTIVITIES IN CONSTRUCTION INDUSTRY

  • Vellanki S.S. Kumar;Mir Iqbal Faheem;Eshwar. K;GCS Reddy
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.642-652
    • /
    • 2007
  • Many contracting firms and project managers in the construction industry have started to utilize multi objective optimization methods to handle multiple conflicting goals for completing the project within the stipulated time and budget with required quality and safety. These optimization methods have increased the pressure on decision makers to search for an optimal resources utilization plan that optimizes simultaneously the total project cost, completion time, and crashing cost by considering indirect cost, contractual penalty cost etc., practically charging them in terms of direct cost of the project which is fuzzy in nature. This paper presents a multiple fuzzy goal programming model (MFGP) that supports decision makers in performing the challenging task. The model incorporates the fuzziness which stems from the imprecise aspiration levels attained by the decision maker to these objectives that are quantified through fuzzy linear membership function. The membership values of these objectives are then maximized which forms the fuzzy decision. The problem is solved using LINGO 8 optimization solver and the best compromise solution is identified. Comparison between solutions of MFGP, fuzzy multi objective linear programming (FMOLP) and multiple goal programming (MGP) are also presented. Additionally, an interactive decision making process is developed to enable the decision maker to interact with the system in modifying the fuzzy data and model parameters until a satisfactory solution is obtained. A case study is considered to demonstrate the feasibility of the proposed model for optimization of project network parameters in the construction industry.

  • PDF

APPLICATION OF FUZZY LINEAR PROGRAMMING FOR TIME COST TRADEOFF ANALYSIS

  • Vellanki S.S. Kumar;Mir Iqbal Faheem;Eshwar. K;GCS Reddy
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.69-78
    • /
    • 2007
  • In real world, the project managers handle conflicting goals that govern the use of resources within the stipulated time and budget with required quality and safety. These conflicting goals are required to be optimized simultaneously by the project managers in the framework of fuzzy aspiration levels. The fuzzy linear programming model proposed herein helps project managers to minimize total project costs, completion time, and crashing costs considering indirect costs, contractual penalty costs etc by practically charging them in terms of direct cost of the project. A case study of bituminous pavement under construction is considered to demonstrate the feasibility of applying the proposed model for optimization of project parameters. Consequently, the proposed model yields an efficient compromise solution and the decision maker's overall degree of satisfaction with multiple fuzzy goal values. Additionally, the proposed model provides a systematic decision-making framework, enabling decision maker to interactively modify the fuzzy data and model parameters until a satisfactory solution is obtained. The significant characteristics that differentiate the proposed model with other models include, flexible decision-making process, multiple objective functions, and wide-ranging decision information.

  • PDF

Fuzzy programming for improving redundancy-reliability allocation problems in series-parallel systems

  • Liu, C.M.;Li, J.L.
    • International Journal of Reliability and Applications
    • /
    • 제12권2호
    • /
    • pp.79-94
    • /
    • 2011
  • Redundancy-reliability allocation problems in multi-stage series-parallel systems are addressed in this study. Fuzzy programming techniques are proposed for finding satisfactory solutions. First, a multi-objective programming model is formulated for simultaneously maximizing system reliability and minimizing system total cost. Due to the nature of uncertainty in the problem, the fuzzy set theory and technique are used to convert the deterministic multi-objective programming model into a fuzzy nonlinear programming problem. A heuristic method is developed to get satisfactory solutions for the fuzzy nonlinear programming problem. A Pareto optimal solution is found with maximal degree of satisfaction from the interception area of fuzzy sets. A case study that is related to the electronic control unit installed on aircraft engine over-speed protection system is used to implement the developed approach. Results suggest that the developed fuzzy multi-objective programming model can effectively resolve the fuzzy and uncertain problem when design goals and constraints are not clearly confirmed at the initial conceptual design phase.

  • PDF

Fuzzy Goal Programming을 이용한 최적 검사 정책 (Optimal Inspection Policy By Fuzzy Goal Programming)

  • 유정상
    • 산업경영시스템학회지
    • /
    • 제18권34호
    • /
    • pp.185-191
    • /
    • 1995
  • In this research, a mathematical programming model is developed for the economic modeling of sampling plans based on two evaluation criteria : the outgoing quality and the average total inspection cost A fuzzy goal programming model and its solution procedure are proposed for the managers whose management objectives on the two evaluation criteria are not rigorous. To study the sensitivity of quality characteristic dependence on the resulting inspection plans, a numerical example is solved several times for a dependent model.

  • PDF

애매성을 고려한 퍼지이론을 이용한 송전망확충계획에 관한 연구 (Consideration of Ambiguties on Transmission System Expansion Planning using Fuzzy Set Theory)

  • 트란트룽틴;김형철;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.261-265
    • /
    • 2004
  • This paper proposes a fuzzy dual method for analyzing long-term transmission system expansion planning problem considering ambiguities of the power system using fuzzy lineal programming. Transmission expansion planning problem can be formulated integer programming or linear programming with minimization total cost subject to reliability (load balance). A long-term expansion planning problem of a grid is very complex, which have uncertainties fur budget, reliability criteria and construction time. Too much computation time is asked for actual system. Fuzzy set theory can be used efficiently in order to consider ambiguity of the investment budget (economics) for constructing the new transmission lines and the delivery marginal rate (reliability criteria) of the system in this paper. This paper presents formulation of fuzzy dual method as first step for developing a fuzzy Ford-Fulkerson algorithm in future and demonstrates sample study. In application study, firstly, a case study using fuzzy integer programming with branch and bound method is presented for practical system. Secondly, the other case study with crisp Ford Fulkerson is presented.

  • PDF

무인반송 차량시스템의 정밀 추적제어 (Precise Tracking control of Automated Guided Vehicle System)

  • 신두진;허욱열
    • 대한전기학회논문지:시스템및제어부문D
    • /
    • 제50권7호
    • /
    • pp.313-317
    • /
    • 2001
  • This paper proposed a fuzzy logic cross coupled controller which can enhance the path tracking performance of optically guided AGV(Automated Guided Vehicle). The AGV follows the guide path, it cannot be avoid the deviation from the path due to the inevitable error and the deviation must be corrected. Optically guided AGV used in industrial area is controlled by On-Off controller generally, the experimental AGV has three optical sensors in front body. In this structure, we could not know the leaving distance accurately and steering angle from the guided line, so AGV could not be controlled properly with conventional controller in the case of increasing or decreasing velocity. If we mount additional sensors the AGV, we could know the leaving distance and steering angle from the guided line and proper error compensating methode can be applied. But because cost of sensors are high, the cost of total system is increasing. So, in this paper, to improve the tracking performance of AGV which has the minimum number of sensors and fuzzy logic cross coupled controller is proposed. Some simulations and experimental results are presented to illustrate the performance of the proposed controller.

  • PDF

Power Sharing and Cost Optimization of Hybrid Renewable Energy System for Academic Research Building

  • Singh, Anand;Baredar, Prashant
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권4호
    • /
    • pp.1511-1518
    • /
    • 2017
  • Renewable energy hybrid systems look into the process of choosing the finest arrangement of components and their sizing with suitable operation approach to deliver effective, consistent and cost effective energy source. This paper presents hybrid renewable energy system (HRES) solar photovoltaic, downdraft biomass gasifier, and fuel cell based generation system. HRES electrical power to supply the electrical load demand of academic research building sited in $23^{\circ}12^{\prime}N$ latitude and $77^{\circ}24^{\prime}E$ longitude, India. Fuzzy logic programming discover the most effective capital and replacement value on components of HRES. The cause regarding fuzzy logic rule usage on HOMER pro (Hybrid optimization model for multiple energy resources) software program finds the optimum performance of HRES. HRES is designed as well as simulated to average energy demand 56.52 kWh/day with a peak energy demand 4.4 kW. The results shows the fuel cell and battery bank are the most significant modules of the HRES to meet load demand at late night and early morning hours. The total power generation of HRES is 23,794 kWh/year to the supply of the load demand is 20,631 kWh/year with 0% capacity shortage.

다목적 비선형 혼합정수계획법을 이용한 셀 형성 (Cell Formation Using Fuzzy Multiobjective Nonlinear Mixed-integer Programming)

  • 오명진
    • 산업경영시스템학회지
    • /
    • 제23권61호
    • /
    • pp.41-50
    • /
    • 2000
  • Cell formation(CF) Is to group parts with similar geometry, function, material and process into part families, and the corresponding machines into machine cells. Cell formation solutions often contain exceptional elements(EEs). Also, the following objective functions - minimizing the total costs of dealing with exceptional elements and maximizing total similarity coefficients between parts - have been used in CF modeling. Thus, multiobjective programming approach can be developed to model cell formation problems with two conflicting objective functions. This paper presents an effective cell formation method with fuzzy multiobjective nonlinear mixed-integer programming simultaneously to form machine cells and to minimize the cost of eliminating EEs.

  • PDF

한-유럽 복합운송 경로선택에 관한 연구 중국-유럽 화물열차를 중심으로 (Multimodal Route Selection from Korea to Europe Using Fuzzy AHP-TOPSIS Approaches: The Perspective of the China-Railway Express)

  • 왕관;안승범
    • 한국항만경제학회지
    • /
    • 제37권4호
    • /
    • pp.13-31
    • /
    • 2021
  • 2011년 한-유럽 FTA 체결 이후 두 지역의 거래액은 증가일로에 있으며 전체 시장은 지속적으로 확대되고 있다. 여러 운송수단을 이용하는 복합국제운송에 대한 관심이 늘어나며 기존의 해운운송 위주의 운송 방식에서 철도를 포함한 두 가지 이상의 운송수단을 사용하는 다중운송경로를 통한 운송이 확대되고 있다. COVID-19의 영향으로 2019년 세계 화물 시장이 타격을 받았는데 특히 해상 및 항공 노선의 급격한 제한에 기인하고 한국의 대유럽 수출도 감소하였다. 이러한 영향에도 2020년 CRE(China Railway Express) 화물 열차의 총 수는 2016년 대비 7.3배 증가한 12,406개 노선으로 전년 대비 50% 증가하였다. 철도를 이용한 육상기반의 화물운송에 대한 연구는 꾸준히 있어 왔으나 한국과 유럽의 운송노선에 대한 연구는 TSR(Trans Siberian Railway), 수에즈 해운(Suez Shipping), 기존 TCR(Trans China Railway) 노선에 국한되었다. 본 논문은 중국에서의 일대일로 구상에 따라 최근 변화를 겪고있는 실크로드의 핵심에 초점을 맞추어 중국-유럽 화물열차(CRE)를 대상으로 연구를 진행하였다. Fuzzy-AHP는 한국에서 유럽으로 가는 국제 복합항로 선정 시 요인의 우선순위를 결정하는데 사용하였으며 중국과 한국의 전문가 설문조사를 통해 결과를 도출하였다. 요인 선정 후 TOPSIS 방법을 적용하여 계획된 3개의 경로를 순위화하였다. 그 결과 총비용, 총시간, 서비스 신뢰도가 CRE 기반 복합운송을 선택할 때 의사결정자가 고려하는 요소로 나타났다. 또한, 주요 3개 복합운송노선에서 Route 1(인천-대련-만주-함부르크) 노선이 최적 노선이고 Route 2(인천-리차오-얼롄하오터-함부르크)와 Route 3(인천-롄윈강-시안-함부르크) 순서로 나타났다.