• 제목/요약/키워드: full-scope replica

검색결과 5건 처리시간 0.019초

가압경수로 원자력 발전소의 전범위 복제형 시뮬레이터 개발 (The Development of Full-Scope Replica Type Simulator for PWR Nuclear Power Plants)

  • 이중근
    • 한국시뮬레이션학회논문지
    • /
    • 제6권1호
    • /
    • pp.85-96
    • /
    • 1997
  • Designing and constructing a proper simulator for real power plants requires extensive research in human engineering and computer science and integration of different fields of technologies such as system analysis, operational knowledge for nuclear plant, etc. A full scope replica type simulator for nuclear power plant is developed. The simulator has the same feature and operational functions as one in the main control room (MCR) of a reference power plant. The simulator provides the necessary training to recover or reduce damages from accidents that usually are unpredictable. This paper describes the configurations and characteristics for the simulator that is developed for Younggwang Nuclear Power Plant #3,4 which is the basic model of the Korean Nuclear Power Plant. The paper also describes technical aspects of Auto Code Generator that is used for developing the simulator. The successful development of the simulator will contribute to improve safety in operation of nuclear power plants.

  • PDF

영광 3,4호기 Foxboro 제어시스템 모델링 및 시뮬레이션 (Modeling and simulation of foxboro control system for YGN#3,4 power plant)

  • 김동욱;이용관;유한성
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1997년도 한국자동제어학술회의논문집; 한국전력공사 서울연수원; 17-18 Oct. 1997
    • /
    • pp.179-182
    • /
    • 1997
  • In a training simulator for power plant, operator's action in the MCR(Main Control Room) are given to plant process and computer system model as an inputs, and the same response as in real power plant is provided in real time. Inter-process communication and synchronization are especially important among various inputs. In the plant simulator, to simulate the digital control system such as FOXBORO SPEC-200 Micro control system, modification and adaptation of control card(CCC) and its continuous display station(CDS) is necessary. This paper describes the modeling and simulation of FOXBORO SPEC-200 Micro control system applied to Younggwang nuclear power plant unit #3 & 4, and its integration process to the full-scope replica type training simulator. In a simulator, display station like CDS of FOXBORO SPEC-200 Micro control system is classified as ITI(Intelligent Type Instrument), which has a micro processor inside to process information and the corresponding alphanumeric display, and the stimulation of ITI limits the important functions in a training simulator such as backtrack, replay, freeze and IC reset. Therefore, to achieve the better performance of the simulator, modification of CDS and special firmware is developed to simulate the FOXBORO SPEC-200 Micro control system. Each control function inside control card is modeled and simulated in generic approach to accept the plant data and control parameter conveniently, and debugging algorithms are applied for massive coding developed in short period.

  • PDF

변압 관류형 초임계압 화력발전소 전범위 시뮬레이터 개발 (The development of full-scope replica simulator for variable supercritical pressure once-through fossil power plants)

  • 이중근;안연식;정훈;이용관;한병성
    • 제어로봇시스템학회논문지
    • /
    • 제4권3호
    • /
    • pp.392-399
    • /
    • 1998
  • A full-scope replica type simulator whose MCR(main control room) has the same features and operation functions as MCR of the reference power plant has been developed for a fossil power plant. This simulator was developed with the model of Poryung Fossil Power Plant #3,4 which is the standard model of the Korean fossil power plant. It is the first localized simulator for the supercritical, variable boiler pressure type fossil power plant. The simulator provides various kinds of accidents which are in normal plant operation and thus enables operators to recover or reduce possible damages. To design and develop this kind of simulator, we need to integrate high technologies such as system analysis, plant operation and system integration of mechanics, physics, computer science. CASE(Computer Aided Software Engineering) tools were used to develop the dynamic model. This simulator will greatly contribute to the improvement of the safety and efficiency of the fossil power plant by implementing operator training. In this paper, the outline of software and hardware configuration and characteristics of the simulator are described, and the results of 30%, 50%, 75%, 100% load operation test will be discussed.

  • PDF

The Simulation of Boiler System for HADONG Fossil Power Plant

  • Choi, Jin-Ho;Ma, Sam-Sun;Lee,Yong-Kwan
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 1999년도 추계학술대회 논문집
    • /
    • pp.56-61
    • /
    • 1999
  • The Simulation of Boiler System for Hadong Fossil power plant has been made by Korea Electric Power Research Institute (KERRI) in an attempt to develop Windown NT based full scope replica simulator for Hadong Fossil power plant, 500MWe once-through boiler. In the project KERRI developed Once Through, Super Critical type Boiler System, the core part of the Simulation and integrated the system with other process systems such as BOP System, and AUX System. This paper is to introduce the basic concept of the simulation for the Boiler System. It will also introduce PRO-TRAX System, for used as a modeling tool.

  • PDF

발전소 시뮬레이터 기술동향 및 국내 기술자립 계획 (The Status of Power Plant Simulation Technology and KEPCO's Plan for Self-Reliance of the Technology)

  • 신영철;이용관
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1993년도 하계학술대회 논문집 A
    • /
    • pp.525-528
    • /
    • 1993
  • KEPCO Research Center is carrying out a simulator(full scope replica type) development project for two nuclear power plants(Kori-2, Younggwang-3,4) and one fossil power plant(Poryong-3,4). In this project, we aim not only the installation of high performance simulators at the power plant sites but also the realization of self reliance of power plant simulation technology in Korea. In the course of preparing procurement specification for the 3 simulators, the present status of power plant simulation technology has been surveyed and is presented in this paper. The fidelity of simulation and the automation of simulation model production has been greatly improved due to the ever increasing computing power of today's workstations. The need and importance of the application of high fidelity simulators to the operator training is refocused since the accident at TMI Nuclear Power Plant, U.S.A.

  • PDF