• Title/Summary/Keyword: feeder line

Search Result 183, Processing Time 0.027 seconds

A Study on the Design of Dual-Band Small Pacth Antenna using T-shaped Feeder and Spiral Structure (T자형 급전선과 스파이럴구조를 이용한 이중대역 소형패치 안테나 설계에 관한 연구)

  • Lee, Yun-Min;Shin, Jin-Seob
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.4
    • /
    • pp.35-40
    • /
    • 2022
  • This paper proposes an antenna that is located outside the PCB substrate of an electronic product to enable wireless communication in the ISM band. The PCB designed the T-shaped OPEN-STUB power supply line to be miniaturized so that it does not interfere with parts or interfere with design. The characteristics of the antenna were confirmed in the 2.4GHz and 5.8GHz bands using a T-shaped stub feeder and a spiral structure. The size of the antenna is 5mm in width × 6.5mm in length, and the thickness of the PCB is 1.2T. As a result of measurement of the manufactured antenna, it was possible to obtain a return loss of -10dB or more at 2.4GHz and 5.8GHz. In the E-plane, the gain was -4.45 dBi, and in the H-plane, the gain was -1.05 dBi. Therefore, the proposed small antenna for wireless communication showed excellent performance.

The Influence on Traction Return Current by Pantograph Detachment Frequency of High-speed Train (고속철도차량의 이선빈도가 귀선전류에 미치는 영향)

  • Lee, Sung-Gyen;Cho, Young-Maan;Ko, Kwang-Cheol
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.9
    • /
    • pp.8-13
    • /
    • 2014
  • Currently it is major problem of electric railway with increasing drive speed such as the arc generated by the pantograph detachment and the distortion current in the motor-block high speed switching. When physical contact between the pantograph and the catenary line is separated, the pantograph detachment arcing occurs and it makes up the conductive noise to the return feeder. We made the EMTP modeling of the railway traction system and the pantograph arc by circuit elements and switches. The influence of pantograph detachment frequency is investigated by changing some frequencies. The over-current occurs in each detachment and it oscillates some time at beginning and stabilizes gradually. The magnitude of over-current is decided by instantaneous value of existing traction return current. If the detachment occurs at a point of peak value or distortion current, the over-current will be more harmful to the power systems connected with the return feeder and will become to arise with increasing detachment frequency.

A Study on the TRV(BTF) of Circuit Breakers According to Install Current Limit Reactors (345kV 고장전류 저감을 위한 한류리액터 설치시 차단기 TRV(모선 고장시) 검토)

  • Kwak, J.S.;Park, H.S.;Shim, E.B.;Ryu, H.Y.;Lee, B.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.368-370
    • /
    • 2005
  • Due to the tendency towards large capacity and complexity of power system, an enhancement of power system equipment make a system impedance to be low in power system. Generally if an equivalent impedance of system becomes lower, a system stability will be better. But the fault current becomes very larger. The 345kV ultra-high voltage system will use current limit reactors(CLR) in a transmission line or a bus in substation to limit the magnitude of fault current. The CLR makes a significant contribution to the severity of the transient recovery voltage(TRV) experienced by feeder and bus circuit breakers on clearing feeder faults. Based on the conclusions of an investigation of actual circuit breaker failures while performing this duty, the mitigation of the transient recovery voltage associated with the reactors is described. Therefore in this article we simulated the TRV by EMTP at Bus Terminal Fault.

  • PDF

A Study on Causes and Measures Against Occurrence of Circulating Current in catenary (전차선로 순환전류 발생원인과 대책에 관한 연구)

  • Han, Hag-Su;Min, Kyung-Yun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.816-823
    • /
    • 2007
  • Electric car tract plays the role of supply high electric power to the electric car from the substation by using Pantograph of the electric car. It is always exposed to the external atmosphere, which results in quite substantial fluctuations in current and voltage during operation of electric car. This generates possibility of occurrence of accident at all times. Since range of wiring metallic globe installed on the catenary cannot achieve complete electrical contact, accidents are occurring due to circulating current caused by arc caused by incomplete contact due to occurrence of hairline fracture of Pantograph due to pressure or vibration of wiring. Furthermore, rapid increase in the operational current due to increase in the operational frequency of the electric car is causing erosion and short circuit of the metallic globe at the contact points. This study on arc is generated as current transmitted out of the substation courses through power line or wiring metallic globe other than the main circuit as the current is being collected at the electric car through feeder and feeder divergence device. Accordingly, since heat generated by the arc becomes the cause for generation of circulating current due to melting of metal or softening of metal due to increase in temperature accompanying increase in contact resistance, this research shall describe causes and measures against occurrence of circulation current.

  • PDF

A case study on the increasing load capacity of AT Feeder system with speed-up train (고속열차 투입에 따른 AT급전계통의 부하용량증가에 관한 사례연구)

  • Na, Youn-Il;Han, Seong-Ho
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.694-698
    • /
    • 2005
  • The operation speed improvement of the train in electric railway must pursue continuously and need the investigation of whole railway system whole. The high-speed of the train is related to not only vehicle technique but also the infrastructure, signal system, operation technique, the trolley line and catenary, economical efficiency. Specially, in case of electric railway, we have to consider a technical investigation which is current collection efficiency improvement, voltage drop countermeasure, equipment capacity, track force, signal system. In this paper, we presents the technical investigation of AT feeder system in order to achieve high speed train in exist real railroad. We proved this approach which will use the whole domestic lines in the future.

  • PDF

Modeling of Liquid Entrainment and Vapor Pull-Through in Header-Feeder Pipes of CANDU

  • Cho Yong Jin;Jeun Gyoo Dong
    • Nuclear Engineering and Technology
    • /
    • v.36 no.2
    • /
    • pp.142-152
    • /
    • 2004
  • The liquid entrainment and vapor pull-through offtake model of RELAP5/MOD3 had been developed for SBLOCA (Small Break Loss of Coolant Accident). The RELAP5/MOD3 model for horizontal volumes accounts for the phase separation phenomena and computes the flux of mass and energy through a branch when stratified conditions occur in the horizontal pipe. In the case of CANDU reactor, this model should be used in the coolant flow of 95 feeders connected to the reactor header component under the horizontal stratification in header. The current RELAP5 model can treat the only 3 directions junctions; vertical upward, downward, and side oriented junctions, and thus improvements for the liquid entrainment and vapor pull-through model were needed for considering the exact angles. The RELAP5 off-take model was modified and generalized by considering the geometric effect of branching angles. Based on the previous experimental results, the critical height correlation was reconstructed by use of the branch line connection angle and validation analyses were also performed using SET. The new model can be applied to vertical upward, downward and angled branch, and the accuracy of the new correlations is more improved than that of RELAP5.

Estimation of Harmonics on Power System of AC Electric Railway (교류 전기철도 전력계통의 고조파 예측량 계산)

  • 송진호;황유모
    • The Transactions of the Korean Institute of Electrical Engineers B
    • /
    • v.52 no.2
    • /
    • pp.68-79
    • /
    • 2003
  • We estimated harmonics on power system of AC railway based on quantitatively measured harmonics and investigated the need of facilities for harmonics reduction. In order to analysis harmonics which inflow into power system due to increase in collector voltages and harmonic currents generated from the train when the railway is in operation, the railway system Is sectioned into power supply, railway line, AT, sectioning Post and subsectioning post. For analysis of extension of currents resulting from the railway loads, PWM converter, VVVF inverter and the feeder system are modeled based on the dynamic node technique(DNT). In order to test the usefulness of the DNT for analysis of harmonic effects, the measured harmonic currents and harmonic magnification ratios at the S/K substation are compared with simulation results using DNT modelling, which include the results for two cases with and without filters for suppression of harmonic currents. When 8 cars(4M4T) are in operation, the total sum of harmonic currents resulting from the train at M and T phases, which inflow into the substation along with the railway line, is calculated. Using the harmonics analysis program for railway feeder system with these data, the total harmonic distortion factor(710) at the outgoing point of KEPCO substation is computed. The calculation shows that when the maximum THD at the receiving point of H/K substation was 0.0443% which is much lower than 1.5% which is the allowable value of KEPCO at 154kV as well as IEEE-519 above 132kV This result indicates that any measure for harmonics reduction in Incheon International Airport Railway is not needed.

Development of Common PCS Base Station System (PCS 공용 기지국 시스템 개발)

  • 황선호;박준현;김훈석
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2001.05a
    • /
    • pp.214-217
    • /
    • 2001
  • This paper presents an implementation methodology of common Rf- integrated PCS base station system which, is capable of providing PCS services for 3 PCS carriers concurrently and wireless system performance evaluation data is shown. We have built up a common PCS base station system using a commonization module, which is consisted of a multi-channel combiner, duplexer, LNA, power divider, feeder line, and a common set of antennas. It was shown that the performance of the system within the total 30MHz PCS frequency range is uniformly acceptable and measured signal quality and coverage are equivalent to that of the individual PCS base station. It is expected that PCS carriers are able to save a huge amount of installation and maintenance expenses by installing and sharing this base station system. This paper forms a groundwork for deploying efficient and economical IMT-2000 network.

  • PDF

Integer Programming Approach to Line Optimization of Multiple Surface Mounters (정수계획법에 의한 다수 표면실장기의 라인 최적화)

  • Kim Kyung-Min;Park Tae-Hyoung
    • The Journal of the Korea Contents Association
    • /
    • v.6 no.4
    • /
    • pp.46-54
    • /
    • 2006
  • We propose an optimization method for PCB assembly lines including multiple surface mounters. To increase the productivity of PCB assembly line, the component allocation, feeder assignment, and assembly sequence of each surface mounter should be optimized. The optimization Problem is formulated as an integer programming problem. We divide the overall problem into two hierarchical sub-problems: forward-path problem and backward-path problem. The clustering algorithm and branch-and-bound algorithm are applied to solve the forward-path problem. The assignment algorithm and connection algorithm are applied to solve the backward-path problem. Simulation results are presented to verify the usefulness of the proposed method.

  • PDF

Experimental Verification of Induction Phenomenon on Telecommunication Lines by Applying Its Occurrence Mechanisms Using an Artificial ELF Source Generator

  • Lee, Sang-Mu;Gimm, Yoon-Myoung;Eun, Chang-Soo
    • Journal of electromagnetic engineering and science
    • /
    • v.10 no.4
    • /
    • pp.276-281
    • /
    • 2010
  • In this paper, an electromagnetic induction on a telecommunication line by the distribution line of a power provision system or a feeder line of an electrified railway system has been verified through experiments. The basic cause of induction occurrence by these practical power provision systems is the returning current through the earth. This principle has been confirmed by the experiments documented in this paper which implemented these mechanisms to incur an induction. Experimental methods were used to produce the returning current through the earth. The experiment to find a relationship between inducing strength and the distance between the two phase lines in a power provision line has also been included to confirm that, when the distance is enlarged, the induction effect increases as the cross-nullification effect of magnetic fluxes decreases. An experiment for the existence of a shielding effect by another conduction length material has been addedas a protection measure against the induction.