• 제목/요약/키워드: error cycle

Search Result 461, Processing Time 0.023 seconds

Internal Flow Analysis of Urea-SCR System for Passenger Cars Considering Actual Driving Conditions (운전 조건을 고려한 승용차용 요소첨가 선택적 촉매환원장치의 내부 유동 해석에 관한 연구)

  • Moon, Seong Joon;Jo, Nak Won;Oh, Se Doo;Lee, Ho Kil;Park, Kyoung Woo
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.40 no.3
    • /
    • pp.127-138
    • /
    • 2016
  • Diesel vehicles should be equipped with urea-selective catalytic reduction(SCR) system as a high-performance catalyst, in order to reduce harmful nitrogen oxide emissions. In this study, a three-dimensional Eulerian-Lagrangian CFD analysis was used to numerically predict the multiphase flow characteristics of the urea-SCR system, coupled with the chemical reactions of the system's transport phenomena. Then, the numerical spray structure was modified by comparing the results with the measured values from spray visualization, such as the injection velocity, penentration length, spray radius, and sauter mean diameter. In addition, the analysis results were verified by comparison with the removal efficiency of the nitrogen oxide emissions during engine and chassis tests, resulting in accuracy of the relative error of less than 5%. Finally, a verified CFD analysis was used to calculate the interanl flow of the urea-SCR system, thereby analyzing the characteristics of pressure drop and velocity increase, and predicting the uniformity index and overdistribution positions of ammonia.

Investigating Remotely Sensed Precipitation from Different Sources and Their Nonlinear Responses in a Physically Based Hydrologic Model (다른 원격탐사 센서로 추출한 강우자료의 이질성과 이에 의한 비선형유출반응에 미치는 영향)

  • Oh, Nam-Sun;Lee, Khil-Ha;Kim, Sang-Jun
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.10 s.171
    • /
    • pp.823-832
    • /
    • 2006
  • Precipitation is the most important component to the study of water and energy cycle in hydrology. In this study we investigate rainfall retrieval uncertainty from different sources of remotely sensed precipitation field and then probable error propagation in the simulation of hydrologic variables especially, runoff on different vegetation cover. Two remotely sensed rainfall retrievals (space-borne IR-only and ground radar rainfall) are explored and compared visually and statistically. Then, an offline Community Land Model (CLM) is forced with in situ meteorological data to simulate the amount of runoff and determine their impact on model predictions. A fundamental assumption made in this study is that CLM can adequately represent the physical land surface processes. Results show there are big differences between different sources of precipitation fields in terms of the magnitude and temporal variability. The study provides some intuitions on the uncertainty of hydrologic prediction via the interaction between the land surface and near atmosphere fluxes in the modelling approach. Eventually it will contribute to the understanding of water resources redistribution to the climate change in Korean Peninsula.

Development of a Simulation Program for the Li-Reduction Process of PWR Spent Fuel (PWR 사용후핵연료의 Li 환원과정 모사 프로그램 개발)

  • Lee, Yun-Hee;Shin, Hee-Sung;Jang, Ji-Woon;Kim, Ho-Dong;Yoon, Ji-Sup
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.4 no.4
    • /
    • pp.335-344
    • /
    • 2006
  • In this paper a computer program was developed, which simulates the Li reduction process of PWR spent fuel, and the amount of a produced metal or chloride compound was calculated at the various amount of Li with the program. It establishes a database, which is composed of some characteristics related to a chemical reaction equation and thermodynamic data, and it calculates the transformed rate of PWR spent fuel oxide at the certain amount of Li by using the database as input data. As the results of the performance test of the program, it was validated that the transformed values of oxides, except for $Eu_2O_3$ and $Sm_2O_3$, were almost the same to within about a 6 % error with those calculated by the previous code and that the calculated amount of Li was also exactly consistent with the theoretical one, which is used for a complete reaction of each oxide in a single chemical reaction. A relationship between Li and the transformed metal of each oxide was analyzed on the basis of the quantities calculated with the verified development program. Of the results, when the amount of Li was given to be 250 mole, the 83.73 percentage of $UO_2$ was transformed into U while the remainder was still to be $UO_2$. In addition, it was appeared that the 297 mole of Li was needed to completely convert $UO_2$ into U.

  • PDF

Hexagon-shape Line Search Algorithm for Fast Motion Estimation on Media Processor (미디어프로세서 상의 고속 움직임 탐색을 위한 Hexagon 모양 라인 탐색 알고리즘)

  • Jung Bong-Soo;Jeon Byeung-Woo
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.43 no.4 s.310
    • /
    • pp.55-65
    • /
    • 2006
  • Most of fast block motion estimation algorithms reported so far in literatures aim to reduce the computation in terms of the number of search points, thus do not fit well with multimedia processors due to their irregular data flow. For multimedia processors, proper reuse of data is more important than reducing number of absolute difference operations because the execution cycle performance strongly depends on the number of off-chip memory access. Therefore, in this paper, we propose a Hexagon-shape line search (HEXSLS) algorithm using line search pattern which can increase data reuse from on-chip local buffer, and check sub-sampling points in line search pattern to reduce unnecessary SAD operation. Our experimental results show that the prediction error (MAE) performance of the proposed HEXSLS is similar to that of the full search block matching algorithm (FSBMA), while compared with the hexagon-based search (HEXBS), the HEXSLS outperforms. Also the proposed HEXSLS requires much lesser off-chip memory access than the conventional fast motion estimation algorithm such as the hexagon-based search (HEXBS) and the predictive line search (PLS). As a result, the proposed HEXSLS algorithm requires smaller number of execution cycles on media processor.

Analysis of Spatial Precipitation Field Using Downscaling on the Korean Peninsula (상세화 기법을 통한 한반도 공간 강우장 분석)

  • Cho, Herin;Hwang, Seokhwan;Cho, Yongsik;Choi, Minha
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.11
    • /
    • pp.1129-1140
    • /
    • 2013
  • Precipitation is one of the important factors in the hydrological cycle. It needs to understand accurate of spatial precipitation field because it has large spatio-temporal variability. Precipitation data obtained through the Tropical Rainfall Monitoring Mission (TRMM) 3B43 product is inaccurate because it has 25 km space scale. Downscaling of TRMM 3B43 product can increase the accuracy of spatial precipitation field from 25 km to 1 km scale. The relationship between precipitation and the normalized difference vegetation index(NDVI) (1 km space scale) which is obtained from the Moderate Resolution Imaging Spectroradiometers (MODIS) sensor loaded in Terra satellite is variable at different scales. Therefore regression equations were established and these equations apply to downscaling. Two renormalization strategies, Geographical Difference Analysis (GDA) and Geographical Ratio Analysis (GRA) are implemented for correcting the differences between remote sensing-derived and rain gauge data. As for considering the GDA method results, biases, the root mean-squared error (RMSE), MAE and Index of agreement (IOA) is equal to 4.26 mm, 172.16 mm, 141.95 mm, 0.64 in 2009 and 17.21 mm, 253.43 mm, 310.56 mm, 0.62 in 2011. In this study, we can see the 1km spatial precipitation field map over Korea. It will be possible to get more accurate spatial analysis of the precipitation field through using the additional rain gauges or radar data.

How sun spot activity affects on positioning accuracy?: Case study of solar storm (태양 흑점활동이 측위오차에 미치는 영향: 태양폭풍 사례연구)

  • Yoo, Yun-Ja;Cho, Deuk-Jae;Park, Sang-Hyun
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2011.06a
    • /
    • pp.27-28
    • /
    • 2011
  • A solar flares have the 11-year cycle and release a large energy which may produce coronal mass ejections (CME). The NOAA (National Oceanic and Atmospheric Administration) predicted that the sun spot activity will be maximized in 2013-2014. A strong solar flare can cause the disturbance of global positioning system including various communication of TV, radio broadcasting. The actual solar storm in 1989 caused power outages in Canada during 9 hours and about 600 million people had experienced a blackout. Such a solar storm can shorten the GPS satellite's life span about 5 to 10 years which can be resulted in economic loss considering the amount of multi-billion won. This paper analyzed the recent solar storm of X-class occurred on 15th of February about 10:45 this year that was reached Korea (Bohyun observatory) on 18th of February about 10:30 (local time), and compared with the data of before and after a week. The proton data of 18th of February considered that the solar strom reached on earth showed a fluctuation compared to the data of before and after a week. The positioning results at Daejeon also showed higher positioning error compared to the data of before and after a week results.

  • PDF

Hardware Design of High Performance In-loop Filter in HEVC Encoder for Ultra HD Video Processing in Real Time (UHD 영상의 실시간 처리를 위한 고성능 HEVC In-loop Filter 부호화기 하드웨어 설계)

  • Im, Jun-seong;Dennis, Gookyi;Ryoo, Kwang-ki
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.10a
    • /
    • pp.401-404
    • /
    • 2015
  • This paper proposes a high-performance in-loop filter in HEVC(High Efficiency Video Coding) encoder for Ultra HD video processing in real time. HEVC uses in-loop filter consisting of deblocking filter and SAO(Sample Adaptive Offset) to solve the problems of quantization error which causes image degradation. In the proposed in-loop filter encoder hardware architecture, the deblocking filter and SAO has a 2-level hybrid pipeline structure based on the $32{\times}32CTU$ to reduce the execution time. The deblocking filter is performed by 6-stage pipeline structure, and it supports minimization of memory access and simplification of reference memory structure using proposed efficient filtering order. Also The SAO is implemented by 2-statge pipeline for pixel classification and applying SAO parameters and it uses two three-layered parallel buffers to simplify pixel processing and reduce operation cycle. The proposed in-loop filter encoder architecture is designed by Verilog HDL, and implemented by 205K logic gates in TSMC 0.13um process. At 110MHz, the proposed in-loop filter encoder can support 4K Ultra HD video encoding at 30fps in realtime.

  • PDF

Analysis of Correlation between Construction Business and Insolvency of Construction Company (건설경기와 건설업체 부실화 간의 관계성 분석)

  • Seo, Jeong-Bum;Lee, Sang-Hyo;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.3-11
    • /
    • 2013
  • The changes in construction business have impact on overall operation of construction companies. Poor business of construction companies following a s low industrial cycle could have broader implications and influences on the industry. Since a construction project involves various stakeholders including public organizations, financial institutions and households, a downturn in construction industry might lead to significant economic loss. In this regard, it is meaningful to examine the relationship between changes in construction business cycles and insolvency of construction companies. This study conducts an empirical analysis of the relationship between construction business cycles and how much they affect operation of construction companies. To this end, KMV model was used to estimate probability of bankruptcy, which represents business condition of a construction company. To examine construction business cycles, investment amount for different construction types-residential, non-residential, and construction work-was used as a variable. Based on the investment amount, VECM was applied and the analysis results suggested that construction companies should put priority on diversifying project portfolio. In addition, it was shown that once a construction company becomes unstable in business operation, it is hard to recover even when the market condition turns for the better. This suggests that, to improve business operation of a construction company, internal capacity-building is as important as the market condition and other external circumstances.

Simulation of a Double Effect Double Stage Absorption Heat Pump for Usage of a Low Temperature Waste Heat (저온 폐열 활용을 위한 2중 효용 2단 흡수식 히트펌프 시뮬레이션)

  • Kim, Nae-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7736-7744
    • /
    • 2015
  • Considering the significant waste of industrial energy, effective use of low temperature waste heat is extremely important. In this study, a heat pump cycle with double effect and double stage was realized, which escalates the hot water temperature from $50^{\circ}C$ to $70^{\circ}C$ using $160^{\circ}C$ high temperature heat source and $17^{\circ}C$ low temperature heat source. The steam generated in the first generator condenses in the first condenser generating steam in the second generator. The steam condenses in the second condenser and is provided to the second evaporator. Part of the water out of the second evaporator is supplied to the first evaporator, which evaporates using low temperature waste heat. The evaporated steam enters the first absorber and the second evaporator. The steam out of the second evaporator is absorbed into the solution at the second absorber. The hot water temperature is raised in the second condenser and in the second absorber. Proper flow rates and UA values, which satisfied temperature lift $20^{\circ}C$ and COP 1.6, were deduced through trior and error. The COP increases as the temperature of the high temperature water increases, hot water temperature decreases and flow rate increases, waste water temperature and flow rate increases, solution circulation rate decreases. On the other hand, the temperature rise of the hot water increases as the temperature of the high temperature water increases, hot water temperature increases and flow rate decreases, waste water temperature and flow rate increases, solution circulation rate increases. In addition, the COP and hot water temperature rise increase as UAs of the heat exchangers increase.

Automated Areal Feature Matching in Different Spatial Data-sets (이종의 공간 데이터 셋의 면 객체 자동 매칭 방법)

  • Kim, Ji Young;Lee, Jae Bin
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.24 no.1
    • /
    • pp.89-98
    • /
    • 2016
  • In this paper, we proposed an automated areal feature matching method based on geometric similarity without user intervention and is applied into areal features of many-to-many relation, for confusion of spatial data-sets of different scale and updating cycle. Firstly, areal feature(node) that a value of inclusion function is more than 0.4 was connected as an edge in adjacency matrix and candidate corresponding areal features included many-to-many relation was identified by multiplication of adjacency matrix. For geometrical matching, these multiple candidates corresponding areal features were transformed into an aggregated polygon as a convex hull generated by a curve-fitting algorithm. Secondly, we defined matching criteria to measure geometrical quality, and these criteria were changed into normalized values, similarity, by similarity function. Next, shape similarity is defined as a weighted linear combination of these similarities and weights which are calculated by Criteria Importance Through Intercriteria Correlation(CRITIC) method. Finally, in training data, we identified Equal Error Rate(EER) which is trade-off value in a plot of precision versus recall for all threshold values(PR curve) as a threshold and decided if these candidate pairs are corresponding pairs or not. To the result of applying the proposed method in a digital topographic map and a base map of address system(KAIS), we confirmed that some many-to-many areal features were mis-detected in visual evaluation and precision, recall and F-Measure was highly 0.951, 0.906, 0.928, respectively in statistical evaluation. These means that accuracy of the automated matching between different spatial data-sets by the proposed method is highly. However, we should do a research on an inclusion function and a detail matching criterion to exactly quantify many-to-many areal features in future.