• Title/Summary/Keyword: excavation method

Search Result 1,058, Processing Time 0.029 seconds

Disc Cutter Consumptions Prediction on Applying Shield TBM at the Han Riverbed Tunnel (한강하저터널의 쉴드TBM 적용시 디스크 커터 소모량 예측과 소모량)

  • Choi, Jung-Myung;Jung, Hyuk-Sang;Chun, Byung-Sik;Lee, Yong-Joo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.562-570
    • /
    • 2010
  • This study was conducted to estimate the number of disc cutter consumption and to predict amount of disc cutters when a shield TBM(Tunnel Boring Machine) of the Han Riverbed Tunnel was applied. In fact, it is almost impossible to change the machine after starting the excavation using the shield TBM method. Therefore, it is important to design an appropriate equipment in the shield method - an efficiency choice of the operation equipment plays a key role in the shield tunnel processing. For the above reason, the disc cutter consumption prediction is quite important so that the detailed analysis is required. A number of disc cutter consumption was predicted by the three methods, viz. KOMATSU, MITSUBISHI and NTNU. In addition, the predicted results were compared with field data. The prediction of disc cutter consumption showed that 237 for KOMATSU, 501 for MITSUBISHI, and 634 for NTNU, respectively. However, a total number of 1,263 disc cutter consumption were investigated during the tunnel construction. It was found that there was a huge difference between the predicted and real values of the disc cutter consumption. The more detailed investigation showed that the disc cutter was worn out bluntly in the northbound tunnel, meanwhile it was worn out sharply in the southbound tunnel. In particular, the disc cutter consumption in the southbound tunnel was increased rapidly because of rear abrasion for remaining mucks in the chamber.

  • PDF

A research on the selection of subject and its legal and institutional guarantee concerning protection of the intellectual property of traditional medicine (전통의약분야의 지적 재산권 보호를 위한 대상 발굴 및 법적.제도적 보장 방안 연구)

  • Kim, Hong-Jun;Lee, Sang-Jung;Ju, Young-Sung
    • Korean Journal of Oriental Medicine
    • /
    • v.8 no.2 s.9
    • /
    • pp.47-65
    • /
    • 2002
  • This project is planned to grasp the present situation of traditional medicine part in our country and to study protection method about this by the intellectual property which is the international concerning point recently. Through this, we will be able to devise means to deal with protection method of traditional medicine being developed by WIPO now. Traditional medicine field In our country Is organized with specific condition separated into the part of institution and the part of non-institution. So, because of the closed peculiarity, we have experienced the difficulties to understand the real facts about traditional medicine. We cannot be indifferent to the matter anymore. Because the expectation of object people is high, we could expect the realization of research content. In 1 detail project, we investigated the situation of traditional medicine in our country through various collecting methods for excavation of oriental treatment technique and herb medicine which is worth protecting. With it, we sorted again into 56 kinds of 11 parts through analysis of validity in the way of oriental medicine. And we tried to link this up 2 detail project which is about legal and institutional guarantee concerning protection. furthermore, we tried to find approach ways for security of objectivity into 4 steps with the example of model disease. we could complete practical classification of traditional medicine in our country. In 2 detail project, we studied the protection method by the intellectual property through research result in 1 detail project. For this, we observed an outline of the intellectual property including a patent application analysis in folk traditional medicine part, and problems of traditional medicine protection and world trend by traditional knowledge protection tendency and the patent law In domestic traditional medicines, the aspects unprotectable with the patent law now were remained. So, we suggested supplementary plan. And we also suggested the freedom of utilization between traditional medicine possession countries (in-situ utilization) and the demand compensation payment for a third country (ex-situ utilization) in connection with international movement.

  • PDF

Theoretical and Numerical Study on the Support Pressure for Tunnel Face Stability in Shield TBM Construction (쉴드터널 시공 시 막장안정을 위한 지보압의 이론적.수치해석적 고찰)

  • Kim, Kwang-Jin;Koh, Sung-Yil;Choo, Seuk-Yeun;Kim, Jong-Soo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.3
    • /
    • pp.197-204
    • /
    • 2006
  • A large sectional tunnelling method using Shield TBM is expected to be popular as domestic demand of long tunnel gets growing. Although a shield tunnelling method has been recognized as prominent method in consideration of stability and applicability in shallow and poor ground, the cases of accident and constructional trouble have been often happened due to unexpected poor ground condition, or selection and use of improper shield machine. Especially, troubling cases at tunnel face are frequently occurred, so supporting pressure control of tunnel face would be the main issue for securing safer and more efficient tunnel excavation using Shield TBM. In this point, we carried out the numerical feed-back analysis to compare the ground deformation pattern with theoretical result at tunnel face.

A Study on the Stability Estimation Procedure for Reinforced Pillar of Twin Tunnel (병설터널 보강 필라의 안정성 평가방법에 관한 연구)

  • Baek, Seungcheol;Jang, Busik;Lee, Taegyu;Lee, Sungmin;Hwang, Jungsoon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.7
    • /
    • pp.81-91
    • /
    • 2009
  • Recently, twin-tunnel is often designed in the aspects of disaster prevention and economical reasons. However, the design cases and the studies are relatively insufficient. By the twin-tunnel excavation, deviate stresses of pillar between tunnels are increased and the increased stresses induce the instability of the twin-tunnel. In this study, numerical analyses about the twin-tunnel behaviour were conducted with varying ground strength, width of pillar and depth of earth cover and a series of regression analyses were carried out by using the results of numerical analyses for the twin-tunnel. Based on the numerical analyses, an estimation method of derived stresses is suggested through the regression analyses. Also, based on the results of regression analyses, an quantitative estimation method considering the reinforcement effects is also suggested. Then various parametric studies were conducted to be considered the reinforcement type and various design parameters. Finally, the efficiency of the suggested method based on the Hoek-Brown Failure Criterion is verified through the results of parametric studies.

  • PDF

Numerical investigations on stability evaluation of a jointed rock slope during excavation using an optimized DDARF method

  • Li, Yong;Zhou, Hao;Dong, Zhenxing;Zhu, Weishen;Li, Shucai;Wang, Shugang
    • Geomechanics and Engineering
    • /
    • v.14 no.3
    • /
    • pp.271-281
    • /
    • 2018
  • A jointed rock slope stability evaluation was simulated by a discontinuous deformation analysis numerical method to investigate the process and safety factors for different crack distributions and different overloading situations. An optimized method using Discontinuous Deformation Analysis for Rock Failure (DDARF) is presented to perform numerical investigations on the jointed rock slope stability evaluation of the Dagangshan hydropower station. During the pre-processing of establishing the numerical model, an integrated software system including AutoCAD, Screen Capture, and Excel is adopted to facilitate the implementation of the numerical model with random joint network. These optimizations during the pre-processing stage of DDARF can remarkably improve the simulation efficiency, making it possible for complex model calculation. In the numerical investigations on the jointed rock slope stability evaluations using the optimized DDARF, three calculation schemes have been taken into account in the numerical model: (I) no joint; (II) two sets of regular parallel joints; and (III) multiple sets of random joints. This model is capable of replicating the entire processes including crack initiation, propagation, formation of shear zones, and local failures, and thus is able to provide constructive suggestions to supporting schemes for the slope. Meanwhile, the overloading numerical simulations under the same three schemes have also been performed. Overloading safety factors of the three schemes are 5.68, 2.42 and 1.39, respectively, which are obtained by analyzing the displacement evolutions of key monitoring points during overloading.

Experimental verification for prediction method of anomaly ahead of tunnel face by using electrical resistivity tomography

  • Lee, Kang-Hyun;Park, Jin-Ho;Park, Jeongjun;Lee, In-Mo;Lee, Seok-Won
    • Geomechanics and Engineering
    • /
    • v.20 no.6
    • /
    • pp.475-484
    • /
    • 2020
  • The prediction of the ground conditions ahead of a tunnel face is very important, especially for tunnel boring machine (TBM) tunneling, because encountering unexpected anomalies during tunnel excavation can cause a considerable loss of time and money. Several prediction techniques, such as BEAM, TSP, and GPR, have been suggested. However, these methods have various shortcomings, such as low accuracy and low resolution. Most studies on electrical resistivity tomography surveys have been conducted using numerical simulation programs, but laboratory experiments were just a few. Furthermore, most studies of scaled model tests on electrical resistivity tomography were conducted only on the ground surface, which is a different environment as compared to that of mechanized tunneling. This study performed a laboratory experimental test to extend and verify a prediction method proposed by Lee et al., which used electrical resistivity tomography to predict the ground conditions ahead of a tunnel face in TBM tunneling environments. The results showed that the modified dipole-dipole array is better than the other arrays in terms of predicting the location and shape of the anomalies ahead of the tunnel face. Having longer upper and lower borehole lengths led to better accuracy of the survey. However, the number and length of boreholes should be properly controlled according to the field environments in practice. Finally, a modified and verified technique to predict the ground conditions ahead of a tunnel face during TBM tunneling is proposed.

A Study of Extracting Appropriate Conditions for Efficient Desalination for the Underwater Archaeological Ceramics from Ma Island in Taean (태안 마도출토 도자기의 효율적 탈염처리를 위한 조건도출 연구)

  • Nam, Byeong-Jik;Park, Dae-Woo;Kang, Hyun-Mi;Jang, Sung-Yoon;Jung, Yong-Hwa
    • Journal of Conservation Science
    • /
    • v.26 no.2
    • /
    • pp.133-142
    • /
    • 2010
  • This paper focused on desalination method for the underwater archaeological ceramics. The desalination method applied in this study takes additional conditions such as the amount of desalting water, temperature, and agitation conditions and compares the effects of desalt process. The result of efficiency rate appears that the twenty-times of the object weight of desalting water is more effective than that of ten-times one, but shows less economic compared to the cost. In addition, the research shows that the efficiency rate has been improved around 20 to 30 %, yet such improvement is not taken into account as an effective result considering the risk of damage from the physical and chemical impact and the consumption of energy in applying additional method.

Shield TBM trouble cases review and parameter study for the cause analysis (쉴드 TBM 트러블 사례 및 매개변수 연구를 통한 원인 분석)

  • Koh, Sungyil;La, You-Sung;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.2
    • /
    • pp.197-217
    • /
    • 2020
  • Shield TBM tunneling, used in the construction of Seoul subway line 7 and line 9, has been well known as a very efficient, as well as safe, tunneling method. Although the Shield TBM method has been known to be effectively used in poor ground conditions, a number of troubles have occurred during the use of the shield TBM, due to inappropriate machine selection, machine breakdown, and unpredicted ground conditions etc. In this study, several accidents and trouble cases occurred during excavation by Shield TBM, reported from Japan, were investigated. A series of numerical analysis was then performed to compare with the trouble cases and back-analysis results for the cause analysis. The lessons learned from the case studies are presented at the end.

Improvement Method for Preventing Groundwater Pollution in Jeju Island (제주도 지하수관정의 오염저감방안)

  • Yang, Sung-Kee;Han, Sang-Cheol
    • Journal of Environmental Science International
    • /
    • v.16 no.6
    • /
    • pp.735-743
    • /
    • 2007
  • A grouting method is the way to effectively prevent pollutants from spreading into the ground during the digging process of groundwater. This study, based on the comparative study of grouting methods being generally accepted, suggests various construction methods which are suitable for geological structure as follows: In Jeju Island, it is very likely that rocks may fall in shuttered zones such as cracks, joints, scoria layers, and clinker layers. For this reason, it is recommended that materials be injected from the bottom toward the top, not from the top to the bottom. In the case where the amount of injected materials become too large in the areas of cracks or joints because of high level of permeability coefficient, grouting materials which smeared into surrounding areas may cause unwanted cut in the aquifer of the bottom level. To avoid this, the amount of water should be reduced from the typical water-cement ratio of 1:2, and grouting materials with larger grading should be used. If the deep excavation of ground is made in Jeju Island, it is likely to have lots of voids because of geological characteristics. Based on the results of this research, it is found that to construct interior casing, the centralizer should be attached to the casing to prevent the casing from being in contact with the counter fort. The grouting in Jeju Island should be thicker than usual. To avoid over-use of grouting materials, to prevent grouting in more than necessary zone, and to facilitate grouting of void areas, the flexible selection of materials is required. And, to exactly figure out the interior of dug well, an examination through CCTV should necessarily be performed when grouting work is in progress.

A Comparative Study on the Spacing and Discharge Performance of Subsurface Drainage Culvert to Increase Drainage Efficiency (배수효율이 높은 지하암거의 간격과 주름유공관의 통수능 비교분석)

  • KIM, Hyuntai;RYU, Jeonyong;JUNG, Kiyuol;PARK, Youngjun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.6
    • /
    • pp.67-72
    • /
    • 2019
  • This study compared the theory of a culvert spacing and analytical results of the seepage flow for the subsurface drainage. i) If culvert spacing (Sc) is within 5 m, the unit drainage (q) is very larger; in contrast, if Sc is 5 m or more, there is very little drainage in the middle between drains. Therefore, the drain spacing should be within 5 m to ensure high drainage efficiency. ii) Since the planned culvert drainage increases linearly with the soil's permeability coefficient (k), k must be taken into account when determining the drain diameter by the planned culvert drainage. iii) As a result of analyzing the drainage performance of the absorbing culvert, the drainage performance is sufficient with the diameter of the corrugated drain pipe Dc = 50 mm at the length of the drain Lc = 100 m. iv) Therefore, if the drain spacing (Sc) is less than 5 m using the low-cost non-excavated drainage pipe method (${\Phi}50mm$ the corrugated drain pipe and fiber mat) rather than the conventional trench drain method (Sc > 10 m, Dc > 100 mm), uniform and high drainage efficiency can be ensured as well as low construction cost. v) The sub-irrigation+drainage culvert requires narrower drain spacing (Sc < 2-3 m) for irrigation. As a result of examining the condition of 35 mm in diameter (Dc) and 2~3 m in drain spacing, it is possible to apply the non-excavated drainage pipe method to the sub-irrigation+drainage culvert because drainage performance is sufficient at the drain length Lc = 50 m.