• Title/Summary/Keyword: frame inspection

Search Result 218, Processing Time 0.023 seconds

Structure and Fatigue Analyses of the Inspection Equipment Frame of a Semiconductor Test Handler Picker (반도체 테스트 핸들러 픽커 검사장비 프레임에 대한 구조 및 피로해석)

  • Kim, Young-Choon;Kim, Young-Jin;Kook, Jeong-Han;Cho, Jae-Ung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.10
    • /
    • pp.5906-5911
    • /
    • 2014
  • Currently, there are many processes of package assembly and inspections of real fields that examine whether a manufactured semiconductor can be operated regularly and can endure low humidity or high temperatures. As the inspection equipment of a semiconductor test handler picker has been used at the inspection process, these inspection equipment frames were modelled in 3D and these models were analyzed using 3 kinds of fatigue loadings. As the analysis result, maximum deformation occurred at the midparts of the frames at cases 1 and 2. Among the cases of nonuniform fatigue loads, the 'SAE bracket history' with the severest change in load became the most unstable but the 'Sample history' became the most stable. Fatigue analysis result can be used effectively with the design of an inspecting equipment frame of a semiconductor test handler picker to examine the prevention and durability against damage.

Improvement and Evaluation of Seismic Resistant Performance of Reinforced Concrete Infilled Masonry Frame (철근콘크리트 프레임면내 조적벽체의 내진성능 평가 및 개선기술)

  • Shin, Jong-Hack;Ha, Gee-Joo;Jun, Ha-Suk;Lee, Jong-Chan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.4 no.1
    • /
    • pp.147-155
    • /
    • 2000
  • Five reinforced concrete rigid frame and masonry infilled wall and cut off type masonry infilled wall were tesed during vertical and cyclic loads simultaneously. Experimental programs were accomplished to improve and evaluate the structural performance of test specimens, such as the hysteretic behavior, the maximum horizontal strength, crack propagation, and ductility etc. Test variables are hoop reinforcement ratio, with or without masonry infilled wall, and masonry method. All the specimens were constructed in one-third scale size. Based on the test results, the following conclusions can be made. For masonry infilled wall(IFB-1), maximum horizontal capacity was increased by 1.45 time in comparision with that of rigid frame(FB-0). For cut off masonry infilled wall (IFBC-1~3), maximum horizontal capacity was increased by 1.73~1.98 time in comparision with that of rigid frame(FB-0). For cut off masonry infilled wall(IFBG-1~3), ductility was increased by 1.48~2.08 time in comparision with that of masonry infilled wall (IFB-1).

  • PDF

A Welding Inspection of Small-sized Metalized Film Capacitor with Large Capacity (소형.대용량 Metalized Film Capacitor의 용접 오차 검출 개발)

  • Jeong, Won-Young;Oh, Choon-Suk;Ryu, Young-Kee;Lim, Jong-Seul;Lee, Seo-Young
    • Proceedings of the KIEE Conference
    • /
    • 2004.11c
    • /
    • pp.135-137
    • /
    • 2004
  • In this study we'll deal with the small-sized metalized film capacitors with large capacity which head have $5mm{\times}5mm{\times}2.5mm$ dimension. The lead wire is used to weld at both sides of capacitors. At that time the position gap between the welding machine and lead wire supplier would cause the welding error. Also, during the tapping processing of metalized film capacitors, the interval error among the capacitors, the length error of lead frame attached at the capacitors, and the straightness distortion of the lead frame could happen. As mentioned, four kinds of error parameters will be measured and analyzed by using the automatic visual inspection system that is implemented with CCD camera, optical parts, background lighting, and image processing algorithms. Finally we are able to achieve success rate above 99% to detect the welding faults of capacitors in the field test.

  • PDF

Approximate Analysis of Shear Wall-Frame Structure For Seismic Design (전단벽-골조 시스템의 내진설계를 위한 근사해석법)

  • Yoo, Suk-Hyung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.2
    • /
    • pp.99-106
    • /
    • 2019
  • A wall-frame structure resists horizontal load by the interaction between the flexural mode of the shear wall and the shear mode of the frame, which implies that the frame deflects only by reverse bending of the columns and girders, and that the columns are axially rigid. However, as the height of frame increases the shear mode of frame changes to flexural mode, which is due to the extension and shortening of the columns. An approximate hand method for estimating horizontal deflection and member forces in high-rise shear wall-frame structures subjected to horizontal loading is presented. The method is developed from the continuous medium theory for coupled walls and expressed in non-dimensional structural parameters. It accounts for bending deformations in all individual members as well as axial deformations in the columns. The deformations calculated from the presented approximate method and matrix analysis by computer program are compared. The presented approximate method is more accurate for the taller structures.

Vision System for Precision Dimensional Inspection of Bicycle Frames (자전거프레임 형상 정밀측정을 위한 비젼 시스템)

  • 여인재;박희재
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1995.04b
    • /
    • pp.389-395
    • /
    • 1995
  • The bicycle production process mainly consists of welding process of pipes and its quality is determined by geometrical symmetry of arrangement of welded pipes. Hence, manual quality control of bicycle frames was very ineffecient and required much time in dimensional inspection and does not reserve high precision. In this paper we introduce a method of fast and accurate dimensional inspection of bicycle frame, using the Stereo Vision system and related some image processing techniques.

  • PDF

Structural and Functional Measurements of a Space Truss Frame for Maintenance Works in Tunnels (터널의 유지보수공사 개선을 위한 가설 스페이스 트러스 프레임의 사용성 및 안정성 평가)

  • Lee, Dong Kyu;Kim, Do Hwan;Kim, Jin Ho
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.92-98
    • /
    • 2012
  • This study shows details of a specific space truss frame structure devised to carry out maintenance and repair temporary works in tunnels. The purpose of this study is to verify structural safety and function of the innovative truss structure through an analysis tool, i.e.. ABAQUS, which is a suite of software application for finite element analysis and computer aided engineering. And then optimized size, i.e., thickness and diameter of truss members is evaluated in practice. In this study, construction methods in the temporary works are additionally represented by using the new space truss frame structure.

Modified Proposal for Optimal Location of Offset Outrigger System in High-rise Building (초고층 오프셋 아웃리거 구조의 최적 위치에 대한 수정제안)

  • Kim, Hyong-Kee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.5
    • /
    • pp.37-44
    • /
    • 2020
  • This research aimed to propose the more proper equation than the leading and existing equations to predict the optimum location of offset outrigger. In this study, a 79 existing models of offset outrigger system were examined. And the key factors in the existing offset outrigger models were the stiffness of shear wall and offset outrigger system, the stiffness of exterior column connected in offset outrigger, the frame stiffness, the ratios of lateral stiffness of frame in shear wall-frame structures, and all that. This paper proposed the modified equation of predicting the optimal location of offset outrigger system. Additionally, the findings of this study provided the important structure engineering materials of the optimal offset outrigger position in tall building.