가배수 터널을 이용한 이상홍수 대비 단면확보에 관한 연구 (A Study on the Cross Section Insurance to Provide for the Extraordinary Flood for the Reservoir of the Temporary Division Tunnel)

  • 백원현;박기범;지홍기
    • 한국환경과학회지
    • /
    • 제17권7호
    • /
    • pp.733-741
    • /
    • 2008
  • The object of this study is the safety insurance of the dam to provide for the extraordinary flood. The safety insurance of the reservoir was taken by the preparatory discharge using the temporary division tunnel used during the reservoir construction. In this study, the Sungju reservoir was simulated. The existing discharge facilities of the intake tower of the Sungju reservoir could nat have influence on the flood control. When the Sungju reservoir operated to begin preparatory discharge for 48 hrs by the temporary diversion tunnel that have discharge of an 20-years frequency, the water level was lowered about 20 cm. When the Sungju reservoir operated to begin the continuous discharge after the preparatory discharge, the water level was lowered over 1m but the downstream at risk was caused by the resulted. If it is possible to operate to begin the preparatory discharge of the reservoir for 24 hrs by the temporary diversion tunnel, that will improve the flood control faculty of the reservoir without other hydraulic structure and safety of the Sungju reservoir will be higher.

방콕의 터널공사 - 두 개의 사례연구 (Tunnelling in Bangkok - Two Case Studies)

  • 테브라스카 완차이;조계춘
    • 한국터널지하공간학회 논문집
    • /
    • 제7권2호
    • /
    • pp.153-163
    • /
    • 2005
  • 본 논문에서는 타이 방콕의 지하철 터널현장과 홍수방지용 터널현장에 대한 사례연구를 수행하였다. 첫 번째 사례연구는 복식터널인 방콕 MRT 지하철 현장으로써 터널연장이 대략 20 km이고 18개의 정거장으로 구성되어져 있다. 터널은 지표면으로부터 15~20m 깊이에 위치하는 첫 번째 단단한 실트성 점토층에 위치한다. 현장계측으로부터 얻어진 굴착에 의한 지반의 변위거동이 제시되었다. 평면변형율 유한요소해석을 통하여 역해석을 수행하였으며, 이로부터 나온 결과는 현장에서 계측된 결과와 일치하였다. 유한요소해석으로부터 산정된 전단변형율은 0.1~1.0%의 범위내에 존재하였으며, 자동보링 프래셔미터 시험으로부터 나온 결과와 비슷하였다. 한편, 두 번째 사례연구는 지하 장애물 밑으로 관통하는 EPB타입의 터널공사 현장과 관련이 있다. Premprachakorn 홍수방지용 터널은 장마시기에 홍수를 Choapraya강으로 전환하기 위한 지름길의 터널이다. 터널은 대략 지하 20~24m에 위치한 매우 단단한 실트성 점토층에 EPB타입 쉴드터널공법에 의하여 건설되었다. 터널이 이미 존재하고 있는 방콕의 주된 용수터널과 다리의 기초 아래에서 시공되는 동안에 현장계측이 수행되었으며, 이 계측결과를 유한요소해석으로부터 산정된 결과와 비교하였다. 또한 손상평가를 예측하기 위한 수단으로 방지 리스크 포텐셜 방법을 제시하고 논의하였다.

  • PDF

한반도 기후 변화에 따른 수해 및 빗물 저류터널(Flood Drainage Tunnel) 건설의 세계 동향 검토 연구

  • 최재화;지왕률
    • 자연, 터널 그리고 지하공간
    • /
    • 제14권2호
    • /
    • pp.31-37
    • /
    • 2012
  • In the circumstances being continuous the unusual weather in the world, the city of Seoul has been devastating flood damage in July 2011, because of the heavy rainfalls. Along with expensive repairs to property, thousands of flood victims occurred; it is difficult to estimate the direct and indirect economic damages in city. Recently, as a part of the flood protecting measures, there are being discussed about the deep underground flood drainage tunnel, underground regulating reservoirs, permeable pavement, infiltration facility, river improvements, diversion channel, sewer pipe and ditch improvement and so on. Therefore, it is useful to make the plan of flood protecting measures more and more cost-effective and rational methods by considering the similar flood measures and constructions in the mega cities like Seoul.

  • PDF

SHIHMEN SEDIMENT PREVENTION DIVERSION TUNNEL PLANNING AND DESIGN

  • Ho-Shong Hou;Ming-Shun Lee;Percy Hou
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.168-172
    • /
    • 2009
  • Shihmen reservoir was started in May 1963. The main purposes of Shihmen reservoir are for agriculture, power supply, flood control and tourism. Shihme Asn dam is an earth dam. Its crown height is 133m above mean sea level, with length 360 m, watershed 763.4 km2, and maximum volume 309 million cms. Turbidity in Shihmen dam was severely affected by typhoons Aere (2004) and Masa (2005). Increased deposition after Aere was 28 million cms. Turbidity at Shihmen Canal Inlet is 3000 NTU (Nephelometry Turbidity Unit). Sediment sluicing strategies for downstream channel are demanded. Therefore, diversionary sediment preventing channel is planned in the upstream of Shihmen reservoir. Finally, turbid flow in tunnel channel is bypassed and diverted its flow down to downstream.

  • PDF

홍수시 월류를 고려한 콘크리트 가물막이댐의 파괴확률 산정 (Failure Probability Analysis of Concrete Cofferdam Considering the Overflow in Flood Season)

  • 홍원표;송창근
    • 한국안전학회지
    • /
    • 제35권5호
    • /
    • pp.30-38
    • /
    • 2020
  • In order to construct a dam, the diversion facility such as cofferdam and a diversion tunnel should be installed in advance. And size of a cofferdam depends on type of a main dam. According to the Korea Dam Design Standard, if the main dam is a concrete dam, design flood of the cofferdam is 1~2 years flood frequency. This means that overflow of the cofferdam occurs one time for 1 or 2 years, therefore, stability of the cofferdam should be secured against any overflow problem. In this study, failure probability analysis for the concrete cofferdam is performed considering the overflow. First of all, limit state function of the concrete cofferdam is defined for overturning, sliding and base pressure, and upstream water levels are set as El. 501 m, El. 503 m, El. 505 m, El. 507 m. Also, after literature investigation research, probabilistic characteristics of various random variables are determined, the failure probability of the concrete cofferdam is calculated using the Monte Carlo Simulation. As a result of the analysis, when the upstream water level rises, it means overflow, the failure probability increases rapidly. In particular, the failure probability is largest in case of flood loading condition. It is considered that the high upstream water level causes increase of the upstream water pressure and the uplift pressure on the foundation. In addition, among the overturning, the sliding and the base pressure, the overturing is the major cause for the cofferdam failure considering the overflow.

안동-임하 연결도수로 설치에 따른 가용 수자원량에 관한 연구 (Study on Potential Water Resources of Andong-Imha Dam by Diversion Tunnel)

  • 추연문;지홍기;권기대;김철영
    • 한국산학기술학회논문지
    • /
    • 제15권2호
    • /
    • pp.1126-1139
    • /
    • 2014
  • 도시화 및 산업화에 따른 온실가스의 증가로 전 세계적인 이상기후 현상이 빈번하게 발생하고 있으며, 국내에서도 이러한 현상의 하나로 홍수와 가뭄의 영향이 지속적으로 심화되고 있다. 기후변화는 이수, 치수, 환경 등 다양한 측면에서 물 관리 전반에 걸쳐 복잡성을 가중시키고 불확실성을 확대시키는 등 많은 영향을 초래한다. 또한 과거와는 달리 하천유지수량, 환경용수량 등 다양한 용수수요의 증가에 따라 제한된 가용수자원의 추가적인 확보를 위한 분석과 연구가 필요하다. 본 연구에서는 안동댐과 임하댐 유역을 대상으로 기후변화 시나리오와 토양수분 저류구조 Tank 모형을 이용하여 장기 유출량을 산정하였고, 연결도수로를 통해 병렬 연결된 안동댐과 임하댐의 저수지 연결모의운영을 수행하여 임하댐에서 안동댐으로 전환되는 추가 가용 수자원량을 분석, 비교함으로서 미래 기후변화가 가용수자원 확보에 미치는 영향을 정량적으로 평가하였다. 대표농도경로 기후변화 시나리오 중 RCP 6.0과 RCP 8.5를 이용하여 대상유역의 상세 수문자료를 생산하여 과거 유역의 관측 강수량 자료와 경향성을 분석한 결과 시나리오별 모두 5%~9%의 범위로 강수량이 증가하는 것으로 분석되었으며, 목적함수를 이용한 민감도 분석을 통해 가장 높은 적합도를 나타낸 개체군의 크기는 1000 이었으며 교차비율은 80% 이었다. 본 연구의 결과를 이용하여 미래 기후변화에 대응한 물 관리 측면에서 저수지 운영의 효과를 극대화하고 장기적으로 안정적이고 풍부한 용수공급 계획을 수립하는데 도움이 될 것으로 기대된다.