• Title/Summary/Keyword: expected total cost

Search Result 428, Processing Time 0.028 seconds

Study on the Application of V2G for Electric Vehicles in Korea Using Total Cost of Ownership Analysis (총소유비용 분석을 이용한 전기차의 V2G 도입에 대한 연구)

  • Kim, Younghwan;Lee, Jae-Seung
    • Journal of Energy Engineering
    • /
    • v.24 no.2
    • /
    • pp.129-143
    • /
    • 2015
  • Increasing concerns on climate change and energy security accelerated policies to reduce green-house gas emission, especially from the transportation sector. Electric vehicle (EV) has been on the spotlight to deal with such environmental issue and V2G (Vehicle-to-Grid) technology began to draw attentions as an alternative to reduce ownership costs while contributing to an efficient and decentralized power grid. This study conducts a scenario analysis on total cost of ownership of EV under V2G scheme and compare with non-V2G EV and Internal Combustion Engine (ICE) vehicle. As result, V2G service is expected to provide an annual average profit of $210 to EV users willing to reverse flow its residual power in the battery. The profit from V2G service leaves a margin of $4,530 over operational lifetime, compared with $2,420 cost of charge for non-V2G EV. In summary, total cost of ownership of V2G-capable EV was 6.2% less than non-V2G EV and 10.2% higher than ICE vehicle. The results confirm a comparative economic advantage of operating EV under V2G scheme. Increased number of EVs with V2G service has shown to provide positive effects to power industry for valley filling in load distribution, thus, favorably increasing the overall economic feasibility.

Conceptual Cost Estimation Model Using by a Parametric Method for High-speed Railroad (매개변수기법을 이용한 고속철도 노반공사의 개략공사비 예측모델)

  • Lee, Young Joo;Jang, Seong Yong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.4D
    • /
    • pp.595-601
    • /
    • 2011
  • There is currently applied to the unit cost per a distance (KRW/km) for estimating the conceptual cost of civil work on basic planning stage of high speed railroad. This unit cost is an arithmetic average value based on historical data, which could be in big error. It also is difficult to explain the deficiency comparing the estimated cost derived from next basic design stage. This study provides the conceptual estimation model using by the parametric method and regression analysis. Independent variables are the distance and the geological materials (earth, weathered rock, soft-rock, hard-rock), extracting from the actual data to 36 contracts. The deviation between the unit costs estimated using the developed model and the actual cost data is presented in the range from -0.4% to +31%. This range is acceptable compared the typical range "-30% to + 50%". This model will improve the accuracy of existing method and be expected to contribute to effective total cost management and the economic aspects, reduce the financial expenditure.

Research for Construction of Landfills at Sea Disposal of Wastes to be Reclaimed in the Metropolitan Area in the Future (폐기물 해상매립장의 도입방안에 관한 연구 - 장래 수도권 지역의 매립폐기물 처리를 중심으로 -)

  • 정공일;김영수
    • Journal of Korea Port Economic Association
    • /
    • v.17 no.1
    • /
    • pp.159-180
    • /
    • 2001
  • The quantity of waste has been increased due to the increase in population and consumption after industrialization. Accordingly it caused the urban environmental problems, the lack of landfill and the pollution around the landfill. Thus, it is necessary to research the adequate alternative in the long-term. In case of Japan, areas and quantities of landfills at sea are more great than those of landfills in land. And investigating our condition, landfills of the metropolitan area in land are to be fully filled with wastes up to 2020 and be closed. In this research, construction of landfill sites at sea is suggested as the alternative waste disposal method and it is suggested that in our country, the suitable landfill sites of the metropolitan area are the regions around Jangbong-do Island and Muei-do Island. It is expected that the best way to transport wastes is to transport through Kyungin canal from the middle collection center to the lower Han River. Rough cost for construction of landfill at sea, if it is used for 50 years, is expected to be 2 trillion won and total time to construct the landfill is expected to be 10 years. Many studies concerning to this research proposal are to be performed so that construction of landfills familiar to environment are to be accomplished.

  • PDF

Optimum Maintenance and Retrofit Planning for Reliable Seismic Performance of the Bridges (내진성능확보를 위한 교량의 최적유지보수계획법)

  • 고현무;이선영;박관순;김동석
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.6 no.5
    • /
    • pp.29-36
    • /
    • 2002
  • In the maintenance and retrofit planning of a bridge system, the optimal strategy for inspection and repair are suggested by minimizing the expected total life-cycle cost, which includes the initial cost, the costs of inspection, repair, and failure. Degradation of seismic performance is modeled by using a damage function. And failure probability is computed according to the degree of damage detection by random vibration theory and the event tree analysis. As an example to illustrate the proposed approach, a 10-span continuous bridge structure is used. The numerical results show that the optimum number of the inspection and the repair are increased, as the seismic intensity is increased and the soil condition of a site becomes more flexible.

Reliability Analysis Models for Maintenance of bridge structures (교량구조물의 유지관리를 위한 신뢰성 해석 모델)

  • Kim, Jong-Gil;Sohn, Yong-Woo;Lee, Cheung-Bin;Ahn, Young-Ki
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.3
    • /
    • pp.251-261
    • /
    • 2004
  • Recently, the corrosion and aging of bridge structures are of great concern impractical The uncertainties of the corroded reinforced bars in concrete influence not only the safety of the bridge structures, but also the flexural strength of reinforced concrete members. This paper considers these uncertainties by providing a reliability-based framework and show that the identification of the optimum maintenance scenario is a straightforward process. This is achieved by using a computer pro망am for Life Cycle Cost Analysis of Deteriorating Structures (LCCADS). This program can consider the effects of various types of actions on the reliability index profile of a deteriorating structures.

Economic Analysis of Reinforced Concrete Bridges Considering Performance Evalution (성능평가를 고려한 철근콘크리트교의 경제성 분석)

  • 손용우;정영채;김종길
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.17 no.2
    • /
    • pp.141-150
    • /
    • 2004
  • Recently, it is really concerned about corrosion and aging of reinforced concrete bridges. Corrosional steel reinforcing in concrete affects not only safety of bridges structure but also bending strength of reinforced concrete's member. Rate of corrosion, characteristic of bending strength, and economical evaluation aren't clear in reinforced concrete, considering performance evaluation. The purpose of study is as follows. It studies about ability of resistance's strength and cost of life cycle according to reduction of steel reinforcing's corrosion. Moreover, it shows calculating formula of bending strength with corrosion of current rate and exactly evaluates about the rest life at corrosional reinforced concrete bridges.

A Study on a Preventive Replacement Model by the Dynamic Programming Method (동적 계획법에 의한 예방교체모형에 관한 연구)

  • 조재립;황의철
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.10 no.16
    • /
    • pp.75-80
    • /
    • 1987
  • This paper is deals with the preventive replacement for the equipment which fails only when the total amount of damage reaches a prespecified failure level. Most of replacement model use time as their decision variable, but it is not appropriate for the cases in which failures dependent on their cumulative damage levels. In this paper, a new type preventive replacement model is introduced in which an equipment is replaced before failure when the cumulative damage reaches a certain level or replaced on failure, whichever occures first. The optimal replacement damage levels which minimize total expected cost are obtained by the Dynamic programming Method when the number of use of the equipment is finite. A numerical example is also presented. The optimal preventive replacement policy when the equipment will be used for a finite time span is also discussed.

  • PDF

Analysis of GHG Reduction Scenarios on Building using the LEAP Model - Seoul Main Customs Building Demonstration Project - (LEAP 모형을 이용한 건축물의 온실가스 감축 시나리오 분석 - 서울세관건물 그린리모델링 시범사업을 중심으로 -)

  • Yoon, Young Joong;Kim, Min Wook;Han, Jun;Jeon, Eui Chan
    • Journal of Climate Change Research
    • /
    • v.7 no.3
    • /
    • pp.341-349
    • /
    • 2016
  • This study is intended to set a greenhouse gas emission scenario based on green remodeling pilot project (Annex building of Seoul Customs Office) using LEAP model, a long-term energy plan analysis model, to calculate the energy saving and greenhouse gas emission till year 2035 as well as to analyze the effect of electric power saving cost. Total 4 scenarios were made, Baseline scenario, assuming the past trend is to be maintained in the future, green remodeling scenario, reflecting actual green remodeling project of Seoul Customs Office, behavior improvement and renewable energy supply, and Total scenario. According to the analysis result, the energy demand in 2035 of Baseline scenario was 6.1% decreased from base year 2013, that of green remodeling scenario was 17.5%, that of behavior improvement and renewable energy supply scenario was 21.1% and that of total scenario was 27.3%. The greenhouse emission of base year 2013 was $878.2tCO_2eq$, and it was expected $826.3tCO_2eq$, approx. 5.9% reduced, in 2035 by Baseline scenario. the cumulative greenhouse gas emission saving of the analyzing period were $-26.5tCO_2eq$ by green remodeling scenario, $2.8k\;tCO_2eq$ by behavior improvement and renewable energy supply scenario, and $2.0k\;tCO_2eq$ by total scenario. In addition the effect of electricity saving cost through energy saving has been estimated, and it was approx. 634 million won by green remodeling scenario and appro. 726 million won by behavior improvement and renewable energy supply scenario. So it is analyzed that of behavior improvement and renewable energy supply scenario would be approx. 12.7% higher than that of green remodeling scenario.

Ripple Effect Analysis of Construction Standard Unit Price in Public Construction (공공건설공사 표준시장단가 적용 파급효과 분석)

  • Jin, Zheng-Xun;Baek, Seung-Ho;Lee, Ju-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_3
    • /
    • pp.1207-1219
    • /
    • 2022
  • 「Act On Contracts To Which The State Is A Party」 stipulates that the "Construction Standard Production Rate" and "Construction Standard Unit Price" be used as the criteria for determining the estimated price of construction works performed by public institutions. In this regard, issues such as the application scope of the Construction Standard Unit Price, and the effect of budget reduction continue. However, due to the lack of quantitative data on the actual application of Construction Standard Unit Price, it is difficult to objectively evaluate various issues. In order to prepare data for objective evaluation of the Construction Standard Unit Price, this study analyzed the ripple effect of applying the Construction Standard Unit Price based on the bill of quantity. As a result of the analysis, the Construction Standard Unit Price ripple effect in the civil engineering part was 9.2%, and it was analyzed that there was a ripple effect of about 1.9% based on the civil engineering direct cost. In the construction part, the ripple effect was analyzed to be relatively high at 17%, but it was found to have a ripple effect of about 3% in the construction direct cost. Based on the total direct cost, the ripple effect was calculated as 2.2%. Based on the analysis results, it is possible to evaluate the effect of applying the Standard Market Unit Price, and it is expected to be used as basic data to solve issues. As a future study, it is necessary to additionally analyze the ripple effect by Standard Market Unit Price application range (over 10 billion, over 20 billion won, etc.) and delivery system type (comprehensive evaluation, qualification examination, technical bidding, etc.). In addition, it is necessary to study the appropriate ripple effect of the Standard Market Unit Price.

A Study on Integrated Operation of School Bus in Suburbs (교외지역 통학버스 통합 운영 방안 연구)

  • Ko, Young Dae;Oh, Yonghui
    • Journal of Korean Society for Quality Management
    • /
    • v.46 no.4
    • /
    • pp.899-910
    • /
    • 2018
  • Purpose: Generally, since the population density is lower in suburban areas, the distance to school is inevitably long. Therefore, schools in suburban areas often operate school buses to improve student welfare. However, since school buses are usually used only during going to and from school, the utilization rates are relatively low. Therefore, this study aims to establish integrated operation plan of public school bus covering all schools. Methods: It is necessary to decide which school buses will serve the specific demand node which want to go to certain school in order to design an integrated operation plan for school buses. Therefore, a mathematical model is developed for minimizing the total number of vehicles and the distance of transportation by reflecting the characteristics of school buses and students as constraints. To solve the proposed mathematical model, CPLEX, a commercial solver, is applied. Results: To validate and to confirm the proposed process, numerical example is designed with the comparison between before and after integrated operations of school buses in terms of total operation cost. The result shows that the integrated operation can lead the reduction of the number of school buses as well as the decreasing of the fuel cost. Conclusion: This study provides the quantitative method to perform the integrated operation of school buses in suburban areas. The optimal operation strategy is required because there are more complex decision-making elements considering the integrated operation. It is expected to apply this research result at real situation to expand this services based on an optimal operation.