도심이 과밀화됨에 따라 재건축 및 재개발의 활성화, 대규모 택지개발에 의한 신도시 개발, 사회기반시설 확충 등으로 건설폐기물이 급증하고 있다. 이와 더불어 도심지내 공사장 등에 의한 소음, 진동 및 분진 발생원이 지속적으로 증가하고 다양화됨에 따라 이와 관련된 환경 분쟁 및 민원이 급증하고 있는 추세이다. 이에 따라 정부는 생활주변의 정온한 환경을 조성하기 위하여 가까운 미래에 각종관련기준을 상향 적용할 계획이며, 결과적으로 건설공사관련 환경 분쟁 및 민원의 발생이 더욱 증가할 것으로 예상된다. 따라서 본 연구에서는 현장파쇄시설을 운영하고 있는 현장에서의 소음, 진동, 분진 발생량을 측정하고 분석하여, 현장파쇄시설에서 발생되는 환경민원발생 예방측면에서 대책을 마련하여 건설폐기물의 현장재활용 활성화를 위한 기초 자료를 제시하고자 한다.
The objective of the study is to produce preferential impact assessment factors for Environmental Impact Assessment by considering regional features and public participation in the initial stages of EIA. In order to produce preferential impact assessment factors, the study was carried out through theoretical research and a survey of public awareness as a ways to reflect public participation based on theoretical research. The survey of public awareness was conducted in the form of an interview to review the impact which the construction of atomic power plants at Hyo-am village, Jang-an, Kyungsang Province and Bi-hak village, Suhsang-myon, Ulsan-Kun will have on the surrounding environment: to reflect public participation on deciding preferential assessment: and to determine the extent of alternatives of the proposed project. As the result of the study, the following were identified as preferential assessment factors in the settlement and surrounding areas cultivation marine products, change of temperature of seawater due to flow of warm water, land use(negative), noise vibration during construction, existing plants, erosion accumulation, influx of manpower for construction(negative), recreation landscaping during construction and operation, change in flow of transportation during construction, the quality of seawater during construction and operation were produced as preferential assessment factors in both settlement area and neighboring areas. In the settlement area, the educational environment(negative & positive) and positive aspects of the influx of manpower for construction were also identified as preferential assessment factors.
The objective of the study is to produce preferential impact assessment factors for Environmental Impact Assessment by considering regional features and public participation in the initial stages of EIA. In order to produce preferential impact assessment factor, the study was carried out through theoretical research and a survey of public awareness as way to reflect public participation based on theoretical research. The survey of public awareness was conducted in the form of an interview to review the impact which the construction of atomic power plants at Hyo-am village, Jang-an, Kyungsang Province and Bi-hak village, Suhsang-myon, Ulsan-Kun will have on the surrounding environment : to reflect public participation on deciding preferential assessment: and to determine the extent of alternatives of the proposed project. As the result of the study, the followings were identified as preferential assessment factors in the displacing settlement and surrounding areas: cultivation marine products, change of temperature of seawater due to flow of warm water, land use (negative), noise vibration during construction, existing vegetations, erosion sedimentation, influx of manpower for construction(negative), recreation landscaping during construction and operation, change in flow of transportation during construction, the quality of seawater during construction and operation were produced as preferential assessment factors in both displacing area and neighboring areas. In the displacing settlement area, the educational environment(negative & positive) and positive aspects of the influx of manpower for construction were also identified as preferential assessment factors.
도심의 과밀화 등으로 재건축 및 재개발의 활성화, 대규모 택지개발에 의한 신도시 개발, 사회기반시설 확충 등의 증가로 건설폐기물이 급증과 더불어 도심지내 공사장 등에 의한 소음 발생원이 지속적으로 증가하고 다양화됨에 따라 소음${\cdot}$진동관련 환경 분쟁 및 민원이 급증하고 있는 추세이다. 이에 따라 정부는 생활주변의 정온한 환경을 조성하기 위하여 2009년 1월부터 공사장소음규제기준을 현재 70dB에서 65dB로 상향 적용하여 건설공사 관련 환경분쟁 및 민원의 발생이 더욱 증가할 것으로 예상된다. 본 연구에서는 1) '건설공사장 간이 소음 예측 프로그램'을 통한 현장파쇄시설의 소음레벨 예측값과 현장에 설치운영중인 현장파쇄시설의 실측 소음레벨을 비교${\cdot}$분석하여 현장파쇄시설의 소음레벨을 분석하였다. 2) 건설공사 현장에서 현장파쇄시설을 적용하고자 할 경우 소음에 의한 환경 분쟁 및 민원 발생의 최소화 방안을 수립하고자 한다.
Harim Kim;Heejae Ahn;Sebeen Yoon;Taehoon Kim;Thomas H.-K. Kang;Young K. Ju;Minju Kim;Hunhee Cho
Computers and Concrete
/
제33권5호
/
pp.535-544
/
2024
In the rapidly advancing landscape of computer vision (CV) technology, there is a burgeoning interest in its integration with the construction industry. Camera calibration is the process of deriving intrinsic and extrinsic parameters that affect when the coordinates of the 3D real world are projected onto the 2D plane, where the intrinsic parameters are internal factors of the camera, and extrinsic parameters are external factors such as the position and rotation of the camera. Camera pose estimation or extrinsic calibration, which estimates extrinsic parameters, is essential information for CV application at construction since it can be used for indoor navigation of construction robots and field monitoring by restoring depth information. Traditionally, camera pose estimation methods for cameras relied on target objects such as markers or patterns. However, these methods, which are marker- or pattern-based, are often time-consuming due to the requirement of installing a target object for estimation. As a solution to this challenge, this study introduces a novel framework that facilitates camera pose estimation using standardized materials found commonly in construction sites, such as concrete forms. The proposed framework obtains 3D real-world coordinates by referring to construction materials with certain specifications, extracts the 2D coordinates of the corresponding image plane through keypoint detection, and derives the camera's coordinate through the perspective-n-point (PnP) method which derives the extrinsic parameters by matching 3D and 2D coordinate pairs. This framework presents a substantial advancement as it streamlines the extrinsic calibration process, thereby potentially enhancing the efficiency of CV technology application and data collection at construction sites. This approach holds promise for expediting and optimizing various construction-related tasks by automating and simplifying the calibration procedure.
The railway project is an essential green transportation tool that is considered suitable for the domestic and foreign policy direction of carbon neutrality, but there are some limitations, such as damaging important carbon absorption sources during construction. This study analyzed the environmental impact assessment related to carbon absorption sources of greenhouse gas evaluation items conducted during the railway project, and limitations and implications were derived. The analysis of environmental impact assessment guidelines related to railway projects and carbon absorption sources dealt with prediction and reduction methods related to carbon absorption sources, but guidelines, including environmentally friendly railway construction guidelines, lacked descriptions. Since the greenhouse gas environmental impact assessment, 83 railway project environmental impact assessments have been reviewed, but in some cases, carbon absorption-related predictions have not been implemented, or carbon absorption-related reduction measures have been insufficient. In addition, there were cases where there was a limit to calculating emissions and reduction or where the reduction value was insignificant compared to emissions. In order to supplement the environmental impact assessment in the field of carbon absorption sources related to railway construction projects, alternatives such as quantitative emission and low reduction calculation, review of the no net loss system using the total environmental resource system, and linkage with climate change impact assessment are needed.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.516-520
/
2011
Corporate social responsibility (CSR) is of increasing interest to both industry practitioners and academics because of increasing public awareness of environmental, economic and social sustainability. The last decade witnessed a large number of studies on the development of CSR principles and the implementation of CSR in various industries such as the mining industry, oil industry and food industry. However, there is limited number of CSR studies focusing on the construction industry. Considering the critical role the construction industry plays in achieving economic, social and environmental sustainability, it is imperative to extend the current CSR research to the construction sector. This paper provides a critical review of literature related to corporate social responsibility in construction context. A special focus is placed on the current practice adopted by the industry to be socially responsible. A research agenda is set up to tackle this critical issue.
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.459-467
/
2011
Construction errors can have significant effects on project performance. Yet, any attempt to tackle error should be driven by the ability to understand its archetypal nature. This study aims to analyze a variety of construction errors at the execution stage, in order to develop a comprehensive set of categories that shall provide insights about the effect of different error types on the industry. We investigate a database provided by an authoritative source, which includes a number of 256 construction errors that occurred in the year 2009 in Dubai construction industry. Results from this study reveal that the most common error arose from 'poor workmanship' which accounted for 21% of the total encountered faults. The next most common types arose from the 'usage of impaired materials', followed by the 'deviation from an intended dimension'. These observations infer that the majority of construction errors are driven by workers' lack of skill or competence. Moreover, it suggests that execution-oriented errors are the major cause of faults and accidents rather than design errors.
21세기 들어서 지구는 기후변화로 인한 위기를 극복하기 위해서 탄소배출량을 줄이기 위한 노력을 지속하고 있다. 시공과정에서 환경부하량을 많이 배출하는 대표적인 산업인 건설산업에서도 환경부하량을 줄여나가는 노력을 적극적으로 하여야 한다. 건설시설물 계획단계에서부터 환경부하량을 적게 배출하기 위한 노선선정, 구조형식선정 등 환경부하량을 고려한 계획이 적용되어야 한다. 하지만 환경부하량은 투입자원량에 근거하여 산정할 수 있는데 계획단계에서는 공사물량 정보가 부족하여 환경부하량의 정확한 산정이 어려운 실정이다. 본 연구는 IPC 거더교를 대상으로 계획단계에서 환경부하량 추정모델에 활용하기 위한 환경부하량 영향 요인을 선정하기 위한 연구이다. 계획단계에서 활용할 수 있는 정보목록 중 환경부하량과 관련이 있는 특성정보를 전과정 평가(Life Cycle Assessment, LCA), 상관분석, 주성분 분석과 전문가 의견을 반영하여 선정하였다. 선정된 계획단계 정보 목록은 경간길이, 교량연장 등 10개이며 추후 환경부하량 추정모델 개발 시 유용한 기초자료로 사용될 것으로 기대된다.
최근 건설 계획이 증가함에 따라 건물 신축과 건물 폐기에 의한 건설 폐기물이 빠르게 증가하고 있다. 이로 인한 문제점으로 신축에 의해 발생되는 건설 폐기물의 처리를 매립에 대부분 의존하고 있기 때문에 환경오염 문제가 발생과 환경 단체의 반대에 천연골재 채취를 제한하고 있어서 건설업계에서 골재 부족문제가 대두되었다. 따라서 연구 단체에서는 이 두 가지 문제에 대한 해결방안으로 순환골재가 제시되고 있다 하지만 건설 현장에서는 거의 사용되지 않고 있다 이에 본 연구에서는 순환골재가 사용되지 않는 이유를 경제적인 면, 제도적인 면, 기술적인 면으로 분석하고 각 측면에서 순환골재의 활용화 방안에 대해 제시하고자 한다. 이를 통해 골재부족 문제해결과 폐기물의 매립에 의한 환경오염의 경감을 기대할 수 있을 것이다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.