• 제목/요약/키워드: engineering site

Search Result 7,649, Processing Time 0.036 seconds

Analysis of Site Amplification of Seismic Stations using Odesan Earthquake (오대산지진 자료를 이용한 국내 지진관측소 부지의 지반증폭특성 연구)

  • Kim, Jun-Kyoung
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.13 no.1
    • /
    • pp.27-34
    • /
    • 2009
  • Site amplification should be considered in order to estimate Soil-Structure Interaction (SSI), seismic source and attenuation parameters with a greater degree of reliability. The horizontal to vertical (H/V) ratio technique, originally proposed by Nakamura (1989), has been applied to analyze the surface waves in microtremor records. Recently, its application has been extended to the shear wave energy of strong motion in order to study the site transfer function. The purpose of this paper is to estimate the H/V spectral ratio using the observed data from 9 seismic stations distributed within the Southern Korean Peninsula, from the Odesan earthquake (2007/01/20). The results show that most of the stations have more stable amplification characteristics in a low frequency band than in a high frequency band. However, each seismic station showed its own characteristic resonant frequency and low and high frequency. The resonant frequency at each station should be estimated carefully, because the quality of seismic data is dependent on the resonant frequency. It can be obtained more reliable results of seismic source and attenuation parameters, if seismic ground motions which deconvolved from site transfer function is used. The site amplification data from this study can be used to generally classify the sites within the Southern Korean Peninsula.

Study of Sensor Technology Analysis and Site Application Model for 3D-based Global Modeling of Construction Field (건설 시공현장의 3D기반 광대역 모델링을 위한 Sensor 기술 분석과 향후 현장적용 모델 연구)

  • Kwon, Hyuk-Do;Koh, Min-Hyeok;Yoon, Su-Won;Kwon, Soon-Wook;Chin, Sang-Yoon;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.938-942
    • /
    • 2007
  • The importance of process improvement under construction has arisen from recent issue, lower productivity in the construction site. The various 3D modeling program is utilized in the procedure of construction as an alternative solution. However, it's still shortage of the consideration about a specific technical application. The purpose of the study in this paper is helpful to improve the productivity of construction site using 3D realization of constructing place as one of extensive modeling technologies, which leads to not only efficient management of construction site allowing people to check the real time situation in the place but also the revitalization of information flow about building process control and prgress, Therefore, I research into modeling algorithm and extensive construction site realization technology. 3D realization of building place would reduce the safety concerns by providing the real time information about construction site, and it could help to access easily to similar project through collecting and appling the database of sites. Furthermore it can be an opportunity to develop the procedure of production in construction industry and to upgrade the image of this field.

  • PDF

An Analysis of the Economy of Scale for Domestic On-site Hydrogen Fueling Stations (국내 분산형 수소충전소의 규모의 경제성 분석)

  • Gim, Bong-Jin;Kim, Jong-Wook
    • Journal of Energy Engineering
    • /
    • v.16 no.4
    • /
    • pp.170-180
    • /
    • 2007
  • This paper deals with the economy of scale for domestic on-site hydrogen stations fueled with natural gas and naptha. We evaluate the economic feasibility of on-site hydrogen stations with hydrogen production capacities of $30Nm^3/hr,\;100Nm^3/hr\;and\;300Nm^3/hr$. We build a classical economic feasibility model and we make some sensitivity analyses by changing the values of input factors such as the hydrogen sale price and the discount rate. The estimated hydrogen prices of steam methane reforming stations with production capacities of $30\;Nm^3/hr,\;100\;Nm^3/hr\;and\;300\;Nm^3/hr$ are 18,472 won/kg, 10,689 won/kg and 7,758 won/kg, respectively. Also, the hydrogen prices are about the same if we use naptha as a raw material for hydrogen energy instead of natural gas. It turns out that small and medium size domestic on-site hydrogen stations will not be economical in the near future. This indicates that we need to construct large scale on-site hydrogen fueling stations even for the initial phase of the hydrogen economy.

Determination of the Optimal Height using the Simplex Algorithm in Network-RTK Surveying (Network-RTK측량에서 심플렉스해법을 이용한 최적표고 결정)

  • Lee, Suk Bae;Auh, Su Chang
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.24 no.1
    • /
    • pp.35-41
    • /
    • 2016
  • GNSS/Geoid positioning technology allows orthometric height determination using both the geoidal height calculated from geoid model and the ellipsoidal height achieved by GNSS survey. In this study, Network-RTK surveying was performed through the Benchmarks in the study area to analyze the possibility of height positioning of the Network-RTK. And the orthometric heights were calculated by applying the Korean national geoid model KNGeoid13 according to the condition of with site calibration and without site calibration and the results were compared. Simplex algorithm was adopted for liner programming in this study and the heights of all Benchmarks were calculated in both case of applying site calibration and does not applying site calibration. The results were compared to Benchmark official height of the National Geographic Information Institute. The results showed that the average value of the height difference was 0.060m, and the standard deviation was 0.072m in Network-RTK without site calibration and the average value of the height difference was 0.040m, and the standard deviation was 0.047m in Network-RTK with the application of the site calibration. With linearization method to obtain the optimal solution for observations it showed that the height determination within 0.033m was available in GNSS Network-RTK positioning.

A Study on safety improvement of Underground wall construction to Design for Safety (설계안전성검토를 통한 지하외벽공사의 안전개선 연구)

  • Ji, Kyung-Hwan;Choi, Byong-Jeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.4
    • /
    • pp.56-68
    • /
    • 2019
  • Safety-conscious design on site is required for site constructions because of the introduction of the design for safety, but it still leaves much to be desired. This study compared the site where the design was applied and the site where it was not applied. The applied case examined the underground wall construction during frame construction, which corresponds to the skeleton of the building construction. The underground wall construction is quite risky due to the exposure to exterior environments and involvement of various stages, such as scaffolding, formwork, reinforcing work, and concrete casting work. Therefore, the risk factors for each stage were identified and a risk assessment was carried out to select an alternative method to reduce the risk. The risk factors of the selected alternative construction method were also identified and a risk assessment was conducted. The risk assessment weight was calculated by comparing the site where the construction method was applied and the site where it was not, explaining the necessity of the design for safety in reducing the risk. In addition, an actual case where an alternative construction method was used was studied to highlight the necessity for a design for safety.

Seismic Risk Assessment on Buried Electric Power Tunnels with the Use of Liquefaction Hazard Map in Metropolitan Areas (액상화 재해지도를 이용한 수도권 전력구 매설지반의 지진시 위험도 평가)

  • Baek, Woohyun;Choi, Jaesoon
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.1
    • /
    • pp.45-56
    • /
    • 2019
  • In this study, the seismic risk has been evaluated by setting the bedrock acceleration to 0.154g which, was taking into consideration that the earthquake return period for the buried electric power tunnels in the metropolitan area to be 1,000 years. In this case, the risk assessment during the earthquake was carried out in three stages. In the first stage, the site classification was performed based on the site investigation data of the target area. Then, the LPI(Liquefaction Potential Index) was applied using the site amplification factor. After, candidates were selected using a hazard map. In the second stage, risk assessment analysis of seismic response are evaluated thoroughly after the recalculation of the LPI based on the site characteristics from the boring logs around the electric power area that are highly probable to be liquefied in the first stage. The third Stage visited the electric power tunnels that are highly probable of liquefaction in the second stage to compensate for the limitations based on the borehole data. At this time, the risk of liquefaction was finally evaluated based off of the reinforcement method used at the time of construction, the application of seismic design, and the condition of the site.

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

Integrated Sensing Module for Environmental Information Acquisition on Construction Site (건설현장 환경정보 수집을 위한 통합 센싱모듈 개발)

  • Moon, Seonghyeon;Lee, Gitaek;Hwang, Jaehyun;Chi, Seokho;Won, Daeyoun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.1
    • /
    • pp.85-93
    • /
    • 2024
  • The monitoring of environmental information (e.g. noise, dust, vibration, temperature, humidity) is crucial to the safe and sustainable operation of a construction site. However, commercial sensors exhibit certain drawbacks when applied on-site. First, the installation cost is prohibitively high. Second, these sensors have been engineered without considering the rugged and harsh conditions of a construction site, resulting in error-prone sensing. Third, construction sites are compelled to allocate additional resources in terms of manpower, expenses, and physical spaces to accommodate individual sensors. This research developed an integrated sensing module to measure the environmental information in construction site. The sensing module slashes the installation cost to 3.3%, is robust enough to harsh and outdoor sites, and consolidates multiple sensors into a single unit. The sensing module also supports GPS, LTE, and real-time sensing. The evaluation showed remarkable results including 97.5% accuracy and 99.9% precision in noise measurement, an 89.7% accuracy in dust measurement, and a 93.5% reliability in data transmission. This research empowers the collection of substantial volumes and high-quality environmental data from construction sites, providing invaluable support to decision-making process. These encompass objective regulatory compliance checking, simulations of environmental data dispersion, and the development of environmental mitigation strategies.