• Title/Summary/Keyword: erection of handrail first

Search Result 1, Processing Time 0.015 seconds

Feasibility Analysis for Introduction of Scaffolding with Advanced Guardrail System to Prevent Falls (비계작업의 추락재해예방을 위한 선행 안전난간 공법의 도입 타당성 분석)

  • Park, J.D.;Moon, S.O.;Lee, H.S.;Jeong, S.C.;Kwon, Y.J.;Jung, K.
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.4
    • /
    • pp.23-31
    • /
    • 2020
  • In the construction sector, there were 99 fatalities from falls associated with steel tube and system scaffolds for three years from 2016 to 2018 and out of which 27.3 percent (27 workers) were found to have occurred during installing and dismantling procedure. To erect scaffolding which is installed for the work at height, the work platforms are generally installed first and the safety guardrails are installed and vice versa to dismantle. As a result, workers are exposed to the risk of falling because they erect and dismantle scaffolding without guardrails. To minimize the risk of falling, it is necessary to study a new construction method that can erect or dismantle scaffolding while guardrails are installed (called advanced guardrail system). This study analyzed advanced guardrail system in terms of safety regulation, workability and economic efficiency by investigating the domestic situation on the use of scaffolding, reviewing domestic and foreign standards for guardrails and conducting economic feasibility study. The results of this study is expected to greatly contribute to preventing falls in scaffolding installation and dismantlement procedure. As a follow-up study, empirical research is required including physical test of scaffolding with advanced guardrail system and effectiveness analysis after trial applications.