• Title/Summary/Keyword: field test construction

Search Result 1,341, Processing Time 0.028 seconds

Improvement of the PVC Window Frame Installation Method Integrated with Gangform and Field Applicability Analysis

  • Choi, Hyo-Sung;Lee, Jeong-Ho;Yoo, Huyn-Seok;Kim, Young-Suk;Han, Seung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.482-500
    • /
    • 2011
  • In apartment housing construction, window frame installation work, which is conducted after the structural framework, is very important, because its completion time directly affects the starting time of successive interior finishing works, as well as the overall construction period. Construction delays in interior finishing works might occur due to problems inherent to the conventional window frame installation method, such as the poor verticality of window frames, and the water leakage around them. The primary objective of this study is to analyze the problems of a 'Gangform integrated PVC window frame pre-installation method' based on its pilot test results. Next, this study proposes an improved conceptual model that enables the end users to enhance the field applicability of this method in terms of productivity, time, and cost. The field applicability of the proposed 'Gangform integrated PVC window frame pre-installation method' was also verified through a survey.

Engineering Characteristics Assessment of Rapid Set Controlled Low Strength Material for Sewer Pipe Using Excavated Soil (굴착토를 활용한 속경성 유동성 채움재의 공학적 특성 평가)

  • Kim, Young-Wook;Lee, Bong-Chun;Jung, Sang-Hwa
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.8 no.4
    • /
    • pp.450-457
    • /
    • 2020
  • In this study, engineering characteristics such as flowability, segregation and compressive strength by age to derive fast hardening material mixing proportion using excavated soil. And based on optimal mixing proportion, field simulation experiment conducted in laboratory to examine the effectiveness of the method such as kelly ball drop test and soil penetration test for reviewing the following process. As as a result of evaluation, in case of kelly ball drop test and soil penetration test were securing the following process initiation time 3 hours after place CLSM. As results of these assessments, kelly ball drop test and soil penetration test were applicable for revewing following process in construction field besides unconfined compressive strength method.

Studies on the Evaluation Method of Strength Comparison for Application in Joint Separation Test Body to Structural Concrete (구조체 콘크리트에 접합분리 시험체의 적용을 위한 강도비교에 관한 실험적 연구)

  • Kim, Seong-Deok;Lee, Seon-Ho;Jung, Kwang-sik;Paik, Min-su;Lee, Young-Do;Jung, Sang-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.79-82
    • /
    • 2008
  • It has been reported that destruction test by core collection is the most reliable of the structural concrete strength in present building construction field. But it causes low efficiency by damage and cutting in structure due to the core collection. It also has some problems in repairing. Additionally in case of strength test with management specimen, different environment compared to the structure environment cause problems about estimation precise structure strength. Therefore, it is required to develop structure direct strength test that has test values and credibility above the ones obtained by core specimen collection strength test and seasonal specimen test to suggest a reasonable and practical management method of structural concrete.

  • PDF

Design and Construction of Test Field for Low Voltage Under Cable Fault Location Detection (저압 지중케이블 고장 위치 검출 실증 시험장 설계 및 구축)

  • Oh, Hun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.6666-6672
    • /
    • 2015
  • Various reflectometry methods to locate power cable fault have been studied. But, most related studies has been verifying by simulation and laboratory test and study in conditions similar with real cable fault filed was not performed due to the absence of cable fault test field. Therefore, this paper design and construct test field for the standardized performance test and the operating education of cable fault location equipments. In the constructed test, open, short, half open and poor contact fault at 100m, 200m location of cable was produced and 1km cable role was installed for maximum distance measurement test. The test field will be used in the development and standardization of cable fault location technology, and te performance evaluation and certificate test of the related equipments.

Accelerated Weathering Test of Urethane Paint for Heavy Construction Equipment (중장비용 우레탄 도료 내후성 가속시험)

  • 김대용;김영준
    • Journal of Applied Reliability
    • /
    • v.1 no.2
    • /
    • pp.79-93
    • /
    • 2001
  • Recently, new aspects of paints such as a beautiful appearance, use of environmentally friendly paints, etc., in addition to the superior performance of paints have been requested for industrial paints including the paints for heavy construction equipment and others. Particularly, the quality of appearance of coating affects the sales of heavy construction equipment. And the necessity for the paints to have a superior weather-proof property without changing the luster or color even after long-time exposure to the open air is emphasized. The change in the surface color and luster of the paint due to the natural environment progresses very slowly, and it takes a long time to verify material properties when developing new paints. In order to improve such methods, weathering tests are performed in many laboratories as a test for accelerating aging of coating, and the lifetime of the products is estimated through evaluation of the weathering (environment-proof) quality of paints. However, not a great deal of research activity has been conducted up to the present time since the interrelationship between the actual results of testing and field data is different for each paint and it takes a long time to study relevant materials. Therefore, introduced in the present study is the estimation of the change in the quality of appearance of coating in the field through the accelerated aging test among the cases of improvement of the quality of appearance of the urethane paint for heavy construction equipment.

  • PDF

Compound Loss Function of semantic segmentation models for imbalanced construction data

  • Chern, Wei-Chih;Kim, Hongjo;Asari, Vijayan;Nguyen, Tam
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.808-813
    • /
    • 2022
  • This study presents the problems of data imbalance, varying difficulties across target objects, and small objects in construction object segmentation for far-field monitoring and utilize compound loss functions to address it. Construction site scenes of assembling scaffolds were analyzed to test the effectiveness of compound loss functions for five construction object classes---workers, hardhats, harnesses, straps, hooks. The challenging problem was mitigated by employing a focal and Jaccard loss terms in the original loss function of LinkNet segmentation model. The findings indicates the importance of the loss function design for model performance on construction site scenes for far-field monitoring.

  • PDF

The Parametric Study on the Performance Characteristics of Elastic Rail Fastening System on the Sharp Curved Track (급곡선 탄성레일체결장치의 거동특성에 미치는 매개변수 연구)

  • Baik, Chan-Ho;Joo, Bong-Gyu;Choi, Jung-Youl;Choi, Il-Yoon;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2163-2173
    • /
    • 2011
  • In this study, the deformations and stresses occurred in the elastic rail fastening system were evaluated according to applied extreme track forces based on various field conditions, track curvature and poor properties. The purpose of this study is to establish a method for efficient management and suggest guide line for track construction in order to secure the performance quality of the elastic rail fastening system on the sharp curved track.. Therefore, initial construction qualities of rail and concrete bed, initial clamping force and applied extreme track forces were used into experiment as several parameters. Using these test results, the performance characteristics of the elastic rail fastening system were also evaluated. As a result, it suggested the method to secure long-term durability of fastening system and comparing sharp curved track to results on field test.

  • PDF

An Investigation of Breakwater Stability by Centrifuge Model Tests (원심모형실험을 이용한 방파제의 안정성 검토)

  • Yoo, Nam-Jae;Hong, Young-Gil;Kim, Dong-Gun
    • Journal of Industrial Technology
    • /
    • v.32 no.A
    • /
    • pp.79-86
    • /
    • 2012
  • In this paper, centrifuge model tests and numerical analysis on the breakwater structure were performed to investigate the stability and behavior of breakwater in field. In centrifuge model tests, construction sequence of breakwater structure such as preparation of weathered rock and sand deposit, construction of D.C.M, rubble mound with crushed stones and installment of breakwater structure was reconstructed like field condition and the behavior of ground settlement and breakwater displacement during stage of construction was observed during tests. For the final stage of simulating the horizontal movement of breakwater due to wave force, horizontal load was applied by horizontal loading apparatus being specially designed so that horizontal displacement of structure could be observed. Numerical analysis were also carried out and its results were compared with test results to assess the property of centrifuge model tests with respect to the behavior of structure as well as ground.

  • PDF

A Study on the Evaluation of Workability from the Application in Construction Site for Watertightness Concrete used in Anti-Crack Agent (규불화염계 균열저감제가 첨가된 수밀콘크리트의 지하구조물 기초바닥 현장적용 특성)

  • Song Jung Hoon;Jeon Esther;Kim Sun Woo;Kim Do Soo;Kil Bae Soo;Yun Hyun Do
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.11a
    • /
    • pp.569-572
    • /
    • 2004
  • This study was performed to investigate evaluation of workability from the application in construction site for watertightness concrete used in anti-crack agent. This study compares plain concrete test with field test was carried out at mat foundation(thickness a.8m) of newly constructed apartments of Noen Dong. Conducted tests show that the anti-crack agent was effective to progress compressive strength and control the crack and durability in a construction field.

  • PDF

Field test and research on shield cutting pile penetrating cement soil single pile composite foundation

  • Ma, Shi-ju;Li, Ming-yu;Guo, Yuan-cheng;Safaei, Babak
    • Geomechanics and Engineering
    • /
    • v.23 no.6
    • /
    • pp.513-521
    • /
    • 2020
  • In this paper, due to the need for cutting cement-soil group pile composite foundation under the 7-story masonry structure of Zhenghe District and the shield tunnel of Zhengzhou Metro Line 5, a field test was conducted to directly cut cement-soil single pile composite foundation with diameter Ф=500 mm. Research results showed that the load transfer mechanism of composite foundation was not changed before and after shield tunnel cut the pile, and pile body and the soil between piles was still responsible for overburden load. The construction disturbance of shield cutting pile is a complicated mechanical process. The load carried by the original pile body was affected by the disturbance effect of pile cutting construction. Also, the fraction of the load carried by the original pile body was transferred to the soil between the piles and therefore, the bearing capacity of composite foundation was not decreased. Only the fractions of the load carried by pile and the soil between piles were distributed. On-site monitoring results showed that the settlement of pressure-bearing plates produced during shield cutting stage accounted for about 7% of total settlement. After the completion of pile cutting, the settlements of bearing plates generated by shield machine during residual pile composite foundation stage and shield machine tail were far away from residual pile composite foundation stage which accounted for about 15% and 74% of total settlement, respectively. In order to reduce the impact of shield cutting pile construction on the settlement of upper composite foundation, it was recommended to take measures such as optimization of shield construction parameters, radial grouting reinforcement and "clay shock" grouting within the disturbance range of shield cutting pile construction. Before pile cutting, the pile-soil stress ratio n of composite foundation was 2.437. After the shield cut pile is completed, the soil around the lining structure is gradually consolidated and reshaped, and residual pile composite foundation reaches a new state of force balance. This was because the condensation of grouting layer could increase the resistance of remaining pile end and friction resistance of the side of the pile.