• Title/Summary/Keyword: estimation activities

Search Result 445, Processing Time 0.024 seconds

A Method of Estimating Radionuclide Accumulation in Coolant Purification System (원자력발전소 냉각수 정화계통의 핵종누적량 예측기법)

  • Whang, Joo-Ho;Lee, Jae-Min
    • Journal of Radiation Protection and Research
    • /
    • v.22 no.3
    • /
    • pp.183-193
    • /
    • 1997
  • The amount and kinds of radionuclide contained in waste volume should be known to prepare for occupational exposure management, perform safety assessment and finally to license a repository. Although the volume of filters and resins are small, activities of them comprise most of the radioactivity that made during power generation. This study aims at developing a method of estimating the radionuclide accumulation at the filters and resins of coolant systems. In this study, accumulated amount of radionuclides is estimated by a computer program which makes use of instantaneous decontamination factor, DF, instead of average DF. A FORTRAN program was developed for the estimation. Data from in-plant source-term measurements at Rancho-Seco nuclear power plant in the United States are employed for verification of the estimating method. And experimental data are employed, too. The instantaneous-DF-method showed smaller error than the average-DF-method. Accumulated amount of radionuclides can be calculated with only the DF and the radionuclide concentration, which are measured periodically according to the operating guide. However, especially, when the operating condition of nuclear power plant changes rapidly, the measuring term of DF and radionuclide should be shortened to ensure the accurate estimation.

  • PDF

Introduction of BIM Quality Standard for Quantity Take-off (건축 물량산출 활용을 위한 BIM품질기준 도입 방안)

  • Kwon, O-Cheol;Jo, Chan-Won;Cho, Joo-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.171-180
    • /
    • 2011
  • As high-rise and irregularly shaped building structures have become a trend at home and abroad, BIM technology is now being developed and accepted widely. However, the BIM data and information generated in the design phase cannot be actively reutilized in the construction stage. This is because the major interests of construction companies include working process and cost estimation, while there is not usually enough BIM data created to support these activities. In order to resolve this issue, we need to set up BIM modeling guides that make it possible to extract correct quantity take-off from BIM data. Quality checks are also necessary to ensure that the resulting BIM data is correct. This study suggests ways of securing BIM quality for correct quantity take-off, which is critical for BIM technology applied to the building construction process and its cost estimation.

The Relationship Between English Language Proficiency and the National Economic Performance: Focusing on non-English-Speaking OECD Countries (영어능력과 국가 경제성장과의 관계: OECD 비영어권 국가들을 중심으로)

  • Kim, Seon-Jae;Lee, Young-Hwa
    • The Journal of the Korea Contents Association
    • /
    • v.11 no.1
    • /
    • pp.329-339
    • /
    • 2011
  • This study aims at investigating how English proficiency affects economic development of a country by analyzing the relationships among English proficiency, economic activities (amount of trade, R&D investment, etc), and the rate of economic growth, focusing on twenty-one non-English-speaking OECD countries. Ordinary Least Square (OLS) and Seemingly Unrelated Regression Estimation (SURE) were used for the data analysis in the study. The findings reveals that there existed little statistical significance to support the fact that English proficiency was directly related to the economic development in a positive way in many countries except Mexico, the Czech Republic, Finland, and Poland. However, English proficiency indirectly influenced the economic development in the way of increasing the amount of trade. These results can lead to the conclusion that English proficiency is not a sufficient element but a necessary one. Furthermore, it is expected that English proficiency can positively affect the economic development when it plays a part as sufficient complementary goods which make up for physical capital, technology accumulation, political stability, and worthy government.

An Estimation of Amount of Damage Using the 3-second Gust When the Typhoon Attack (태풍 내습 시 3-second gust를 이용한 피해액 산정)

  • Jung, Woo-Sik;Park, Jong-Kil;Choi, Hyo-Jin
    • Journal of Environmental Science International
    • /
    • v.19 no.3
    • /
    • pp.353-363
    • /
    • 2010
  • The most efficient measures to reduce damage from natural disasters include activities which prevent disasters in advance, decrease possibility of disasters and minimize the scale of damage. Therefore, developing of the risk assessment model is very important to reduce the natural disaster damage. This study estimated a typhoon damage which is the biggest damage scale among increased natural disasters in Korea along with climate change. The results of 3-second gust at the height of 10m level from the typhoon 'Maemi' which did considerable damage to Korean in 2003, using the wind data at the height of 700 hPa. September 12th 09 LST~13th 12 LST period by the time a typhoon Maemi approached to the Korean peninsula. This study estimate damage amount using 'Fragility curve' which is the damage probability curve about a certain wind speed of the each building component factors based on wind load estimation results by using 3-second gust. But the fragility curve is not to Korea. Therefore, we use the fragility curves to FPHLM(FDFS, 2005). The result of houses damage amount is about 11 trillion 5 million won. This values are limit the 1-story detached dwelling, $62.51\sim95.56\;m^2$ of total area. Therefore, this process is possible application to other type houses.

An Estimation of Direct and Indirect GHG-AP Integrated Emissions from Energy Sector in Seoul (2010) (서울시 에너지부문 직·간접 온실가스-대기오염 통합 배출량(2010) 산정)

  • Jung, Jaehyung;Kwon, O-Yul
    • Journal of Korean Society for Atmospheric Environment
    • /
    • v.30 no.2
    • /
    • pp.150-160
    • /
    • 2014
  • Greenhouse gas (GHG) and Air Pollution (AP) emission inventories have been constructed and estimated independently up-to-date in Seoul. It causes difficulty in GHG and AP integrated management due to a difference in emission inventories. In this study, we constructed GHG and AP integrated emission inventories for direct and indirect sources in Seoul during the year 2010 in Energy activities for estimating GHG and AP emissions were derived from IPCC guideline, guidelines for local government greenhouse inventories, air pollutants calculation manual, and Indirect Emission Factors (IEF) reported by Korea Power Exchange. The annual GHG emission was estimated as 50,530,566 $tonCO_{2eq}$, of which 54.8% resulted from direct sources and the remaining 45.2% from indirect sources. Among direct sources, transportation sector emitted the largest GHG, accounting for 47.3% of the total emission from direct sources. As with indirect sources, purchased electricity sector only emitted 98.6% of the total emission from indirect sources. The annual AP emission was estimated as 283,701 tonAP, of which 85.9% was contributed by the combined AP emissions of transportation and fugitive sectors. Estimation of individual air pollutant showed that the largest source were transportation sector for CO, $NO_x$, TSP, $PM_{10}$ and NH3, non-energy sector for $SO_x$, and fugitive sector for VOCs. This study found some limitations in estimating GHG and AP integrated emissions, such as nonconforming emission inventories between GHG and AP, and no indirect AP emission factor of purchased electricity, and so on. Those should be further studied and improved for more effective GHG and AP integrated management.

A study on the Estimation of $CO_2$ Emission in Container Port by using Container O/D Analysis (컨테이너 O/D 분식에 따른 $CO_2$ 배출량 추정)

  • Kim, Hwan-Seong;Jo, Min-Ji;Choi, Se-Kyung
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2009.06a
    • /
    • pp.194-195
    • /
    • 2009
  • According to the issue "global warming", many regulations and agreements with countries in the world are becoming set and it is being fulfill now. Under the progress of Post Kyoto Protocol agreement, It will be sure that Korea rave a duty to reduce $CO_2$ emission from 2013. For them, Korea have to make a strategies about the Climatic Change Convention for all industries. Recently, a great attention about $CO_2$ emission in the world is focused on port, shipping line and airline. Most countries are establishing policies to prevent environment from these industry fields, but Korea has not yet made for them. Thus, Korea need to collect $CO_2$ emission data not only the routes of container from port but also activities in the port. In this paper, an estimation of $CO_2$ emission under the route of container transportation at Korea by using O/D analysis will be addressed. And then, it will be used to make a optimal routes of container transportation which can reduce $CO_2$ emission in future.

  • PDF

CONDITION MONITORING USING EMPIRICAL MODELS: TECHNICAL REVIEW AND PROSPECTS FOR NUCLEAR APPLICATIONS

  • Heo, Gyun-Young
    • Nuclear Engineering and Technology
    • /
    • v.40 no.1
    • /
    • pp.49-68
    • /
    • 2008
  • The purpose of this paper is to extensively review the condition monitoring (CM) techniques using empirical models in an effort to reduce or eliminate unexpected downtimes in general industry, and to illustrate the feasibility of applying them to the nuclear industry. CM provides on-time warnings of system states to enable the optimal scheduling of maintenance and, ultimately, plant uptime is maximized. Currently, most maintenance processes tend to be either reactive, or part of scheduled, or preventive maintenance. Such maintenance is being increasingly reported as a poor practice for two reasons: first, the component does not necessarily require maintenance, thus the maintenance cost is wasted, and secondly, failure catalysts are introduced into properly working components, which is worse. This paper first summarizes the technical aspects of CM including state estimation and state monitoring. The mathematical background of CM is mature enough even for commercial use in the nuclear industry. Considering the current computational capabilities of CM, its application is not limited by technical difficulties, but by a lack of desire on the part of industry to implement it. For practical applications in the nuclear industry, it may be more important to clarify and quantify the negative impact of unexpected outcomes or failures in CM than it is to investigate its advantages. In other words, while issues regarding accuracy have been targeted to date, the concerns regarding robustness should now be concentrated on. Standardizing the anticipated failures and the possibly harsh operating conditions, and then evaluating the impact of the proposed CM under those conditions may be necessary. In order to make the CM techniques practical for the nuclear industry in the future, it is recommended that a prototype CM system be applied to a secondary system in which most of the components are non-safety grade. Recently, many activities to enhance the safety and efficiency of the secondary system have been encouraged. With the application of CM to nuclear power plants, it is expected to increase profit while addressing safety and economic issues.

A Prototype of Distributed Simulation for Facility Restoration Operation Analysis through Incorporation of Immediate Damage Assessment

  • Hwang, Sungjoo;Choi, MinJi;Starbuck, Richmond;Lee, SangHyun;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.339-343
    • /
    • 2015
  • To rapidly recover ceased functionality of a facility after a catastrophic seismic event, critical decisions on facility repair works are made within a limited period of time. However, prolonged damage assessment of facilities, due to massive damage in the surrounding region and the complicated damage judgment procedures, may impede restoration planning. To assist reliable structural damage estimation without a deep knowledge and rapid interactive analysis among facility damage and restoration operations during the approximate restoration project planning phase, we developed a prototype of distributed facility restoration simulations through the use of high-level architecture (HLA) (IEEE 1516). The simulation prototype, in which three different simulations (including a seismic data retrieval technique, a structural response simulator, and a restoration simulation module) interact with each other, enables immediate damage estimation by promptly detecting earthquake intensity and the restoration operation analysis according to estimated damage. By conducting case simulations and experiments, research outcomes provide key insights into post-disaster restoration planning, including the extent to which facility damage varies according to disaster severity, facility location, and structures. Additional insights arise regarding the extent to which different facility damage patterns impact a project's performance, especially when facility damage is hard to estimate by observation. In particular, an understanding of required type and amount of repair activities (e.g., demolition works, structural reinforcement, frame installation, or finishing works) is expected to support project managers in approximate work scheduling or resource procurement plans.

  • PDF

A Stochastic Simulation Model for Estimating Activity Duration of Super-tall Building Project

  • Minhyuk Jung;Hyun-soo Lea;Moonseo Park;Bogyeong Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.397-402
    • /
    • 2013
  • In super-tall building construction projects, schedule risk factors which vertically change and are not found in the low and middle-rise building construction influence duration of a project by vertical attribute; and it makes hard to estimate activity or overall duration of a construction project. However, the existing duration estimating methods, that are based on quantity and productivity assuming activities of the same work item have the same risk and duration regardless of operation space, are not able to consider the schedule risk factors which change by the altitude of operation space. Therefore, in order to advance accuracy of duration estimation of super-tall building projects, the degree of changes of these risk factors according to altitude should be analyzed and incorporated into a duration estimating method. This research proposes a simulation model using Monte Carlo method for estimating activity duration incorporating schedule risk factors by weather conditions in a super-tall building. The research process is as follows. Firstly, the schedule risk factors in super-tall building are identified through literature and expert reviews, and occurrence of non-working days at high altitude by weather condition is identified as one of the critical schedule risk factors. Secondly, a calculating method of the vertical distributions of the weather factors such as temperature and wind speed is analyzed through literature reviews. Then, a probability distribution of the weather factors is developed using the weather database of the past decade. Thirdly, a simulation model and algorithms for estimating non-working days and duration of each activity is developed using Monte-Carlo method. Finally, sensitivity analysis and a case study are carried out for the validation of the proposed model.

  • PDF

Amelioration of 1,2 Dimethylhydrazine (DMH) Induced Colon Oxidative Stress, Inflammation and Tumor Promotion Response by Tannic Acid in Wistar Rats

  • Hamiza, Oday O.;Rehman, Muneeb U.;Tahir, Mir;Khan, Rehan;Khan, Abdul Quaiyoom;Lateef, Abdul;Ali, Farrah;Sultana, Sarwat
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.13 no.9
    • /
    • pp.4393-4402
    • /
    • 2012
  • Colon cancer is the third most common malignant neoplasm in the world and it remains an important cause of death, especially in western countries. The toxic environmental pollutant, 1, 2-dimethylhydrazine (DMH), is also a colon-specific carcinogen. Tannic acid (TA) is reported to be effective against various types of chemically induced toxicity and also carcinogenesis. In the present study, we evaluated the chemopreventive efficacy of TA against DMH induced colon toxicity in a rat model. Efficacy of TA against the colon toxicity was evaluated in terms of biochemical estimation of antioxidant enzyme activities, lipid peroxidation, histopathological changes and expression of early molecular markers of inflammation and tumor promotion. DMH treatment induced oxidative stress enzymes (p<0.001) and an early inflammatory and tumor promotion response in the colons of Wistar rats. TA treatment prevented deteriorative effects induced by DMH through a protective mechanism that involved reduction of oxidative stress as well as COX-2, i-NOS, PCNA protein expression levels and TNF-${\alpha}$ (p<0.001) release. It could be concluded from our results that TA markedly protects against chemically induced colon toxicity and acts plausibly by virtue of its antioxidant, anti-inflammatory and antiproliferative activities.