An Experimental Study on Behavior Characteristics of the Pretension Soil Nailing Systems (프리텐션 쏘일네일링 시스템의 거동특성에 관한 실험적 고찰)

  • Choi, Young-Geun;Shin, Bang-Woong;Park, Si-Sam;Kim, Hong-Taek
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.2
    • /
    • pp.87-96
    • /
    • 2004
  • Application of the soil nailing method is continuously extending in maintaining stable excavations and slopes. However, ground anchor support system occasionally may not be used because of space limitations in urban excavation sites nearby the existing structures. In this case, soil nailing system with relatively short length of nails could be efficiently adopted as an alternative method. The general soil nailing support system, however, may result in excessive deformations particularly in an excavation zone of the existing weak subsoils. Pretensioning the soil nails then could play important roles to reduce deformations mainly in an upper part of the nailed-soil excavation system as well as to improve local stability. In this study, a newly modified soil nailing technology named as the PSN (Pretension Soil Nailing) is developed to reduce both facing displacements and ground surface settlements in top-down excavation process as well as to increase the global stability. Up to now, the PSN system has been investigated mainly focusing on an establishment of the design procedure. In the present study, laboratory model tests are carried out to investigate the failure mechanism and behavior characteristics of the PSN system. Various results of model tests are also analyzed to provide a fundamental basis for the efficient design.

Stability Analysis and Reliability Evaluation of the Pretensioned Soil Nailing System (프리텐션 쏘일네일링 시스템의 안정해석 및 신뢰도 분석)

  • 김홍택;강인규;박사원;고용일;권영호
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.2
    • /
    • pp.105-127
    • /
    • 1999
  • Application of the soil nailing method is continuously extended in maintaining stable excavations and slopes. Occasionally, however, ground anchor support system may not be used because of space limitations in urban excavation sites nearby the existing structures. In this case, soil nailing system with relatively short length of nails could be efficiently adopted as an alternative method. The general soil nailing support system, however, may result in excessive deformations particularly in an excavation zone of the existing weak subsoils. Pretensioning the soil nails then, could play important roles in reducing deformations mainly in an upper part of the nailed-soil excavation system as well as improving local stability. In the present study, the analytical procedure and design technique are proposed to evaluate maximum pretension force and stability of the pretensioned soil nailing system. Also proposed are techniques to determine the required thickness of a shotcrete facing and to estimate probability of a failure against the punching shear. The predicted results are compared with the limited measurements obtained from the excavation site constructed by using the pretensioned soil nails. Based on the proposed procedure and technique, effects of the radius of a influence circle and dilatancy angle on the thickness of a shotcrete facing, bonded length and safety factors are analyzed. In addition, effects of the reduction of deformations expected by pretensioning of the soil nails are examined in detail throughout an illustrative example and FLAC$^{2D}$ program analysis.s.

  • PDF

Three-Dimensional Finite Element Analysis on Tunnel Behaivor Reinforced by Umbrella Arch Method (3차원 유한요소해석에 의한 Umbrella Arch 공법으로 보강된 터널의 거동 해석)

  • 유충식;신승우
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1995.10a
    • /
    • pp.211-216
    • /
    • 1995
  • In recent years, Natm has been successfully applied to difficult ground conditions with the use of soil-perservention methods which promote face stability and restrict excessive ground movement. When the tunnle excavation od made through difficult ground like highly weathered rock, the umbrella arch method is often adopted which pre-reinforceas tunnel crown periphery using a stiff shell-shaped structure. The umbrella arch method was originally developed in Itali, and has recently been confirmed its effectiveness in Korea as well. However, no in depth study on the umbrella arch method has been conducted ans as a result no rational analysis/design method is available at present. Therefore this study was undertaken with the aim of identifying the basic reinforcing mechanism and satablishing both qualitative and quantiative relationships between various design parameters and ground movements.

  • PDF

A Study on the Behavior of Concrete floors with Over-break in Railroad Tunnel (여굴깊이에 따른 철도터널 바닥 콘크리트의 거동에 관한 연구)

  • Yang, Joo-Kyoung;Kim, Hyo-Jung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.5
    • /
    • pp.101-107
    • /
    • 2017
  • Over-break, which is excavated larger than planned line at tunnel excavation, is inevitable due to the nature of blasting. But regarding the bottom of the foundation, most of the domestic ordering organizations pay only 10 cm thick filled concrete when pouring concrete due to over-break. In accordance, the construction cost will increase greatly if all the depths of the designed over-break are filled only with concrete. When tunnel excavation occurs, concrete filling of 18 MPa(T = 100 mm) and 150 mm~237 mm auxiliary concrete layer and 240 mm concrete track(TCL) are applied to the upper part. The concrete is installed in an excessive amount of about 600 mm between the lower part of the rail and the tunnel rock bed. Therefore, in this study, it is necessary to analyze the concrete crack structure according to the depth of the existing tunnel and the modified tunnel section, and to evaluate the adequacy of the required thickness of the tunnel floor concrete for securing the crack stability of the concrete.

Develop a sustainable wet shotcrete for tunnel lining using industrial waste: a field experiment and simulation approach

  • Jinkun Sun;Rita Yi Man Li;Lindong Li;Chenxi Deng;Shuangshi Ma;Liyun Zeng
    • Advances in concrete construction
    • /
    • v.15 no.5
    • /
    • pp.333-348
    • /
    • 2023
  • Fast infrastructure development boosts the demand for shotcrete. Despite sand and stone being the most common coarse and fine aggregates for shotcrete, excessive exploration of these materials challenges the ecological environment. This study utilized an industrial solid waste, high-titanium heavy slag, blended with steel fibers to form Wet Shotcrete of Steel Fiber-reinforced High-Titanium Heavy Slag (WSSFHTHS). It investigated its workability, shotcrete performance and mechanical properties under different water-to-cement ratios, fly ash content, superplasticizer dosage, and steel fiber content. The tunnel excavation and support were investigated by conducting finite element numerical simulation analysis and was used in 3 tunnel lining pipes in Zhonggouwan tailing pond. The major findings are as follows: (1) The water-to-cement ratio (w/c ratio) significantly impacted the compressive strength of WSSFHTHS. The highest 28-day compressive strength of 60 MPa was achieved when the w/c ratio was 0.38; (2) Adding fly ash improved the workability and shotcrete performance and strength development of WSSFHTHS. The best anti-permeability performance was achieved when the fly ash constituted 15%, with the lowest permeability coefficient of 4.596 × 10-11 cm/s; (3) The optimum superplasticizer dosage for WSSFHTHS is 0.8%. It provided the best workability and shotcrete performance. Excessive dosage resulted in water bleeding and poor aggregate encapsulation, while insufficient dosage decreased flowability and adversely affected shotcrete performance; (4) The dosage of steel fibers significantly impacted the flexural and tensile strength of WSSFHTHS. When the steel fiber dosage was 45 kg/m3, the 28-day flexural and tensile strengths were 8.95 MPa and 6.15 MPa, respectively; (5) By integrating existing shotcrete techniques, the optimal lining thickness was 80 mm for WSSFHTHS per simulation. The results revealed that after using WSSFHTHS, the displacement of the tunnel surrounding the rock significantly improved, with no cracks or hollows, similar to the simulation results.

Effects of Anchor Block on Stability of Concrete Electric Pole (콘크리트전주의 안정성에 미치는 근가의 영향)

  • Ahn, Tae-Bong
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.11
    • /
    • pp.5-10
    • /
    • 2012
  • Many electric poles in the softground have been collapsed due to external load. In this study, several tests were performed with variation of numbers and depths of anchor blocks to find effects of anchor blocks on stability of concrete electric poles through earth pressure and displacement analysis. 1.50m depth of anchor block seems appropriate among three kinds of depths. The 2.25m depth of anchor block makes larger displacement due to disturbance caused by excessive excavation. The deeper anchor block, the less earth pressure of passive zone, an active earth pressure gets larger. When two anchor blocks were installed, displacement at top pole decreased 43.8% and 55.6% at ground when 1 anchor block was installed.

A Study on the Prediction of Outflow of Groundwater in Tunnel Construction Areas (터널 굴착시 발생하는 지하수의 유출량 예측에 관한 연구)

  • Park, Sun Hwan;Chang, Yoon Young;Kang, Hyung Sik;Choi, Joon Gyu;Yang, Keun Ho
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.6
    • /
    • pp.407-419
    • /
    • 2007
  • This study investigated the predicted and abserved outflow of groundwater which occurred during tunnel constructions. Among the 586 road construction projects from 1986 to 2006, 4 route 25 tunnel construction areas and 26 waste water treatment facilities under construction were studied. Most of the tunnel outflow prediction in EIA (Environmental Impact Assessment) process have been classified into the 17 types of units depending on the assessor's options, which have not conformed to the request of the residents and non government organizations. The investigation results showed that the outflow of underground water in tunnel construction areas averaged about $0.133m^3/km{\cdot}min$ with the maximum $0.386m^3/km{\cdot}min$, and that the outflow mostly occurred in the early stage of tunnel excavation and diminished gradually. The prediction of outflow of underground water in the EIA process showed excessive results compared to observed outflow, the even 51.7 times. Consequently for more realistic prediction, current EIA method for prediction of outflow of underground water in tunnel construction areas has to adopt numerical methods coupled with hydraulics and geologic informations from unit methods of present time.

A Study on application of Trapezoidal Steel Box Tunnelling Method (지중압입체를 이용한 지하구조물 축조방법의 적용성 연구)

  • Jun, Sung Bai
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.2
    • /
    • pp.138-154
    • /
    • 2008
  • The conventional non-dig underground structure building method which made an appearance to reduce the social and environmental costs and maximize the efficiency of the social overhead capital facilities could not help being uneconomical because of many problems such as unnecessary excessive excavation, water leakage, obstacle interference, difficulty of curvilinear application and connection complexity between propelled and injected bodies due to indiscriminate application of small and large circular steel pipes without consideration of the site conditions. The T.S.T.M, in which a protruded square tube is applied as a propulsion and injection body in a design that considered site conditions such as ground condition, depth of soil and live load, was able to be economical as it solved the problems of water resistance, minimization of obstacle interference and curvilinearity, and we can see that it can be applied to all grounds by utilizing or complementing the target ground in terms of engineering. Also in configuring the transverse section, it is possible to not only secure excellent structural safety but also implement all of the above engineering characteristics not only in the square cross section but also in the arch cross section, so it was possible to build structures on any section or ground, and we could confirm the LCC reduction effect and the VE effect.

  • PDF

Predictive models of ultimate and serviceability performances for underground twin caverns

  • Zhang, Wengang;Goh, Anthony T.C.
    • Geomechanics and Engineering
    • /
    • v.10 no.2
    • /
    • pp.175-188
    • /
    • 2016
  • The construction of a new cavern modifies the state of stresses and displacements in a zone around the existing cavern. For multiple caverns, the size of this influence zone depends on the ground type, the in situ stress, the cavern span and shape, the width of the pillar separating the caverns, and the excavation sequence. Performances of underground twin caverns can be unsatisfactory as a result of either instability (collapse) or excessive displacements. These two distinct failures should be prevented in design. This study simulated the ultimate and serviceability performances of underground twin rock caverns of various sizes and shapes. The global factor of safety is used as the criterion for determining the ultimate limit state and the calculated maximum displacement around the cavern opening is adopted as the serviceability limit state criterion. Based on the results of a series of numerical simulations, simple regression models were developed for estimating the global factor of safety and the maximum displacement, respectively. It was proposed that a proper pillar width can be determined based on the threshold influence factor value. In addition, design charts with regard to the selection of the pillar width for underground twin rock caverns under similar ground conditions were also developed.

Performance Test of Large Scale Embankment made with Bottom Ash and Tire Shred (저회-폐타이어 재생혼합토의 실대형 성토구조물 성능 시험)

  • Lee, Sung-Jin;Shin, Min-Ho;Hwang, Seon-Keun;Koh, Tae-Hoon;Lee, Yong-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1756-1767
    • /
    • 2008
  • Recently, a global trend has been established to facilitate the use of waste materials in geotechnical engineering applications. In Korea, where there is the need to save natural resources as these may become scare in the near future and to prevent excessive ground excavation for natural aggregates. The annual production of scrap tire and bottom ash has sharply increased in recent years. Therefore, it will be good waste resource recycling, if we can utilize the above wastes as fill materials in soft ground. In this study, based on the proven feasibility of bottom ash and tire shred-soil mixtures as lightweight fill materials, tire shred-bottom ash mixtures were suggested as a new lightweight fill material to replace the conventional construction material(soil) with bottom ash. Therefore, the main objective of this research is to investigate the feasibility of tire shred-bottom ash mixtures in order to estimate their suitability for the use of lightweight fill materials. So we carried out the performance tests of 2 large scale embankment which were made with tire shred-bottom ash mixture and the conventional fill material(weathered soil) respectively.

  • PDF