• Title/Summary/Keyword: free and fixed head pile

Search Result 8, Processing Time 0.027 seconds

A Study on Static Lateral Loading Test for Large Diameter Drilled Shaft Pile Considering the Pile Lead Fixity Conditions (말뚝두부구속조건을 고려한 대구경 현장타설말뚝에 대한 수평정재하시험 연구)

  • Lee, Min-Hee;Hwang, Geun-Bae;Jung, Sung-Min;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.36-43
    • /
    • 2004
  • Most of pile foundations are fixed head condition, but lateral loading test for pile is performed under free head condition generally In this study, a lateral loading test for a large diameter drilled shaft was performed under the fixed pile head and the free pile head condition, where lateral displacement along the pile depth was measure. Test results and theoretical values were compared and analyzed.

  • PDF

Comprehensive evaluating the stability of slope reinforced with free and fixed head piles

  • Xixi Xiong;Ying Fan;Jinzhe Wang;Pooya Heydari
    • Geomechanics and Engineering
    • /
    • v.32 no.5
    • /
    • pp.523-540
    • /
    • 2023
  • The failure of slope can cause remarkable damage to either human life or infrastructures. Stabilizing piles are widely utilized to reinforce slope as a slip-resistance structure. The workability of pile-stabilized slopes is affected by various parameters. In this study, the performance of earth slope reinforced with piles and the behavior of piles under static load, by shear reduction strength method using the finite difference software (FLAC3D) has been investigated. Parametric studies were conducted to investigate the role of pile length (L), different pile distances from each other (S/D), pile head conditions (free and fixed head condition), the effect of sand density (loose, medium, and high-density soil) on the pile behavior, and the performance of pile-stabilized slopes. The performance of the stabilized slopes was analyzed by evaluating the factor of safety, lateral displacement and bending moment of piles, and critical slip mechanism. The results depict that as L increased and S/D reduced, the performance of slopes stabilized with pile gets better by raising the soil density. The greater the amount of bending moment at the shallow depths of the pile in the fixed pile head indicates the effect of the inertial force due to the structure on the pile performance.

A Study on Lateral Loading the Field Test of Pile for Large Diameter Drilled Shaft Pile (대구경 현장타설말뚝에 대한 현장수평재하시험에 관한 연구)

  • Choi, Yong-Kyu;Lee, Min-Hee;Lee, Chung-Sook
    • Journal of the Korean GEO-environmental Society
    • /
    • v.5 no.2
    • /
    • pp.33-39
    • /
    • 2004
  • Most of pile foundations are a condition of fixed head on pile, but lateral loading test of pile have performed to free head on generally. This study performed field lateral loading test accompanying lateral displacement by depth of pile for two cases(fixed head and free head) and analyzed lateral behavior of large drilled shaft. Furthermore compared theoretical equation with result of lateral loading test.

  • PDF

Analysis on the Rigid Connections between the Large Diameter Drilled Shaft and the Pile Cap for the Sea-Crossing Bridges with Multiple Pile Foundations (다주식 기초 해상교량에서 대구경 현장타설말뚝과 파일캡의 강결합에 대한 분석)

  • Cho, Sung-Min;Park, Sang-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.343-358
    • /
    • 2008
  • Piles of a bridge pier are connected with a column through a pile cap(footing). Behavior of the pile foundation can be different according to the connection method between piles and the pile cap. This difference causes a change of the design method. Connection methods between pile heads and the pile cap are divided into two groups ; rigid connections and hinge connections. KHBDC(Korea Highway Bridge Design Code) has specified to use rigid connection method for the highway bridge. In the rigid connection method, maximum bending moment of a pile occurs at the pile head and this helps the pile to prevent the excessive displacement. Rigid methods are also good to improve the seismic performance. However some specifications prescribe that conservative results through investigations for both the fixed-head condition and the free-head condition should be reflected in the design. This statement may induce an over-estimated design for the bridge which have very good quality structures with casing covered drilled shafts and the PC-house contained pile cap. Because the assumption of free-head conditions (hinge connections) are unreal for the elevated pile cap system with multiple piles of the long span sea-crossing bridges. On the other hand, elastic displacement method to evaluate the pile reactions under the pile cap is not suitable for this type of bridges due to impractical assumptions. So, full modeling techniques which analyze the superstructure and the substructure simultaneously should be performed. Loads and stress state of the very large diameter drilled shaft and the pile cap for Incheon Bridge which will the longest bridge in Korea were investigated through the full modeling for rigid connection conditions.

  • PDF

Effect of Pile Head Constraint on Lateral Behavior of Single Flexible Pile in Non-homogeneous Sand (비균질 사질토 지반에서 단일 휨성말뚝의 수평거동에 대한 말뚝 두부 구속효과 연구)

  • 김병탁;김영수;정성관
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.5
    • /
    • pp.65-80
    • /
    • 1999
  • This paper shows the results of a series of model tests on the behavior of single flexible pile, which is subjected to lateral load, in non-homogeneous Nak-Dong River sands, consisting of two layers. The purpose of the present paper is to investigate the effects of ratio of lower layer thickness to embedded pile length, ratio of soil modulus of upper layer to lower one, and pile head constraint condition on the characteristics of lateral behavior of single pile. These effects can be quantified only by the results of model tests. Based on the results of model tests, in non-homogeneous sand, it was found that the lateral behavior depends upon the ratio of soil modulus of upper layer to lower one. And, in respect of deflection, it was found that the relationship between the deflection ratio of non-homogeneous to homogeneous sand and the ratio of lower layer thickness to embedded pile length can be fitted to exponential function of H/L and lateral load by model tests results. Also, in respect of maximum bending moment, it was found that the relationship H/L and $MBM_{fixed-head}/MBM_{free-head}$ can be fitted to linear function of H/L by model test results.

  • PDF

Earthquake-resistance Analysis of Piles Using Dynamic Winkler Foundation Model (동적 Winkler 보 모델을 이용한 말뚝의 내진해석)

  • 장재후;유지형;정상섬
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.2
    • /
    • pp.39-49
    • /
    • 2002
  • This paper describes a numerical method for pile foundation subjected to earthquake loading using dynamic Winkler foundation model. To verify the numerical method, shaking table tests were carried out. In shaking table tests, accelerations and pile bending moments were measured for single pile and pile groups with a spacing-to-diameter ratio of 2.5 under fixed input base acceleration. In numerical analysis, the input base and free field accelerations measured from shaking table tests were used as input base motions. Based on the results obtained, free field acceleration was magnified relative to input base acceleration, whereas pile head accelerations reduced relatively to free field acceleration for soil-pile interaction. Measured and predicted bending moments for both cases have maximum value within the distance 10cm(4d) from the pile top. However, there are some differences between the results of numerical analysis and shake table test below 10cm(4d) from the pile top.

Analysis on the Rigid Connections of the Drilled Shaft with the Cap for Multiple Pile Foundations (현장타설말뚝을 적용한 다주식 기초에서 말뚝과 캡의 강결합에 대한 분석)

  • Cho, Sung-Min
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.7
    • /
    • pp.61-73
    • /
    • 2008
  • Piles of a bridge pier are connected with the column through the pile cap (footing). Behavior of the pile foundation can be different according to the connection method between piles and the pile cap. Connection methods between pile heads and the pile cap are divided into two groups : rigid connections and hinge connections. Domestic design code has been specified to use rigid connection method for the highway bridge. In the rigid connection method, maximum bending moment of a pile occurs at the pile head and this helps the pile to prevent the excessive displacement. Rigid methods are also good to improve the seismic performance. However, some specifications prescribe that conservative results through investigations of both the fixed-head condition and the free-head condition should be reflected in the design. This statement may induce an over-estimated design for the bridge which has high-quality structures with casing covered drilled shafts and the PC-house contained pile cap. Because the assumption of free-head conditions (hinge connections) is unreal for the elevated pile cap system with multiple piles of the long span sea-crossing bridges. On the other hand, elastic displacement method to evaluate the pile reactions under the pile cap is not suitable for this type of bridges due to impractical assumptions. So, full modeling techniques which analyze the superstructure and the substructure simultaneously should be performed. Loads and stress state of the large diameter drilled shaft and the pile cap for Incheon Bridge which will be the longest bridge of Korea were investigated through the full modeling for rigid connection conditions.

Model Testing on the Behavior of Laterally Loaded Pile in NC Clay Soils (정규압밀 점토 지반에서 매입말뚝의 수평거동에 관한 모형 실험 연구)

  • Kim, Byeong-Tak;Lee, Sang-Ung;Kim, Yeong-Su
    • Geotechnical Engineering
    • /
    • v.14 no.5
    • /
    • pp.39-52
    • /
    • 1998
  • The pupose of the present paper is to estimate the effects of constraint condition of pile head, ground condition(dry unit weight. $\gamma_4$) and embedded pile lengths on the behavior of single pile which is embedded in normally consolidated clay. BBperiment functions can be quantified to these effects obtained from the results of model teats. The ground of model tests is normally consolidated( NC ) clay under three kinds of effective vertical stress. The results of the model tests using the steel pile of two different embedded pile length and of free-head and fired-head show that the lateral load-deflection relationship is to be elasto plastic behavior below $\gamma_d/\gamma_{dmax}$: 0.84 and that the reduction of lateral load of beyond maximum lateral load($Q_{max}$) at each model test is significantly time-dependent. In this study, it is shown that the displacement relationship can be fitted to exponential function of time by model best results. The effect of ground conditions on the ultimate and yield lateral load is fitted to exponential function including the ratio of dry unit weight to maximum dry unit weight. When tests by results are compared with those from Broms and Budhu et at., the predicted results are over-estimated about 27-87 ayo. In effectivity of constraint condition of pile head on the lateral load-deflection response, the $Q_{fixed}/Q_{gree}-y/D$ relationship is highly non-linear and fitted to parabolic function.

  • PDF