• Title/Summary/Keyword: excavation area ratio

Search Result 35, Processing Time 0.05 seconds

Numerical Study on the Behavior of Corner Areas in Excavation Site (굴착 모서리부 거동에 대한 수치해석 연구)

  • Seok, Jeong-Woo;Hwang, Dae-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.757-764
    • /
    • 2004
  • This paper deals with the numerical study on the displacement behavior of corner areas in an excavation site. Several corner areas always exist in the excavation site. The corner area has two free surfaces, which may become serious weak point from the viewpoint of structural stability. If the structural reinforcements are not applied adequately in corner areas, significant displacement of retaining wall could occur. What is worse, the collapse of retaining system rarely happens. In this paper, 3D numerical analyses were performed to investigate the effect of the arrangement of diagonal and normal strut. From the analysis results, it is found that the spacing between diagonal strut and normal strut should be less than 4m to avoid excessive displacement due to excavation.

  • PDF

Analysis of Ground Deformation Deformation using Resistivity Monitoring Technique at a Tunnel Excavation Area (전기비저항 모니터링을 이용한 터널 주변 지반상태 변화 파악)

  • Ahn, Hee-Yoon;Jeong, Jae-Hyeung;Cho, In-Ky;Park, Sam-Gyu;Kim, Ki-Seog;Jung, Lae-Chul
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2007.06a
    • /
    • pp.93-100
    • /
    • 2007
  • During tunnel excavation, drawdown of groundwater table or discharge from tunnel faces may not only reduce stability of tunnel and work efficiency but cause environmental problems. We have investigated the applicability of electrical resistivity survey for the establishment of the monitoring system for groundwater behavior and detecting flow channel of groundwater during tunnel excavation. The groundwater level was continuously measured at several points for 1 year. Survey was conduted at every 3 months using preinstalled electrical resistivity cables on site. The results show that observed changes in resistivity ratios in the area can be explained with observed changes in groundwater level. Thus, we believed that electrical resistivity analysed together with groundwater data can be applied for the monitoring of groundwater in tunnel area.

  • PDF

MARS inverse analysis of soil and wall properties for braced excavations in clays

  • Zhang, Wengang;Zhang, Runhong;Goh, Anthony. T.C.
    • Geomechanics and Engineering
    • /
    • v.16 no.6
    • /
    • pp.577-588
    • /
    • 2018
  • A major concern in deep excavation project in soft clay deposits is the potential for adjacent buildings to be damaged as a result of the associated excessive ground movements. In order to accurately determine the wall deflections using a numerical procedure such as the finite element method, it is critical to use the correct soil parameters such as the stiffness/strength properties. This can be carried out by performing an inverse analysis using the measured wall deflections. This paper firstly presents the results of extensive plane strain finite element analyses of braced diaphragm walls to examine the influence of various parameters such as the excavation geometry, soil properties and wall stiffness on the wall deflections. Based on these results, a multivariate adaptive regression splines (MARS) model was developed for inverse parameter identification of the soil relative stiffness ratio. A second MARS model was also developed for inverse parameter estimation of the wall system stiffness, to enable designers to determine the appropriate wall size during the preliminary design phase. Soil relative stiffness ratios and system stiffness values derived via these two different MARS models were found to compare favourably with a number of field and published records.

A Trend of Back Ground Surface Settlement of Braced Wall Depending on the Joint Dips in Rocks under the Soil Strata (복합지반 굴착 시 암반층 절리경사 각도별 흙막이 벽체 배후 지표침하의 경향)

  • Bae, Sang-Su;Lee, Sang-Duk
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.11
    • /
    • pp.83-96
    • /
    • 2016
  • The surface settlement of the back ground of a braced wall due to the ground excavation has the great influence on the safety of the surrounding area. But it is not easy to predict the settlement of the surrounding area due to proud excavation. Estimation of the settlement of the surface ground induced by the deformation of the braced wall is performed by FEM and empirical method (Peck, Clough etc). In this research, surface settlement of the back ground braced wall depending on the joint dips in rocks during excavating the composit ground was measured at the large scale model test (standard: $0.3m{\times}0.3m{\times}0.5m$). The scale of model test was 1/14.5 and the ground was excavated in ten steps. Earth pressure on the braced wall and ground surface settlement on the back ground of a braced wall were investigated. The surface settlement during the excavation depended on the joint dips in rocks on of the ratio of rock layer. Maximum earth pressure and maximum surface settlement were masured at the same excavation step. In accordance with the increase of the rock layer dips and rock layer ratio, the ground surface settlement increased. The maximum ground surface settlement was 17 times larger at 60 degree joint dips in rocks than that of the horizontal ground conditions. And the position of the maximum surface settlement by empirical method was calculated at the point, which was 17%~33% of excavation depth. In accordance with the increase of the rock layer dips and rock layer ratio, the ground maximum surface settlement increased. The ground surface settlement of composite ground is smaller than that of the empirical.

A Study on Deformation Analysis of the Earth Retaining Wall (흙막이벽체의 변형해석에 관한 연구)

  • Lee, Song;Kim, Seong-Koo
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.2
    • /
    • pp.27-36
    • /
    • 2008
  • This paper analyzed the effects related to the difference of the geometrical shape of the ground excavation by comparing the displacements of the earth retaining wall of the strut resulting from the change of the excavation breadth B and the excavation length L, adopting the three dimensional FDM analysis. It appeared that the displacement of the earth retaining wall of the strut increases in accordance with the increase of L/B and it decreases as it becomes nearer from the center to the comer where the temporary structural system forms, and the wale member is closured because of the effects of the confining effect by the closure of the earth retaining wall and the wale member. This paper proposed a formula in which the results of three dimensional FDM analysis which considers the shape of the excavation plane can be obtained from those of two dimentional FDM analysis which does not consider the shape of the excavation plane. And the results of the formula were compared with those of the site instrumentation analysis.

Change of groundwater inflow by cutoff grouting thickness and permeability coefficient

  • Kim, Youngsang;Moon, Joon-Shik
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.165-170
    • /
    • 2020
  • The groundwater during tunnel excavation not only affects the stability of the tunnel and constructability but also causes the subsidence of the upper ground due to the lowering of groundwater. Generally, the cutoff grouting is applied as a countermeasure to reduce the groundwater inflow during tunnel excavation, and the cutoff grouting is often applied in the range of plastic zone around the tunnel. However, grouting in the plastic zone is only appropriate for ground reinforcement purposes, and guidelines for the application range of cutoff grouting and the targeted permeability coefficient of the grouting zone are required. In this study, the relationship between groundwater inflow into tunnel and application range of cutoff grouting and permeability coefficient is proposed and compared with numerical analysis results. It was found that grouting with tunnel radius thickness is appropriate to reduce the groundwater inflows effectively. More than 90% reduction in groundwater inflow can be achieved when the annular area of the tunnel radius thickness is grouted with a permeability reduction ratio of 1/50~1/200.

Effect of spatial characteristics of a weak zone on tunnel deformation behavior

  • Yoo, Chungsik
    • Geomechanics and Engineering
    • /
    • v.11 no.1
    • /
    • pp.41-58
    • /
    • 2016
  • This paper focuses on the deformation behavior of tunnels crossing a weak zone in conventional tunneling. A three-dimensional finite element model was adopted that allows realistic modeling of the tunnel excavation and the support installation. Using the 3D FE model, a parametric study was conducted on a number of tunneling cases with emphasis on the spatial characteristics of the weak zone such as the strike and dip angle, and on the initial stress state. The results of the analyses were thoroughly examined so that the three-dimensional tunnel displacements at the tunnel crown and the sidewalls can be related to the spatial characteristic of the weak zone as well as the initial stress state. The results indicate that the effectiveness of the absolute displacement monitoring data as early warning indicators depends strongly on the spatial characteristics of the weak zone. It is also shown that proper interpretation of the absolute monitoring data can provide not only early warning for a weak zone outside the excavation area but also information on the orientation and the extent of the weak zone. Practical implications of the findings are discussed.

Ground Behavior Behind Soil Nailed Wall by Feed Back Analysis (역해석에 의한 쏘일네일링 벽체 배면지반의 거동 연구)

  • Jeon, Seong-Kon
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.3
    • /
    • pp.5-13
    • /
    • 2003
  • The soil nailing is one of the useful support-system in urban excavation because of the presence of other structures in the vicinity Since the soil nailing system was introduced, model experiments and theoretical studies have been performed to investigate behavior of soil nailed wall. However, there are few data in the case of multi-layered soil strata just like Seoul Metropolitan area in Korea. The feed back analyses are carried out using the measured wall displacement data for soil nailing construction sites with multi-layered strata in order to analyze the distance and the coefficients of extension zone of ground behind soil nailed wall. As a result, the distance of extension zone increased with increasing of the final excavation depth and the ratio of the distance to the final excavation depth was shown to be about 94% of the final excavation depth. Also, the coefficients of extension zone increased with enlargement of soil layer thickness and converged into constant value of 1.05. On the other hand, the maximum vertical displacements by the feed back analysis and Caspe's method were shown to be approximately 80%, 150~280% of the maximum horizontal displacement respectively.

Ground Vibration in Tunnelling by Blasting and its Effect on Surface Structures (터널굴착이 지상구조물에 미치는 영향평가 및 발파지침설계)

  • 신희순;한공창;류창하;신중호;박연준;최영학
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.463-470
    • /
    • 2000
  • In tunnel excavation by blast beneath the surface structures in urban area, the characteristics of ground vibration induced by blast and its influence on surface structures are analyzed by the field test and the numerical analysis on dynamic behaviors of the structure. According to the field test on the propagating characteristics of blast vibration through the rock mass and the concrete foundation pile. the attenuation index of peak particle velocity with distance shows the range of 1.7∼2.0 for the rock mass and the range of 2.0∼2.3 for the concrete pile. This shows that the blast vibration reduces more rapidly in the concrete pile. It is known from the numerical analysis on dynamic behavior of the structure that the coefficient of response, velocity ratio of structure response to input wave, is different according to the story of the structure. It can be said from this research that the characteristics of the ground vibration and the dynamic behavior of the structure should be well evaluated and be considered as important factors for safe blasting design especially in underground excavation at shallow depth in urban area.

  • PDF

A comparative study on the stability evaluation of double deck tunnel in terms of excavation (대심도 복층터널에 대한 굴착 안정성 평가 비교 연구)

  • Jang, Namju;Gang, Han-gil;Kim, Kihwan;Choi, Chang-rim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.155-166
    • /
    • 2019
  • It is necessary to construct underground in the metropolis. Road traffic has reached saturation point. The city has several underground road construction projects. In abroad, double deck tunnels are planned and constructed. It is attained a high level of underground development technology. In case the double deck tunnel (2 lane) is planed instead of the bidirectional tunnel (2 lane), excavation area is similar. But tunnel width is decreased. The reduced width can cut cost for the tunnel reinforcement. This study evaluates the stability of excavation on double deck tunnel. By the assessment of the strength-stress ratio and strength reduction method, quantitative analysis is conducted between double deck tunnel and the bidirectional tunnel.