Development of Air-Environment management guideline in Building construction process (건설사업추진단계에서의 대기환경 관리지침 개발에 관한 연구 - 군 건설사업 중심으로 -)

  • Na Duk-So;Suh Sang-Wook;Lee Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.376-379
    • /
    • 2004
  • Building construction Is essential part that we get the enjoyment and promote the quality in human life. But construction process itself has an bad effect on environment: air Pollution, water Pollution, soil Pollution ,etc. These day, Air-environment management becomes very important part in Construction because Construction duration delay which is caused by civil petitions related air-environment occurs frequently. For developing the management-guideline of environment management, This study suggests an executive management-guideline based on surveying air-environmental related laws, regulations and literatures, making out important factors. With the management guideline, The Purpose of this study is to make an air-environmental management system through that Process.

  • PDF

A Study on the Traffic Effect Zone and Application of Road Occupying Construction (도로 공사중의 교통영향권역 설정 및 적용성에 관한 연구)

  • Lee, Ju-Ho;Lee, Young-Woo;Lim, Chae-Moon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.6 no.2
    • /
    • pp.131-139
    • /
    • 2003
  • The links operating interrupted flow are intend to yield the traffic between the out flow and inflow part effect zone of street section, we build the delay model using the time gap between under construction and not. We review the applicability of interrupted flow, and thus we can put this data to practical use as the basis data to compute the inducement charge for traffic delay. Also building about traffic effect zone of interrupted flow wouldn't produce at the section beside occupying roads and construction cross section, thus we must review the plan to minimize traffic delay by the construction occupying road. In future there must be advanced the incomplete in this study, and groping for the various alternatives to minimize the traffic delay by the road occupying construction, with developing the various sets of detailed analyzing models, that is analysis on the street strength, crossroads geometrical forms of crossroads, public traffics, pedestrians, occupying types.

  • PDF

Analysis of Flow Duration Based on SWAT-K Simulation for Construction of Natural Riparian (자연하안조성을 위한 SWAT-K 모의치 기반 유황 분석)

  • Kim, Nam-Won;Lee, Jeong-Woo;Chung, Il-Moon;Kim, Ji-Tae
    • Journal of Environmental Science International
    • /
    • v.20 no.11
    • /
    • pp.1457-1464
    • /
    • 2011
  • In this study, the method of estimating hydrologic information (water depth, submerged period etc.) on the proper selection of construction point and scale as well as vegetation type suggested for the design of natural riparian rehabilitation structure. Long-term comprehensive watershed model SWAT-K(Korea) was applied to this purpose. Flow duration analysis was conducted to analyze the hydrologic characteristics of Pyungchang watershed at which the 'bangtul' construction method was tested. For this purpose 20 years (1989-2008) rainfall runoff analysis was carried out. Based on the simulated daily streamflow data, flow duration curve was made to analyze the flow characteristics, and the water depth hydrograph was made to analyze the water depth distribution at the cross section. Finally, the information for the selection of proper vegetation according to the submerged period is suggested.

Lessons Learned during the Early Phases of a Modular Project: A Case Study of UNLV's Solar Decathlon 2020 Project

  • Choi, Jin Ouk;Lee, Seungtaek;Weber, Eric
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.543-550
    • /
    • 2022
  • The U.S. Department of Energy conducts the Solar Decathlon competition as a student-based achievement that encourages sustainable design with energy efficiency and solar energy technologies. In the 2020 competition, the University of Nevada, Las Vegas (UNLV) team designed, fabricated, and constructed a net-zero modular house that applies innovative and highly efficient building technologies. This paper focused on the lessons learned during the early phases of this ongoing modular project. The research methodology included obtaining feedback from key project participants using a well-structured questionnaire. The results showed that the major items/challenges in the project's planning phase included selecting the modular size, planning the construction system, planning the materials and procurement, estimating costs and duration, selecting a fabricator, collaboration and communication, safety, and planning module transportation. These findings will help modular practitioners and future Solar Decathlon competition participants better understand how and what factors they should consider most during the early phases through the lessons learned.

  • PDF

THREE-STAGED RISK EVALUATION MODEL FOR BIDDING ON INTERNATIONAL CONSTRUCTION PROJECTS

  • Wooyong Jung;Seung Heon Han
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.534-541
    • /
    • 2011
  • Risk evaluation approaches for bidding on international construction projects are typically partitioned into three stages: country selection, project classification, and bid-cost evaluation. However, previous studies are frequently under attack in that they have several crucial limitations: 1) a dearth of studies about country selection risk tailored for the overseas construction market at a corporate level; 2) no consideration of uncertainties for input variable per se; 3) less probabilistic approaches in estimating a range of cost variance; and 4) less inclusion of covariance impacts. This study thus suggests a three-staged risk evaluation model to resolve these inherent problems. In the first stage, a country portfolio model that maximizes the expected construction market growth rate and profit rate while decreasing market uncertainty is formulated using multi-objective genetic analysis. Following this, probabilistic approaches for screening bad projects are suggested through applying various data mining methods such as discriminant logistic regression, neural network, C5.0, and support vector machine. For the last stage, the cost overrun prediction model is simulated for determining a reasonable bid cost, while considering non-parametric distribution, effects of systematic risks, and the firm's specific capability accrued in a given country. Through the three consecutive models, this study verifies that international construction risk can be allocated, reduced, and projected to some degree, thereby contributing to sustaining stable profits and revenues in both the short-term and the long-term perspective.

  • PDF

Prospects of Bidding System in Mechanical Construction Field due to Environmental Change in Construction Production Processes (건설생산체계의 환경 변화에 따른 기계설비분야 발주시스템 변화 전망)

  • Kang, Byung-Ha;Kim, Kyung-Rae
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.1104-1111
    • /
    • 2009
  • Mechanical facilities in modern buildings and industrial plants become more important in the view points of energy and environment issues. However, mechanical construction fields are still considered as to be subjected to buildings, even though design and construction of mechanical fields in the construction production process is independent of other fields. Recently, 'Framework Act on the Construction Industry' has been revised since 2007. According to the revision, the barrier of general construction and specialized construction is collapsed and the construction company can register any type of construction classification if they are able to carry out the construction mission. The mechanical construction fields are exempt until 2011 because of the protection of mechanical construction industry. In the present study, the bidding system has been prospected due to the revision of 'Basic Law on Construction Industry' after 2011. The trends for development of mechanical construction fields has been also discussed.

  • PDF

A Profit Prediction Model in the International Construction Market - focusing on Small and Medium Sized Construction Companies (CBR을 활용한 해외건설 수익성 예측 모델 개발 - 중소·중견기업을 중심으로 -)

  • Hwang, Geon Wook;Jang, woosik;Park, Chan-Young;Han, Seung-Heon;Kim, Jong Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.50-59
    • /
    • 2015
  • While the international construction industry for Korean companies have grown in market size exponentially in the recent years, the profit rate of small and medium sized construction companies (SMCCs) are incomparably lower than those of large construction companies. Furthermore, small and medium size companies, especially subcontractor, lacks the judgement of project involvement appropriateness, which leads to an unpredictable profit rate. Therefore, this research aims to create a profit rate prediction model for the international construction project focusing on SMCCs. First, the factors that influence the profit rate and the area of profit zone are defined by using a total of 8,637 projects since the year 1965. Seconds, an extensive literature review is conducted to derive 10 influencing factors. Multiple regression analysis and corresponding judgement technique are used to derive the weight of each factor. Third, cased based reasoning (CBR) methodology is applied to develop the model for profit rate analysis in the project participation review stage. Using 120 validation data set, the developed model showed 11% (14 data sets) of error rate for type 1 and type 2 error. In utilizing the result, project decision makers are able to make decision based on authentic results instead of intuitive based decisions. The model additionally give guidance to the Korean subcontractors when advancing into the international construction based on the model result that shows the profit distribution and checks in advance for the quality of the project to secure a sound profit in each project.

Golf Course Construction at an Abandoned Lime Mine - Case Study of the Ostar Danyang Golf Course - (석회석 폐광산 지역을 활용한 골프코스 건설 -오스타 단양 골프코스의 사례연구-)

  • Lee, Kwang-Jae;Park, Tae-Youn;Joo, Young-Kyoo
    • Asian Journal of Turfgrass Science
    • /
    • v.24 no.2
    • /
    • pp.218-224
    • /
    • 2010
  • The purpose of this case study is to analyze the environmental and sociological impacts on a golf course construction at the damaged area of a previous limestone mine. Due to a long term of the open-pit mining, that site had been abandoned with geographical and ecological destruction before it was renovated to Ostar Danyang public golf course. This study is focused on the review of restoring the ecosystem through golf course construction procedures. Literature surveys of restoration through golf course construction in Japan and Canada were analyzed the procedure of utilization of previously existed lime mine. The sociological and environmental changes before and after construction were compared and analyzed. Environmental impacts on geographical, animal and plant ecology, and water quality were not affected or significantly improved after golf course construction from the mining site existed before. The local economy was also improved by increasing employment of resident and tax payment to local government. The construction of golf course could be one of the typical alternatives of ecological restoration of abandoned lime mine. Moreover in this project, minimizing the environmental impacts on surrounding ecosystem was emphasized by a larger size of developing construction. The harmonious lay-out on nature and artificial landscape were also considered a very first stage of construction procedure.

A Comparative Study of Flora and Vegetation Change before and after Forest Road Construction in the Research Site of Minjujisan (임도개설 전·후 식물상 및 식생변화 비교 연구 - 민주지산을 중심으로 -)

  • Han, Seung Woo;Kweon, Hyeong Keun;Lee, Sang Myong;Kim, Hyoun Sook;Lee, Joon Woo
    • Korean Journal of Environment and Ecology
    • /
    • v.32 no.4
    • /
    • pp.392-412
    • /
    • 2018
  • This study was conducted from 2012, which was a year before forest road construction in Minjujisan, to 2015 to verify effects on flora and vegetation change annually before and after the construction, and to provide strategies to examine and manage flora changes. The plant communities in the investigated area around the forest road is separated by the slopes into Quercus mongolica community is on the northwestern slope and Quercus variabilis and Larix kaempferi communities is on the southwestern slope. The annual investigation of flora change before and after the construction showed that there were 209 taxa that had 71 families, 153 genera, 178 species, 27 varieties, and 4 forma in 2015 while there were 66 taxa that had 44 families, 59 genera, 51 species, 13 varieties, and 2 forma in 2012 before the construction, indicating an increase of 143 texa before and after the construction. The investigation of the slope area adjacent to the forest road constructed in 2013, in particular, showed increasing coverage and taxa each year after the construction. This was caused by significantly increased light transmittance after the construction. The investigation in 2015 showed increased coverage of herbaceous layer the year after development of the forest road and the remarkable increase of the coverage of shrub layer in 2015. Further, the coverage on the slope adjacent to the forest road increased more in 2015 than in 2013 and 2014. Therefore, we expect supplementary studies will help to generate a detail manual on flora and vegetation change before and after forest road construction.

The Application of Fuzzy Logic to Assess the Performance of Participants and Components of Building Information Modeling

  • Wang, Bohan;Yang, Jin;Tan, Adrian;Tan, Fabian Hadipriono;Parke, Michael
    • Journal of Construction Engineering and Project Management
    • /
    • v.8 no.4
    • /
    • pp.1-24
    • /
    • 2018
  • In the last decade, the use of Building Information Modeling (BIM) as a new technology has been applied with traditional Computer-aided design implementations in an increasing number of architecture, engineering, and construction projects and applications. Its employment alongside construction management, can be a valuable tool in helping move these activities and projects forward in a more efficient and time-effective manner. The traditional stakeholders, i.e., Owner, A/E and the Contractor are involved in this BIM system that is used in almost every activity of construction projects, such as design, cost estimate and scheduling. This article extracts major features of the application of BIM from perspective of participating BIM components, along with the different phrases, and applies to them a logistic analysis using a fuzzy performance tree, quantifying these phrases to judge the effectiveness of the BIM techniques employed. That is to say, these fuzzy performance trees with fuzzy logic concepts can properly translate the linguistic rating into numeric expressions, and are thus employed in evaluating the influence of BIM applications as a mathematical process. The rotational fuzzy models are used to represent the membership functions of the performance values and their corresponding weights. Illustrations of the use of this fuzzy BIM performance tree are presented in the study for the uninitiated users. The results of these processes are an evaluation of BIM project performance as highly positive. The quantification of the performance ratings for the individual factors is a significant contributor to this assessment, capable of parsing vernacular language into numerical data for a more accurate and precise use in performance analysis. It is hoped that fuzzy performance trees and fuzzy set analysis can be used as a tool for the quality and risk analysis for other construction techniques in the future. Baldwin's rotational models are used to represent the membership functions of the fuzzy sets. Three scenarios are presented using fuzzy MEAN, AND and OR gates from the lowest to intermediate levels of the tree, and fuzzy SUM gate to relate the intermediate level to the top component of the tree, i.e., BIM application final performance. The use of fuzzy MEAN for lower levels and fuzzy SUM gates to reach the top level suggests the most realistic and accurate results. The methodology (fuzzy performance tree) described in this paper is appropriate to implement in today's construction industry when limited objective data is presented and it is heavily relied on experts' subjective judgment.