• Title/Summary/Keyword: flood diversion tunnel

Search Result 6, Processing Time 0.019 seconds

A Study on the Cross Section Insurance to Provide for the Extraordinary Flood for the Reservoir of the Temporary Division Tunnel (가배수 터널을 이용한 이상홍수 대비 단면확보에 관한 연구)

  • Baek, Won-Hyun;Park, Ki-Bum;Jee, Hong-Kee
    • Journal of Environmental Science International
    • /
    • v.17 no.7
    • /
    • pp.733-741
    • /
    • 2008
  • The object of this study is the safety insurance of the dam to provide for the extraordinary flood. The safety insurance of the reservoir was taken by the preparatory discharge using the temporary division tunnel used during the reservoir construction. In this study, the Sungju reservoir was simulated. The existing discharge facilities of the intake tower of the Sungju reservoir could nat have influence on the flood control. When the Sungju reservoir operated to begin preparatory discharge for 48 hrs by the temporary diversion tunnel that have discharge of an 20-years frequency, the water level was lowered about 20 cm. When the Sungju reservoir operated to begin the continuous discharge after the preparatory discharge, the water level was lowered over 1m but the downstream at risk was caused by the resulted. If it is possible to operate to begin the preparatory discharge of the reservoir for 24 hrs by the temporary diversion tunnel, that will improve the flood control faculty of the reservoir without other hydraulic structure and safety of the Sungju reservoir will be higher.

Tunnelling in Bangkok - Two Case Studies (방콕의 터널공사 - 두 개의 사례연구)

  • Teparaksa, Wanchai;Cho, Gye-Chun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.7 no.2
    • /
    • pp.153-163
    • /
    • 2005
  • This paper presents two case studies for tunnelling in Bangkok: a subway tunnel site and a flood diversion tunnel site. The first case study is related to ground displacement response for dual tunnel Bangkok MRT subway. The MRT subway project of Bangkok city consists of dual tunnels about 20 km long with 18 subway stations. The tunnels are seated in the firm first stiff silty clay layer between 15-22 m in depth below ground surface. The behavior of ground deformation response based on instrumentation is presented. The back analysis based on plain strain FEM analysis is also presented and agrees with field performance. The shear strain of FEM analysis is in the range of 0.1-1% and in accordance with the results of self boring pressuremeter tests. Meanwhile, the second case study is related to the EPB tunnelling bored underneath through underground obstruction. The Premprachakorn flood diversion tunnel is the shortcut tunnel to divert the flood water in rainy season into the Choapraya river. The tunnel was bored by means of EPB shield tunnelling in very stiff silty clay layer at about 20-24 m in depth. During flood diversion tunnel bored underneath the existing Bangkok main water supply tunnel and pile foundation of the bridge, instrumentation was monitored and compared with predicted FEM analysis. The prevention risk potential by means of predicting damage assessment is also presented and discussed.

  • PDF

한반도 기후 변화에 따른 수해 및 빗물 저류터널(Flood Drainage Tunnel) 건설의 세계 동향 검토 연구

  • Choe, Jae-Hwa;Ji, Wang-Ryul
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.14 no.2
    • /
    • pp.31-37
    • /
    • 2012
  • In the circumstances being continuous the unusual weather in the world, the city of Seoul has been devastating flood damage in July 2011, because of the heavy rainfalls. Along with expensive repairs to property, thousands of flood victims occurred; it is difficult to estimate the direct and indirect economic damages in city. Recently, as a part of the flood protecting measures, there are being discussed about the deep underground flood drainage tunnel, underground regulating reservoirs, permeable pavement, infiltration facility, river improvements, diversion channel, sewer pipe and ditch improvement and so on. Therefore, it is useful to make the plan of flood protecting measures more and more cost-effective and rational methods by considering the similar flood measures and constructions in the mega cities like Seoul.

  • PDF

SHIHMEN SEDIMENT PREVENTION DIVERSION TUNNEL PLANNING AND DESIGN

  • Ho-Shong Hou;Ming-Shun Lee;Percy Hou
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.168-172
    • /
    • 2009
  • Shihmen reservoir was started in May 1963. The main purposes of Shihmen reservoir are for agriculture, power supply, flood control and tourism. Shihme Asn dam is an earth dam. Its crown height is 133m above mean sea level, with length 360 m, watershed 763.4 km2, and maximum volume 309 million cms. Turbidity in Shihmen dam was severely affected by typhoons Aere (2004) and Masa (2005). Increased deposition after Aere was 28 million cms. Turbidity at Shihmen Canal Inlet is 3000 NTU (Nephelometry Turbidity Unit). Sediment sluicing strategies for downstream channel are demanded. Therefore, diversionary sediment preventing channel is planned in the upstream of Shihmen reservoir. Finally, turbid flow in tunnel channel is bypassed and diverted its flow down to downstream.

  • PDF

Failure Probability Analysis of Concrete Cofferdam Considering the Overflow in Flood Season (홍수시 월류를 고려한 콘크리트 가물막이댐의 파괴확률 산정)

  • Hong, Won Pyo;Song, Chang Geun
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.5
    • /
    • pp.30-38
    • /
    • 2020
  • In order to construct a dam, the diversion facility such as cofferdam and a diversion tunnel should be installed in advance. And size of a cofferdam depends on type of a main dam. According to the Korea Dam Design Standard, if the main dam is a concrete dam, design flood of the cofferdam is 1~2 years flood frequency. This means that overflow of the cofferdam occurs one time for 1 or 2 years, therefore, stability of the cofferdam should be secured against any overflow problem. In this study, failure probability analysis for the concrete cofferdam is performed considering the overflow. First of all, limit state function of the concrete cofferdam is defined for overturning, sliding and base pressure, and upstream water levels are set as El. 501 m, El. 503 m, El. 505 m, El. 507 m. Also, after literature investigation research, probabilistic characteristics of various random variables are determined, the failure probability of the concrete cofferdam is calculated using the Monte Carlo Simulation. As a result of the analysis, when the upstream water level rises, it means overflow, the failure probability increases rapidly. In particular, the failure probability is largest in case of flood loading condition. It is considered that the high upstream water level causes increase of the upstream water pressure and the uplift pressure on the foundation. In addition, among the overturning, the sliding and the base pressure, the overturing is the major cause for the cofferdam failure considering the overflow.

Study on Potential Water Resources of Andong-Imha Dam by Diversion Tunnel (안동-임하 연결도수로 설치에 따른 가용 수자원량에 관한 연구)

  • Choo, Yeon Moon;Jee, Hong Kee;Kwon, Ki Dae;Kim, Chul Young
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.1126-1139
    • /
    • 2014
  • World is experiencing abnormal weather caused by urbanization and industrialization increasing greenhouse gas and one of these phenomenon domestically happening is flood and drought. The increase of green-house gases is due to urbanization and industrialization acceleration which are causing abnormal climate changes such as the El Nino and a La Nina phenomenon. It is expected that there will be many difficulties in water management, especially considering the topography and seasonal circumstances in Korea. Unlike in the past, a variety of water conservation initiatives have been undertaken like the river-management flow and water capacity expansion projects. To meet the increasing demand for water resources, new environmentally-friendly small and medium-sized dams have been built. Therefore, the development of a new paradigm for water resources management is essential. This study shows that additional security is needed for potential water resources through diversion tunnels and is very important to consider for future water supplies and situations. Using RCP 6.0 and RCP 8.5 in representative concentration pathway climate change scenario, specific hydrologic data of study basin was produced to analyze past observed basin rainfall tendency which showed both scenario 5%~9% range increase in rainfall. Through sensitivity analysis using objective function, population in highest goodness was 1000 and cross rate was 80%. In conclusion, it is expected that the results from this study will help to make long-term and stable water supply plans by using the potential water resource evaluation model which was applied in this study.