• Title/Summary/Keyword: exit ramp queue

Search Result 4, Processing Time 0.016 seconds

Determination of Deceleration Lane Length in Interchange with Shock-Wave Theory (충격파를 고려한 입체교차로의 감속차로 길이 산정방안)

  • Kim, Jeong-Hyun
    • International Journal of Highway Engineering
    • /
    • v.11 no.1
    • /
    • pp.145-151
    • /
    • 2009
  • Current highway design standards is based on the safety under the free flow condition. The length of deceleration lane is also determined in terms of the deceleration distance which is necessary for the driers to adjust the vehicle speed from the speed limit on the main road to that on the exit ramp of the interchange. However, the queues are frequently developed on the deceleration, and the following vehicles to exit must decelerate on the main road. It may cause delay on the main road and traffic accidents. This study is to suggest a methodology to minimize such problems with the shock-wave theory. The queue length of exiting vehicles can be estimated by the design speeds, traffic volumes of main road and the exiting ramp, and the countermeasures to the operational problems. According to the results, the queue length can be shortened to 80% by upgrading the design speed of exit ramp as the amount of 10km/h. Fifty percent of queue length can be shortened by adding an additional lane on the ramp to two lanes.

  • PDF

Traffic Analysis Model for Exit Ramp Congestion at Urban Freeway (고속도로 진출램프 대기행렬 발생 현상 분석모형 개발)

  • Jeon, Jae-Hyeon;Kim, Young-Chan
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.9 no.3
    • /
    • pp.30-40
    • /
    • 2010
  • The freeway congestion is largely generated by a mainline spillover of the exit ramp queue. So it is necessary to study for modeling of the phenomenon and applying the model. In this study, the authors evaluated applicability of the Supply-Demand model, which can express traffic flow for the freeway by applying flexibly supply and demand curves for capacity of the freeway. First the authors proposed methods processing input data required in the Supply-Demand model, such as sending & receiving functions and time-varying capacity constraints for the freeway mainline. After modeling the Supply-Demand application model, the authors applied the model to the site including congested Hongeun exit ramp in Seoul Ring-road, and improved the model by adjusting application techniques and calibrating parameters. The result of the analysis showed that the Supply-Demand model yielded a queuing pattern and queue location similar to them observed in the field data, and applicability of the Supply-Demand model was varified.

Development of an Urban Freeway Exit-Intersection Control Strategy using Actuated Traffic Control (감응식 신호제어를 이용한 도시고속도로 진출부 교차로 제어전략 개발)

  • So, Jae-Hyun;Cho, Han-Seon;Lee, Seung-Hwan
    • Journal of Korean Society of Transportation
    • /
    • v.26 no.6
    • /
    • pp.81-89
    • /
    • 2008
  • This paper aims to develop an integrated urban freeway exit-intersection actuated traffic signal control strategy based on which a real-time detection of queue at each of an exit-ramp and an arterial. To evaluate effects of the proposed actuated traffic signal control according to various traffic situations and geometric conditions, this paper analyzed the effects of the proposed traffic signal control strategy according to traffic situations such as the occasion of the arterial being saturated, the occasion of the exit-ramp being saturated, and the occasion of both the arterial and the exit-ramp being saturated. To reflect geometric conditions that influence the effects of the control strategy, this paper evaluated effects before and after applying the actuated traffic signal control strategy according to six cases for both above and under the downstream link length of 200m as proposed by COSMOS. The study results shown that when the link length above 200m, offered a greater effect of applying the actuated traffic control strategy than below 200m. Thus, the actuated traffic signal control through a real-time detection of queue is expected to offer a greater effect at longer downward link.

Determination of Minimum Spacing between Off-ramp Terminus and Intersection Considering the Influence of Adjacent Signalized Intersections (신호교차로 영향에 따른 도시고속도로 유출연결로 최소이격거리에 관한 연구)

  • Kim, Sang-Gu;Sim, Dae-Yeong;Heo, Du-Wan
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.4
    • /
    • pp.79-87
    • /
    • 2007
  • The interchanges of urban freeways have many problems with traffic operation due to high off-ramp flows and frequent congestion at adjacent intersections. The flow exiting from off-ramps is affected by the operational status and traffic volume conditions of the nearest signalized intersection. As a result, off-ramp flow cannot exit and the queue backs up the freeway mainline when queues from the signalized intersection form up to the junction of the off-ramp and street. The spacing between an off-ramp and an adjacent intersection is likely to determine the traffic conditions at the adjacent intersection. However, the current design guidelines do not consider such a factor. This study is to develop a model calculating the spacing between off-ramps and adjacent intersections considering the signal, traffic, and road conditions. The variables affecting the model in this study are effective green time (g/C), volume-capacity ratio (v/c), the number of lanes, and off-ramp volume. Various scenarios are designed to represent the effects of the variables and the road networks are constructed using VISSIM, which is a common traffic micro-simulation software package. The queue length is derived from VISSIM and this length is considered as the recommended spacing between the off-ramp and the adjacent intersection. Through the simulation analysis, regression models are developed to calculate the queue length reflecting the various conditions such as signals, traffic, and road configurations. The developed model can be used to create road design guidelines to determine the location of off-ramps in the planning stage.