• 제목/요약/키워드: full dredging and replacement

검색결과 1건 처리시간 0.014초

완전준설 치환공법에 의한 컨테이너 부지조성 사례 (A Case study of Ground Treatment for Container Terminal Site Formation with Full Dredging and Replacement Method)

  • 홍의;심동현
    • 기술발표회
    • /
    • 통권2006호
    • /
    • pp.235-247
    • /
    • 2006
  • A ground treatment work for Hongkong container terminal yard is reported as a case study of site formation work with full dredging and replacement method. Ground treatment work adopting surcharge and deep compaction (vibroflotation) were applied to improve the sand creep potential. The sand creep parameter of 0 25% was assumed in design stage and improved up to 0.05% and 0.02% after surcharge and deep compaction respectively

  • PDF