• Title/Summary/Keyword: environmental construction

Search Result 7,643, Processing Time 0.035 seconds

INVESTMENT EVALUATION OF TRANSPORTATION INFRASTRUTURE PROJECTS USING BINOMIAL REAL OPTION MODEL

  • Qiyu Qian;Xueqing Wang;Charles Y.J. Cheah
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.563-572
    • /
    • 2007
  • Transportation infrastructure is critical to economic growth of a country such as China. Careful evaluation of investments in traffic infrastructure projects is therefore pertinent. As traditional evaluation methods do not consider the uncertainty of future cash flows and mobility during project execution, the real option approach is gradually gaining recognition in the context of valuing construction and infrastructure projects. However, many of the cases only evaluate individual options separately although multiple options often exist in a typical large infrastructure project. Using a highway project in China as a case study, this paper first evaluates a deferment option and a growth option embedded in the project. Subsequently, the values are combined using the fuzzy analytical hierarchy process. It is found that the combined value is less than the sum of the two option values. This finding is consistent with the theoretical observations given in past real option literature despite the use of a different approach.

  • PDF

Applications of Agent-Based Modeling (ABM) in Enhancing Facility Operation and Management

  • Khodabandelu, Ali;Park, JeeWoong
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.393-400
    • /
    • 2022
  • Agent-based modeling (ABM), as a relatively new simulation technique, has recently gained in popularity in the civil engineering domain due to its uniquely advantageous features. Among many civil engineering applications, ABM has been applied to facility operation and management, such as energy consumption management, as well as the enhancement of maintenance and repair processes. The former studies used ABM to manage energy consumption through simulating human energy-related behaviors and their interactions with facilities, as well as electrical, heating, and cooling systems and appliances, while the latter used ABM to enhance maintenance process through facilitating coordination, negotiation, and decision making between facility managers, service providers, and repair workers. The present study aims to provide a short qualitative review on the most recent applications of ABM in the above-mentioned areas. Based on the review and follow-up analysis, the study identifies the advantages, disadvantages, and limitations of ABM applications to facility operation and management, and offers several potential future research topics in the hope of filling the existing literature gaps.

  • PDF

Managing Mega-Project Complexity in Five Dimensions

  • Gransberg, Douglas D.;Jeong, H. David
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.6-9
    • /
    • 2015
  • Traditional project management theory is based on a three-dimensional life cycle approach where the project managerseeks to optimize the dimensions of cost-schedule-technical (quality or design). This paper reports the findings of a case study analysis of two complex mega-projects in Michigan which confirm the findings of previous research and illustrates the use of a framework for five-dimensional project management (5DPM) that is for conceptualizing a complex project's scope of work. The framework elevates the recognition that the project's social/political context and the financial arrangements create complexity adding two new dimensions. This paper also demonstrates a methodology to graphically display a project's complexity to better understand and prioritize the available resources. The result is a "complexity footprint" that may help a complex project manager identify the boundary between controllable and uncontrollable projects impacts. The paper finds that applying 5DPM to the two case study projects has given the project delivery team a tool which is actually adding value to the complex project management process.

  • PDF

Evaluating Slope Greening Construction for Enhanced Sustainability -A Case Study of Sagewood CC, Yeosu Gyeongdo Island- (사면녹화 시공 평가를 통한 개선방안에 관한 기반연구 -세이지우드 CC 여수 경도를 사례로-)

  • Hak-Sung Kim;Sung-Jin Yeom
    • Journal of Environmental Science International
    • /
    • v.32 no.10
    • /
    • pp.703-712
    • /
    • 2023
  • Due to sporadic development projects and Korea's geographical characteristics slopes are inevitable. Consequently, widespread slope greening projects are underway, prioritizing safety and landscape integration. Experimental research is being conducted on slope greening methods and their effects; however, there is a dearth of research on the various conditions resulting from slope greening construction defects. This study examined different conditions and assessed greening methods on real-world sites to understand their correlation with slope greening. Even in the same areas, the state of slope greening varied in different conditions. This underscores the importance of pre-evaluating specific conditions to achieve efficient slope greening results across various conditions. Consequently, there is a need for guidelines and institutional frameworks to assess various conditions in future endeavors.

CRITICAL FACTORS FOR ASSESSMENT OF BIM BASED QUANTITY-TAKE OFF

  • Seong-Ah Kim;Chang-Hee Lee ;Sangyoon Chin;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.7-11
    • /
    • 2011
  • Quantity take-off (QT) is one of the most important tasks for determining the total cost of a construction project, and it requires accuracy and reliability for the result. Accuracy and reliability in BIM-based QT are also required to assure the completeness of the result. However, there has been no basis to measure the completeness of the BIM-based QT result. As BIM is increasingly being adopted in the construction industry with a wide variety of purposes, it becomes more important to have a method to improve the completeness of BIM-based QT and criteria to measure it. This research focuses on the hypothesis that the completeness of BIM-based QT relies on the accuracy and reliability of BIM and the BIM-based QT process. As a basic research to determine the completeness of BIM-based QT, this research analyzes and derives factors that affect the completeness of BIM-based QT.

  • PDF

Hierarchical multiscale modeling for predicting the physicochemical characteristics of construction materials: A review

  • Jin-Ho Bae;Taegeon Kil;Giljae Cho;Jeong Gook Jang;Beomjoo Yang
    • Computers and Concrete
    • /
    • v.33 no.3
    • /
    • pp.325-340
    • /
    • 2024
  • The growing demands for sustainable and high-performance construction materials necessitate a deep understanding of their physicochemical properties by that of these heterogeneities. This paper presents a comprehensive review of the state-of-the-art hierarchical multiscale modeling approach aimed at predicting the intricate physicochemical characteristics of construction materials. Emphasizing the heterogeneity inherent in these materials, the review briefly introduces single-scale analyses, including the ab initio method, molecular dynamics, and micromechanics, through a scale-bridging technique. Herein, the limitations of these models are also overviewed by that of effectively scale-bridging methods of length or time scales. The hierarchical multiscale model demonstrates these physicochemical properties considering chemical reactions, material defects from nano to macro scale, microscopic properties, and their influence on macroscopic events. Thereby, hierarchical multiscale modeling can facilitate the efficient design and development of next-generation construction.

The Life Cycle Assessment of Infrastructure considering Environmental Load;A Case Study of Emergency Spillway for Korean Multipurpose Dam (환경부하량을 고려한 토목시설물 전과정평가;국내 다목적댐 비상여수로 시설 사례연구)

  • Kwun, Suk-Hyun;Kim, Sang-Kywi;Jung, Won-Ji;Kim, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.519-522
    • /
    • 2006
  • This study aims to provide useful information when making a decision for the environmental assessment of infrastructure, based on Life Cycle Assessment(LCA). It estimates environmental load on environmental pollutants that are possible to occur by locations and by types of emergency spillway for Korean multipurpose dam, which is selected as a study case. For this purpose, this study examines the theories of LCA and calculates environmental load on environmental pollutants that generate during life cycle, to apply the suggested infrastructure to the case study of emergency spillway at the multipurpose dam. It also evaluates environmental load of emergency spillway by the estimated result, and draws the optimum alternative that is environmental friendly.

  • PDF

A Study on the improvement of working condition in the downtown Underground construction - Focused on the Ventilation and Lighting - (지하건설공사의 작업환경 개선에 관한 연구 -환기와 조명을 중심으로-)

  • 고성석;안홍섭
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.2
    • /
    • pp.119-132
    • /
    • 1997
  • According to the construction environmental changes due to the trend of large scale and complicated building construction, many construction methods(such as : TOPDOWN )are more often used. However, it is pointed out that occupational pulmonary diseases, reduction of the machinery lifetime and productivity caused to be narrow visual field and collision between the workers. Therefore, this study is mainly dealing with the views of productivity and safety improvement in order to improve work efficiency and to insure the safety in underground construction environment.

  • PDF

AUTOMATED DATA COLLECTION TECHNOLOGY APPLICATIONS IN CONSTRUCTION

  • Ronie Navon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.27-29
    • /
    • 2009
  • Real-time control of on-site construction, based on high quality data, is essential to identify discrepancies between actual and planned performances. Additionally, real-time control enables timely corrective measures to be taken when needed to reduce the damages caused by the discrepancies. The focus of the presentation will be on our work, which uses automated data technologies to collect data needed for real time control.

  • PDF

A STUDY ON THE OPTIMAZATION OF CONSTRUCTION MANAGEMENT BY USING A DESIGN STRUCTURE MATRIX

  • Nobuyuki Suzuki;Aketo Suzuki
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.383-388
    • /
    • 2005
  • In the construction industry, complex works are carried out with significant resources under non-linear circumstances where clear concepts of project management could be of benefit to all parties and personnel involved. In this paper, we define the optimum project management configuration for construction management by using DSM (Design Structure Matrix). Furthermore DSM can be visualized as a network model, and then Graph Theory provides us the numerical results.

  • PDF