• 제목/요약/키워드: excavation method

검색결과 1,058건 처리시간 0.025초

CWS공법(buried wale Continuous Wall System)의 개발에 관한 연구 (Study on Development of CWS (buried wale Continuous Wall System) Method)

  • 이정배;임인식;천성철;오보환;하인호;임홍철
    • 한국건축시공학회지
    • /
    • 제6권2호
    • /
    • pp.81-89
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved qualify and reduction of construction period can be obtained from CWS method.

갱도의 심도 정보만을 고려한 지반침하위험도 평가법 개발 (Development of Subsidence Hazard Estimation Method Based on the Depth of Gangway)

  • 정용복;송원경;강상수
    • 터널과지하공간
    • /
    • 제18권4호
    • /
    • pp.272-279
    • /
    • 2008
  • 본 연구에서는 폐광산으로 인한 광산재해 중 기간 및 일반 시설물이나 인명의 피해를 초래하는 지반침하의 예측 및 평가를 위하여 국내에서 비교적 용이하게 확보할 수 있는 정보인 갱도심도를 사용하여 단순하면서도 국내 지질 및 채굴조건에 적합한 지반침하위험도 평가법을 개발하였다. 개발된 방법을 가상의 규칙적인 채굴적과 실제 침하현장에 대하여 적용한 결과 기존의 영향함수법에 의한 결과 및 현장 침하 사례와 유사한 결과를 얻었다. 따라서 본 연구에서 개발한 평가법은 복잡한 지질구조와 불규칙한 채굴적으로 대표되는 국내광산의 지반침하위험도평가 및 예측에 효과적으로 사용할 수 있을 것을 판단된다.

굴착에 따른 인접 제방의 파이핑 해석 (Piping Analysis for Excavation in a Embankment)

  • 이송;국중진;정민형
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제13권1호통권53호
    • /
    • pp.59-68
    • /
    • 2009
  • 파이핑에 의한 제방 사고의 원인은 설계과정에서 파이핑 현상에 대한 정확한 이해 없이 단순 적용되는 검토과정이 문제의 한 원인이 된다. 이에 본 연구는 사질토 지반에 가까운 제방단면에 sheet pile을 타입할 때 굴착면에서 기존의 파이핑 검토 방법들을 비교 분석하였다. Terzaghi 방법과 한계동수경사 방법에서 안전율은 각 방법에 따라 최대 2배의 차이를 보였다. 그리고 한계유속 방법은 설계인자를 어떻게 판정하느냐에 따라 큰 편차를 나타내었다. 결론적으로 기존의 파이핑 해석방법을 모든 지반 조건에 일률적으로 적용하기 보다는 지반 조건에 따라 각 해석방법이 가지는 특성을 이해하고 적용해야할 것이다.

연약점토지반에 설치된 IER 지주식 흙막이의 효과적인 수평변위억제 방법에 관한 연구 (A Study on the Effective Restraint Method of Lateral Displacement of an Inclined Earth Retaining Structure in Soft Clay)

  • 김자영;임종철;서민수;김창영;박은경;박태건
    • 한국지반공학회논문집
    • /
    • 제33권10호
    • /
    • pp.15-24
    • /
    • 2017
  • 기존 흙막이 공법을 개선함으로, 자립이 가능하게 IER공법이 개발되었다. IER 공법의 안정성은 실내모형실험과 현장실험을 통해서 확인되었다. 특히, 점토지반에서의 실내모형실험의 결과 상당한 변위 감소효과를 확인할 수 있었다. 본 연구에서는 IER을 점토지반에 실제 적용하여 계측데이터를 수집하였으며, 이것을 이용하여 연약점토지반에서의 적용성에 대해 분석하였다. 그리고 수치해석을 통해 동일한 개수의 H-pile이 적용된 일열 H-pile 흙막이에 비해서 IER 공법의 수평변위가 70.9% 감소하는 것을 확인하였다. 그러므로 IER 공법을 연약점토지반에 적용하면 높은 수평변위억제효과로 인해 지반의 안정성은 상당히 많이 증대될 것으로 판단된다. 또, 점토지반에서의 수평변위억제방법으로 전면지주의 근입부에 DCM보강을 제안하여, 수치해석을 통해 DCM 최적의 보강위치를 분석하였다. 그 결과, 굴착저면에서 전면지주의 근입부의 중간지점까지 DCM 보강하는 것을 제안하였다.

RPS공법을 이용한 철도횡단터널의 2차원수치해석 (2-Dimensional Numerical Analysis of Crossing Tunnel under Railroad using Roof Panel Shield Method)

  • 신은철;노정민;이은수;김경모;김중희;정병철
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.591-600
    • /
    • 2005
  • There are many cross tunnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(roof panel shield) method in crossing tunnel construction with comparing other existing cross tunnelling method are needed a little space and easy to change the direction of cutting shoe during the construction of pipe roof. The numerical analysis of RPS was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

  • PDF

터널 심발부의 선균열을 이용한 발파공법의 현장시험에 관한 연구 (A study on pilot Test of the Composition Presplitting Angle Cut method in tunnel blasting)

  • 황학;이태노
    • 한국터널지하공간학회 논문집
    • /
    • 제4권4호
    • /
    • pp.287-300
    • /
    • 2002
  • 터널굴착 발파기술로 새로 개발된 Composition Presplitting Angle Cut (COPA)은 기존 공법과는 달리 심발부에 먼저 인장파괴를 통하여 선균열 (사전절단)을 형성시킨다. 본 연구에서는 선균열 효과를 검증하기 위하여 굴진효율과 소음 진동의 발생크기를 측정하는 현장시험을 실시하였다. 그리고 이 공법의 경제성 및 작업성 (시공성)을 비교하기 위하여 동일한 조건에서 기존의 발파공법을 동시에 시험하여 그 결과를 비교하였다. 시험 결과 COPA - Cut 발파공법이 기존 발파공법보다 굴진효율이 증가하고 소음 진동이 감소되었다. 또한 경제성, 시공성 및 품질관리 측면에서 우수하다는 것을 확인 되었다.

  • PDF

Experimental study to determine the optimal tensile force of non-open cut tunnels using concrete modular roof method

  • Jung, Hyuk-Sang;Kim, Jin-Hwan;Yoon, Hwan-Hee;Sagong, Myung;Lee, Hyoung-Hoon
    • Geomechanics and Engineering
    • /
    • 제29권3호
    • /
    • pp.229-236
    • /
    • 2022
  • In this study, a model experiment and field experiment was conducted to introduce the optimal tensile force when constructing a non-open cut tunnel according to the ground conditions of sandy soil. CMR (Concrete Modular Roof) method is economical because of the high precision and excellent durability, and corrosion resistance, and the inserted parts can be used as the main structure of a tunnel. In addition the CMR method has a stable advantage in interconnection because the concrete beam is press-fitted compared to the NTR (New Tubular Roof) method, and the need for quality control can be minimized. The ground conditions were corrected by adjusting the relative density of sandy soil during the construction of non-open cut tunnels, and after introducing various tensile forces, the surface settlement according to excavation was measured, and the optimal tensile force was derived. As a result of the experiment, the amount of settlement according to the relative density was found to be minor. Furthermore, analysis of each tensile force based on loose ground conditions resulted in an average decrease of approximately 22% in maximum settlement when the force was increased by 0.8 kN per segment. Considering these results, it is indicated that more than 2.0 kN tensile force per segment is recommended for settlement of the upper ground.

극경암에서의 전단면터널 굴착속도 분석연구 (Analysis on the TBM Penetration Rates in Extremely Hard Rocks)

  • 박철환;신중호;박찬;김민규;정소걸;김화수
    • 터널과지하공간
    • /
    • 제10권4호
    • /
    • pp.526-532
    • /
    • 2000
  • 전단면터널 굴착장비에 의한 터널굴착을 설계할 때 일반적으로 적용되는 암반의 강도는 80-250 MPa로 알려져 있으나 설계단계에서 암반의 특성을 완전히 파악하지 못한 채 설계하고 수행하는 경우가 있다. 본 연구는 60% 이상 구간의 단축압축강도가 260 MPa이상이며, RMR값이 70이상의 암반에서 TBM으로 굴착된 약 5.3km 연장의 밀양댐계통 광역상수도 도수로터널 TBM 굴착구간의 암반특성을 규명하고 이로써 이론적 굴착속도를 분석하여, 실제의 순굴착속도와 비교분석한 것이다. 노르웨이 NTH에 의하여 제안된 이론적 굴착속도는 현장에서 수행된 순굴착속도의 평균값과 2∼20%의 오차를 갖는 것으로 평가되어, 극경암에서의 굴착속도 설계는 일본이나 미국에서 제안된 해석법에 비하여 NTH해석법이 가장 접근된 설계방법이라 할 수 있다. 현지암반을 펑가하여 순굴착속도와의 상관관계를 규명한 결과, 극경암에서의 순굴착속도는 슈미트 해머에 의한 반발경도와 RMR 값에 반비례하는 것으로 나타났는데, 이의 상관계수는 각각 0.705 및 0.777이었다. 이로써 반발경도와 RMR의 크기는 순굴착속도를 예측할 수 있는 요소가 될 수 있음을 알 수 있다. 또한 극경암에서의 순굴착속도는 현지암반의 지압의 크기에 크게 영향을 받고 있는 것으로 평가되어 TBM 굴착설계에서 지압상태는 중요한 설계요소의 하나로서 고려되어야 할 것이다.

  • PDF

암반터널 안정성 평가를 위한 손상제어실험 기반의 한계변형률에 관한 연구 (A study on critical strain based damage-controlled test for the evaluation of rock tunnel stability)

  • 이강현;김도훈;박정준;이인모
    • 한국터널지하공간학회 논문집
    • /
    • 제13권6호
    • /
    • pp.501-517
    • /
    • 2011
  • 일반적으로 터널 시공현장에서는 계측된 천단 및 내공변위와 계측관리기준을 비교하여 터널의 안정성을 판단한다. 현재 계측관리기준은 지반조건, 터널단면의 크기, 시공방법, 지보재량 등을 고려한 경험을 통해 세워지고 있는 실정이다. 따라서 새로운 계측관리기준으로 한계변형률을 이용하는 방법에 대한 연구가 다수 수행되었다. 그러나 대부분의 연구는 일축압축강도실험에서 얻어진 한계변형률을 기준으로 삼고 있어 실제 터널 굴착 시 발생하는 응력의 증가 및 종방향 아칭에 의한 암반 손상을 고려하지 않는 문제점을 가지고 있다. 따라서 본 연구에서는 국내 대표 암종인 화강암과 편마암의 한계변형률 특성을 조사하기 위하여 일축압축강도실험과 응력의 증가 및 종방향 아칭을 고려한 손상제어실험을 수행하였다. 손상제어실험에서 얻어진 한계변형률은 일축압축강도실험에서 얻어진 한계변형률보다 다소 작게 나타났다. 이는 일축압축강도실험에서 얻은 한계변형률은 터널 굴착 시의 응력이력을 고려하여 다소 감소시켜야 한다는 것을 의미한다. 또한 대심도 터널에서 흔히 발생하는 취성파괴를 평가하기 위한 손상한계변형률을 제안하였다.

연마재 투입형 워터젯 시스템의 공정 변수에 따른 연마재 투입량 변화 (Variation of abrasive feed rate with abrasive injection waterjet system process parameters)

  • 주건욱;오태민;김학성;조계춘
    • 한국터널지하공간학회 논문집
    • /
    • 제17권2호
    • /
    • pp.141-151
    • /
    • 2015
  • 터널굴착의 효율성 증진 및 굴착시 발생하는 진동 저감을 위해 연마재 투입형 워터젯 시스템을 이용한 새로운 형태의 암반 굴착 방식이 개발되어 적용 중에 있다. 연마재 투입형 워터젯 시스템을 이용한 암반 굴착 방식에 있어서, 적절한 양의 연마재를 투입하는 것은 절삭 성능뿐만 아니라 전체 공정의 경제성 향상을 위해서도 매우 중요하다. 본 연구에서는, 다양한 공정 변수들 중 터널 굴착용 워터젯 시스템에서 특히 중요한 공정 변수들인 기하학적 변수(연마재 탱크(또는 호퍼) 높이, 연마재 투입관의 구배, 연마재 투입관의 길이, 연마재 투입관의 굴곡도), 연마재 변수(연마재 입자 크기), 젯 에너지 변수(수압, 유량)이 연마재 투입량 및 연마재가 믹싱 챔버 내로 흡입될 때 발생하는 흡입 압력에 미치는 영향을 규명하기 위하여 다양한 조건에서 실험을 수행하고 그 결과를 분석하였다. 또한, 실험적 연구를 통하여 연마재 투입량이 절삭 성능에 미치는 영향을 논의하였다. 본 연구 결과를 바탕으로 주요 공정 변수들을 조절하여 적절한 연마재 투입량을 유지하면 터널 굴착용 워터젯의 절삭 성능을 극대화할 수 있을 것으로 기대된다.