• Title/Summary/Keyword: environmental cost

Search Result 3,854, Processing Time 0.029 seconds

친환경 교통수단으로서 KTX의 역할과 기대

  • Bang Yeon-Geun
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.31
    • /
    • pp.19-24
    • /
    • 2006
  • Green gas emissions Trading System(ETS) came into effect in the Europe last year 2005. All transport modes have tried to reduce green gas emission and EU member countries are promoting the use of environmental friendly transport mode to avoid economic loss due to green gas emission. Besides ETS, rapidly rising of oil price and peak oil urge to invest more in the environmental friendly public transport mode and to discourage the use of private cars. The operation of KTX is estimated to bring external cost reduction up to 570 bil. won in 2004 based on European external unit costs of transport modes. This result implies that the expansion of high speed rail network and reconsideration of East-West high speed rail network which is not considered because of weak economic validity is required.

On-line model compensation using noise masking effect for robust speech recognition (잡음 차폐를 이용한 온라인 모델 보상)

  • Jung Gue-Jun;Cho Hoon-Young;Oh Yung-Hwan
    • Proceedings of the KSPS conference
    • /
    • 2003.05a
    • /
    • pp.215-218
    • /
    • 2003
  • In this paper we apply PMC (parallel model combination) to speech recognition system online. As a representative of model based noise compensation techniques, PMC compensates environmental mismatch by combining pretrained clean speech models and real-time estimated noise information. This is very effective approach for compensating extreme environmental mismatch but is inadequate to use in on-line system for heavy computational cost. To reduce the computational cost and to apply PMC online, we use a noise masking effect - the energy in a frequency band is dominated either by clean speech energy or by noise energy - in the process of model compensation. Experiments on artificially produced noisy speech data confirm that the proposed technique is fast and effective for the on-line model compensation.

  • PDF

High MSE wall design on weak foundations

  • Mahmoud Forghani;Ali Komak Panah;Salaheddin Hamidi
    • Geomechanics and Engineering
    • /
    • v.36 no.4
    • /
    • pp.329-341
    • /
    • 2024
  • Retaining structures are one of the most important elements in the stabilization of excavations and slopes in various engineering projects. Mechanically stabilized earth (MSE) walls are widely used as retaining structures due to their flexibility, easy and economical construction. These benefits are especially prominent for projects built on soft and weak foundation soils, which have relatively low resistance and high compressibility. For high retaining walls on weak foundations, conventional design methods are not cost-effective. Therefore, two alternative solutions for different foundation weakness are proposed in this research: optimized multi-tiered MSE walls and single tier wall with foundation improvement. The cost optimization considers both the construction components and the land price. The results show that the optimal solution depends on several factors, including the foundation strength and more importantly, the land price. For low land price, the optimized multi-tiered wall is more economical, while for high land price (urban areas), the foundation improvement is preferable. As the foundation strength decreases, the foundation improvement becomes inevitable.

Comparative Analysis on Unit Price based on Historical Cost Data Estimating for Large and Small-scale Civil Engineering Works (대·소규모 토목공사의 실적공사비 비교 분석)

  • Hong, Sung Ho;Shin, Juyeoul;Kim, Chang Hak;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1707-1718
    • /
    • 2013
  • Historical cost data estimating system has been introduced since 2004 in the construction industry. Based on contract prices of past projects, this estimating system estimates construction cost according to work types. The Korea Institute of Construction Technology (KICT) announces the historical cost data twice a year annually. The unit price of a small construction project is higher than large construction project due to the increase on production cost per work unit, equipment and labor cost, etc. However, the historical cost data estimating system is applied to project estimation uniformly regardless the construction project's size. This study compared and analyzed the historical cost data of large and small construction project to indicate the problem of historical cost date estimating system. The study derived that the unit price of a small construction project is 21.8% higher than that of large construction project.

Optimum Service Life Management Based on Probabilistic Life-Cycle Cost-Benefit Analysis (확률론적 생애주기비용-이익분석 기반 수명관리 최적화 기법)

  • Kim, Sunyong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.4
    • /
    • pp.19-25
    • /
    • 2016
  • Engineering structures including civil infrastructures require a life-cycle cost and benefit during their service lives. The service life of a structure can be extended through appropriate inspection and maintenance actions. In general, this service life extension requires more life-cycle cost and cumulative benefit. For this reason, structure managers need to make a rational decision regarding the service life management considering both the cost and benefit simultaneously. In this paper, the probabilistic decision tool to determine the optimal service life based on cost-benefit analysis is presented. This decision tool requires an estimation of the time-dependent effective cost-benefit under uncertainty to formulate the optimization problem. The effective cost-benefit is expressed by the difference between the cumulative benefit and life-cycle cost of a deteriorating structure over time. The objective of the optimization problem is maximizing the effective cost-benefit, and the associated solutions are the optimal service life and maintenance interventions. The decision tool presented in this paper can be applied to any deteriorating engineering structure.

Probabilistic Analysis of Repairing Cost Considering Random Variables of Durability Design Parameters for Chloride Attack (염해-내구성 설계 변수에 변동성에 따른 확률론적 보수비용 산정 분석)

  • Lee, Han-Seung;Kwon, Seung-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.1
    • /
    • pp.32-39
    • /
    • 2018
  • Repairing timing and the extended service life with repairing are very important for cost estimation during operation. Conventionally used model for repair cost shows a step-shaped cost elevation without consideration of variability of extended service life due to repairing. In the work, RC(Reinforced Concrete) Column is considered for probabilistic evaluation of repairing number and cost. Two mix proportions are prepared and chloride behavior is evaluated with quantitative exterior conditions. The repairing frequency and cost are investigated with varying service life and the extended service life with repairing which were derived from the chloride behavior analysis. The effect of COV(Coefficient of Variation) on repairing frequency is small but the 1st repairing timing is shown to be major parameter. The probabilistic model for repairing cost is capable of reducing the number of repairing with changing the intended service life unlike deterministic model of repairing cost since it can provide continuous repair cost with time.

The Corresponding Plan for Integrated Environment-the Lowest Cost Bid and The Current Cost Estimate System (최저가입찰제 및 실적공사비적산 환경에서의 대응방안)

  • Kim, Byeong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.5D
    • /
    • pp.849-859
    • /
    • 2006
  • Earnings of domestic enterprises are expected a serious damage because the lowest cost bid system and the current cost estimate system. In 2005 average successful bid rate for the lowest cost bid project is below 60%, this is not reach at the operating budget of enterprise. Many problems such as illegal construction, low price subcontract, chain enterprise loss com in to practice because of low successful bid rate. In addition earnings of the enterprises expected to be the minimum, because of enlarge execution of the current cost estimate system. This study tries to lend assistance by giving alternative for the construction enterprise by presenting the bid system, investigate and compare foreign system with domestic and analyze correlation of the lowest cost bid and the current cost estimate system.

Cost Estimation of Intermittent Aerobic Digestion (간헐포기소화의 비용 평가)

  • Kim, Woon Joong;Kim, Seong Hong;Kim, Hee Jun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1B
    • /
    • pp.113-118
    • /
    • 2006
  • Cost estimation of an intermittent aerobic digestion technology was carried out in this study. Aeration ratio is one of the most important design factors and it affects installation and power consumption cost. For the purpose, digestion efficiency was fixed at 35% of SS reduction and the reactor type was assumed a 2-chamber sequencing batch reactor (SBR). Installation cost and power consumption cost were evaluated and converted in terms of present value that could reflect the rate of discount and the rate of economic growth. The lower aeration ratio needs higher installation cost but lower power consumption cost. From the point of only installation cost, conventional aerobic digestion is cheaper than intermittent aerobic digestion. But intermittent aerobic digestion is better economical for more than 10 years of estimated service life. The optimal aeration ratio was dependent on the service life and it was lower as the estimated service life increased. For the 45 years as the service life, the optimal aeration ratio was estimated 0.3 and the total cost was 64% of the conventional aerobic digestion.

ENVIRONMENTAL RISK ASSESSMENT OF CHEMICALS - INDUSTRY APPROACH

  • Jung, Keumhee
    • Proceedings of the Korea Society of Environmental Toocicology Conference
    • /
    • 2001.05a
    • /
    • pp.107-113
    • /
    • 2001
  • Consumer Product compounds are used in homes and disposed in wastewater where they typically receive waste treatment. After treatment, sludge and effluent are released to the environment resulting in the potential exposure of terrestrial and aquatic organisms to these compounds. To ensure the environmental safety of these compounds, the environmental risk posed by chemicals released into the environment must be assessed. A reasonable, consistent and cost-effective method to conduct environmental risk assessments and to prioritize testing of these chemicals is needed which addresses risk to organisms residing in the terrestrial and aquatic compartments of the environment. This paper provides a fundamental understanding of the technical basis of environmental risk assessment using the major surfactant(i.e., LAS) used in the laundry detergent industry worldwide as a case study.

  • PDF

A Study on the RTC romote system of Water Environment for Wireless Network

  • Sung, Kyung
    • Journal of information and communication convergence engineering
    • /
    • v.7 no.4
    • /
    • pp.465-468
    • /
    • 2009
  • There is to solution the environmental data which the importance is seriously taken into consideration in the the 21st century that is set up whether or not be a welfare society advanced country according to quality of life elevations through environments in question to a preferential assignment for an environmental control will decrease of measures, and be proceeded so as to be urgent. However, shall get measurement of a correct environmental pollution duty and reduction measures stopped on bases of the data which there is reliability, and decrease excessive pollution than what, and may overcome efficiency of waste of cost environmental pollution management. Environmental pollution data collected are regarded as important, and, specially, a collection of environmental data forecast a pollution circle, or to analyze future development is important very at an environmental policy decision or decision making step to be national besides pollution reductions.