• Title/Summary/Keyword: failure period

Search Result 1,397, Processing Time 0.028 seconds

Optimization of Cost and Downtime for Periodic PM Model Following the Expiration of Warranty

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.19 no.2
    • /
    • pp.587-596
    • /
    • 2008
  • This paper develops the optimal periodic preventive maintenance policies following the expiration of warranty: renewing warranty and non-renewing warranty. After the warranty period is expired, the system undergoes the PM periodically and is minimally repaired at each failure between two successive PMs. Firstly, we determine the expected cost rate per unit time and the expected downtime per unit time for the periodic PM model. Then the overall value function suggested by Jiang and Ji(2002) is applied to obtain the optimal PM period and the optimal PM number. Finally, the numerical examples are presented for illustrative purpose.

  • PDF

Complete Sternal Cleft (완전 흉골열 - 1례 보고 -)

  • 신제균
    • Journal of Chest Surgery
    • /
    • v.32 no.10
    • /
    • pp.966-969
    • /
    • 1999
  • Congenital defects of the sternum are rare development anomalies. They result form the failure of the lateral sternal bars to fuse. This malformation may be associated with other ventral midline fusion defects and ectopia cordis. A complete sternal cleft is the rarest form and less than 10 cases have been reported in the medical literature. Here were report a 3-day-old boy with complete sternal cleft without other malformations, who underwent primary surgical repair. Surgical correction of complete sternal cleft should be performed in neonatal period whether the infant if symptomatic or not because it is usually simple, able to achieve good result and primary repair is usually feasible at this period.

  • PDF

Optimal Burn-In under Warranty

  • Kim, Kuinam-J;Park, Chi-Yeon
    • Journal of the Korea Safety Management & Science
    • /
    • v.1 no.1
    • /
    • pp.135-143
    • /
    • 1999
  • This paper discusses an optimal burn-in procedure to minimize total costs based on the assumption that the failure rate pattern follows a bimodal mixed Weibull distribution. The procedure will consider warranty period as a factor of the total expected bum-in cost. A cost model is formulated to find the optimal burn-in time that minimizes the expected burn-in cost. Conditional reliability for warranty period will be discussed. An illustrative example is included to show how to use the cost model in practice.

  • PDF

Optimal Burn-In under Waranty

  • Kim, Kui-Nam;Lee, Kwang-Ho
    • Communications for Statistical Applications and Methods
    • /
    • v.6 no.3
    • /
    • pp.719-728
    • /
    • 1999
  • This paper discusses an optimal burn-in procedure to minimize total costs based on the assumption that the failure rate pattern follows a bimodal mixed Weibull distribution. The procedure will consider warranty period as a factor of the total expected burn-in cost. A cost model is formulated to find the optimal burn-in time that minimizes the expected burn-in cost. Conditional reliability for warranty period will be discussed. An illustrative example is included to show how to use the cost model in prctice.

  • PDF

The Failure of Initial Treatment for TNM Stage I & II Squamous Cell Carcinomas of the Oral Cavity (조기(TNM Stage I & II) 구강 편평세포암종의 초치료 실패)

  • Lee Hyun-Seok;Jeong Han-Sin;Kim Tae-Wook;Son Young-Ik;Baek Chung-Hwan
    • Korean Journal of Head & Neck Oncology
    • /
    • v.21 no.1
    • /
    • pp.26-31
    • /
    • 2005
  • Backgrounds and Objectives: Squamous cell carcinomas of the oral cavity(SCOC) in TNM stage I & II have relatively high chance to be cured compared to those in the advanced stage, but sometimes result in the treatment failure with poor prognosis. There have been few reports on the patterns of failure and the clinical courses for SCOC in stage I & II after the failure of initial treatment. This study is directed at identifying the clinical outcomes of stage I & II SCOC and the salvage rate after initial treatment and suggesting an optimal level of treatment by analyzing the patterns of failure. Material and Methods: The medical records of 36 patients with SCOC, initially diagnosed between 1995 and 2001 as TNM stage I & II were reviewed retrospectively. The patterns of failure, salvage treatment, clinical courses, and the survival of these subjects were analyzed. The minimum follow-up period of no-evidence of disease(NED) was 12 months with an average of 32.2 months. Results: Overall rate of the treatment failure in SCOC of stage I & II was 41. 7%(15/36 cases). Most of the treatment failure in the subjects with stage I tumors occurred in regional lymph node. Local failure was the most frequent form of failure in the subjects with stage II tumors after wide excision of primary tumor with elective neck dissection and/or radiation therapy. No significant correlation was noted between the safety margin and the local failure. Elective neck dissections in stage I & II SCOC had a tendency to reduce regional failure (p=0.055). The salvage rates at 24 months were 85.7% in stage I, and 37.5% in stage II. The 3-year survival rate after the failure of initial treatment was 55.0%. Conclusion: SCOC of stage I & II after the failure of initial treatment showed poor prognosis despite of the salvage treatments. This study implies that the elective neck dissections for regional lymph node should be required for SCOC of stage I & II to reduce the treatment failure.

Factors Affecting Patency Rate in Microvascular Anastomosis of the Femoral Artery in Rat (쥐 대퇴 동맥의 미세 문합시 개존성에 영향을 미치는 인자)

  • Lee, Jun-Mo;Seo, Kyu-Bum
    • Archives of Reconstructive Microsurgery
    • /
    • v.11 no.1
    • /
    • pp.63-66
    • /
    • 2002
  • Microvascular anastomosis is too important to reduce the failure in operating room because of no choice in case of failure and prognosis of the failure would be more worse than any other success ones. Factors for microsurgery trainee influencing patency in microvascular anastomosis at the laboratory are numerous but three basic prerequisites are magnification, instruments and suture material and training. First Author trained microsurgical technique to the second author using femoral artery of the rat and patency of the anastomosis was evaluated by the milking test. Period which microsurgeon successes femoral arterial anastomosis in rat in both of 5 and 30 minutes was 7th week at the laboratory which has done 2 vessels a week under the supervise of the skilled first author.

  • PDF

Optimal Age Replacement Policy for a Repairable System with Increasing Minimal Repair Times at Failure (수리시간이 증가하는 수리가능한 시스템에서의 최적 교체시간의 결정)

  • 차지환;이강현;김재주
    • Journal of Korean Society for Quality Management
    • /
    • v.28 no.3
    • /
    • pp.53-58
    • /
    • 2000
  • In many cases, it is more practical and economical to repair a system than to replace the whole system or to perform a complete overhaul when it fails. The age replacement policy with minimal repair at failure is considered. The system is replaced every time its age reaches at $T_0$. For each intervening failure only minimal repair is done. The minimal repair times in a renewal period are increasing in the sense that the minimal repair times constitute a strictly increasing geometric process. The long-run expected cost rate Is obtained and the properties of the existence and the uniqueness of the optimal policy minimizing the long-run expected cost rate are derived.

  • PDF

Cost Optimizing Burn-in Time Determination (비용을 극소화하는 최적 번인시간 결정)

  • Lee, Sang-Yong;Park, Hae-Geun
    • Journal of Korean Society for Quality Management
    • /
    • v.21 no.2
    • /
    • pp.102-108
    • /
    • 1993
  • The purpose of burn-in is to eliminate the early failures of the products before they are delivered for customer use. Therefore burn-in should he continued until one is reasonally sure that all the weak items have failed, thus leaving the remaining items in a healthy state of reliability. From this point of view, burn-in time dependent costs such as a cost per product per burn-in time, and cost of repair of the product per failure occurred during burn-in time will he increased. Conversely, the cost of field repair of the product per failure occurred during the guarantee period will be decreased since the early failure of the product is fully eliminated during burn-in. Hence, this paper intend to determine optimal burn-in time which minimize the total of above costs associated with burn-in.

  • PDF

Mechanical Behavior and Cracking Characteristics of Tunnel Lining by Model Experiment (모형 실험에 의한 터널 복공의 역학적 거동 및 균열 특성에 관한 연구)

  • 이대혁;김영근;이희근
    • Tunnel and Underground Space
    • /
    • v.8 no.1
    • /
    • pp.53-66
    • /
    • 1998
  • Considering the mechanical cracking in the concrete lining of tunnels occurring in relatively short period of time after the construction, there is a need for the study on the mechanical behavior and the cracking characteristics of double lining support system(shotcrete and concrete lining). For the proposed study, downscaled lining models of Kyung-Bu High Speed Railway tunnels were tested. Most longitudinal cracks at about 93 percentage developed within 30 arch degree from the vault. Cracking load was about 30 percentage of the failure load and the deflection under the cracking load was 10 percentage of the deflection under the failure load. The overbreak around the vault contributed to the reduction of the capacity for cracking and failure by the percentage greater than the reduced effective depth. Of several rock block types considered in this research, the triangular block was the most critical, and the right triangular block under eccentric load was secondly critical for the stability of the tunnel lining system. The dimensionless support reaction curves were derived from the experimental results for single and double lining. The general equation to compute the designed flexural moment was modified.

  • PDF

Optimal Preventive Maintenance Policy for a Repairable System (수리 가능한 시스템에서의 최적 예방 보전 정책)

  • Ji Hwan Cha;Jong Tae Jung;Jae Joo Kim
    • Journal of Korean Society for Quality Management
    • /
    • v.29 no.2
    • /
    • pp.46-53
    • /
    • 2001
  • In this paper, a preventive maintenance(PM) policy for a repairable system is considered. The failure rate model proposed by Park et at.(2000) is generalized by assuming that after each PM not only the PM slows down the degradation process of the system but also reduces down the system failure rate by a certain fixed amount. Long-run expected cost rate of the PM policy is derived and the properties of joint solution of the optimal PM period and optimal number of PM which minimizes the expected cost rate are obtained. Numerical examples for the case of a Weibull-type failure rate are given.

  • PDF