• Title/Summary/Keyword: full dredging and replacement

Search Result 1, Processing Time 0.013 seconds

A Case study of Ground Treatment for Container Terminal Site Formation with Full Dredging and Replacement Method (완전준설 치환공법에 의한 컨테이너 부지조성 사례)

  • Hong, Eui;Sim Dong-Hyun
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.235-247
    • /
    • 2006
  • A ground treatment work for Hongkong container terminal yard is reported as a case study of site formation work with full dredging and replacement method. Ground treatment work adopting surcharge and deep compaction (vibroflotation) were applied to improve the sand creep potential. The sand creep parameter of 0 25% was assumed in design stage and improved up to 0.05% and 0.02% after surcharge and deep compaction respectively

  • PDF