• Title/Summary/Keyword: engineering site

Search Result 7,646, Processing Time 0.041 seconds

The Case Study on the Erection Method of Large Span Structures (대공간 건축물 Erection 공법에 관한 사례 조사 연구)

  • Jung, Hwan-Mok;Lee, Seong-Yeun;Jee, Suck-Won
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.2 s.24
    • /
    • pp.97-104
    • /
    • 2007
  • Recently, the demand of the large span structures has been increasing. The large span structures include such a large scaled structures such as: the shell structure, the space frame structure, the membrane structure and the cable structure, etc. The large span structures are supposed to be confirmed and issued carefully at the initial process of the design besides the construction engineering aspects because of the structural specific cause that should solve and accomodate those large and wide space without columns. In the field of the large span structure construction, the erection construction method has been regarded as a major affected aspects on the construction cost, construction term, and stability. In the field of the large span structure construction, there are various construction method and system could be applied depends on the condition of the construction site and other circumstances such a major construction method as: the element method, the block method, the sliding method, the lift-up method and complexed method, etc. In this study, as the case study of the erection construction method of the large span structures, after survey and study that those existing large span structures construction cases which had applied and adopted the election construction method and analysis and classify into the Uoups by the size, span, ceiling height, structural system in odor to supply and suggest the data for the enhancement and development in the field of the erection construction method as a efficient structural solution of the large span structure construction.

  • PDF

Installation Technology and Behavior of Silty Clay Filled Geotextile Tube (실트질 점토 채움 시 지오텍스타일 튜브의 거동 및 시공 방법에 관한 연구)

  • Shin, Eun-Chul;Oh, Young-In
    • Journal of the Korean Geosynthetics Society
    • /
    • v.1 no.1
    • /
    • pp.13-21
    • /
    • 2002
  • Geotextile tubes hydraulically or mechanically filled with dredged materials have been applied in hydraulic and coastal engineering in recent years(detached breakwater, groins and jetty). The geotextile tubes are made of sewn geosynthetics sheets. If the sandy soil is use to fill material, these inlets should be spaced closely to assure uniform filling of the tubes because sandy soil and geosynthetic is very pervious. However, the clayey soil or contaminated slurry is used, the inlets can be located relatively long distance. The fine clayey particles tend to rapidly blind the fabric slowing down water escape through the geotextile. This paper presents a field test result of a geotextile tube in the land reclamation project for the Songdo New City construction site. The dredged silty clay was dredged by the dredging ship and hydraulically pumped into the geotextile tube. The height of geotextile tube was measured at every filling stage and also measured width and diameter of geotextile tube with the elapsed time. Based on the test results, if the clayey filling material is used, the pumping step must be divided 3~4 stages for drainage and sediment. After complete drainage, the height of the geotextile tube reduces by approximately 50%.

  • PDF

A Stochastic Numerical Analysis of Groundwater Fluctuations in Hillside Slopes for Assessing Risk of Landslides (산사태 위험도 추정을 위한 지하수위 변동의 추계론적 수치 해석)

  • 이인모
    • Geotechnical Engineering
    • /
    • v.3 no.4
    • /
    • pp.41-54
    • /
    • 1987
  • A stochastic numerical analysis for predicting the groundswater fluctuations in hillside slopes is performed in this paper to account for the uncertainties associated with the rainfall and site characteristics. The effect of spatial variabilities of aquifer parameters and the effect of temporal variability of recharge on the groundwater fluctuations are studied in depth. The Kriging is used to account for the spatial tariabilities of aquifer parameters. This technique prolevides the best linear unbiased estimator of a parameter and its minimum variance from a litsitem number of measured data. A stochastic one-dimensional numerical model is delreloped b) combining the groundwater flow model, the Kriging, and the first-order second-moment analysis. In addition, a two dimensional detelministic groundwater model is developed to study the change of ground water surfas in the transverse direction as well as in the downslope direction. It is revealed that the undulations of the impervious bedrock in addition to the permeability and the specific yield have an important influence on the fluctuations of the groundwater surface. It is also found that th'e groundwater changes significantly in the transverse direction as well as in the downslope direction. The results obtained in this analysis may be used for evaluation of landslide risks due to high porewater pressure.

  • PDF

Geosynthetic Reinforced Soil Method for Restoration of Debris Flow Failure Slopes (쇄설성 유동파괴 사면 복구를 위한 토목섬유 보강토 공법)

  • Cho Yong-Seong;Kim You-Seong;Park Inn-Joon
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.5
    • /
    • pp.93-101
    • /
    • 2005
  • The formation of slopes is unavoidable under the special circumstance of Korea where $7%$ of the whole area are composed of mountains and civil engineering projects such as road and site developments are increasing with industrial development and horizontal expansions of urban area. Stability of slopes is one of quite important issues under special meteorological characteristics that over two-thirds of annual average rainfall is concentrated in summer season and the localized torrential downpour is getting more frequent recently. As a result of these circumstances, partial slope failures by debris flow of the high water content soils occur frequently in cut soil slopes. In this case of debris flow slope failure, slope declination method is selected fur the stable recovery because it is impossible to recover entirely by existing recovery methods. Seeding or special grass planting methods are followed separately without exception. The method by which entire recover with bigger stability ratio would be possible and grass planting work would be done simultaneously is developed. For debris flow failure slopes, this study secured the safety of slopes by preventing the inflow of rainwater and scour using geosynthetics-reinforced embankment, and created nature-friendly slopes by planting trees on the slopes.

A Quantitative Risk Analysis of Related to Tower Crane Using the FMEA (타워크레인의 정량적 위험성 평가가법에 관한 연구(FMEA 기법 위주))

  • Shim, Kyu-Hyung;Rie, Dong-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.34-39
    • /
    • 2010
  • The purpose of this study is to suggest objective evaluation model as a plan to utilize as opportunity in establishing judgment standard of mutual inspection criteria and to upgrade inspection ability by reviewing and analyzing level of danger and importance in advance based on inspection results of inspection institutions regarding tower cranes used in construction fields. Tower crane is a mechanical device transporting construction supplies and heavy materials to places over 20~150M high from the ground for the period ranging from a short time of 2~3 months to two years after being installed in construction sites in vicinity of buildings or structures and is an important facility indispensable for construction sites. However, since use period after installation is short and professional technical ability of technicians working on-site about of tower crane is poor, systematic and quantitative safety management is not carried out As a part of researches on procedure of RBI(Risk Based Inspection) possible to apply to Knowledge Based System based on knowledge and experiences of experts as well as to tower cranes for solving these problems, quantitative RPN(Risk Priority Number) was applied to RPN utilizing technique of FMEA(Failure Mode and Effect Analyses). When general RBI 80/20 Rule was applied parts with high level of risks were found out as wire rope, hoist up/down safety device, reduction gear, and etc. However, since there are still many insufficient parts as risk analyses of tower crane were not established, it is necessary for experts with sufficient experiences and knowledge to supplement active RBI techniques and continuous researches on tower cranes by sharing and setting up data base of important information with this study as a starting point.

6TALK : Implementation of NAT-PT/SIIT and enhanced ALG

  • 이주철;호용근;신명기;김형준
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2002.11a
    • /
    • pp.701-705
    • /
    • 2002
  • This paper describes implementation of IPv6-IPv4 transition toolbox named as 6TALK(IPv6 TrAansLator of Krv6) and some scenarios using 6TALK which enables IPv6 island to connect other IPv6 island or IPv4 island seamlessly. 6TALK implements some transition mechanisms suggested in NGTrans Working Group of IETF. Those mechanisms are composed of basic mechanism, tunneling, and applied mechanism such as DSTM. 6TALK provides functions which enable IPv6 network at the edge of existing network to communicate with IPv4 network by using these transition mechanisms. As major transition mechanisms in 6TALK we adopt NAT-PT/SIIT and DSTM/DSTM options and as implementation environment we use Linux Kernel 2.4.18 and Netfilter framework. Software modules implemented in Linux kernel was ported to hardware box using Motorola MPC 8260 processor. The transition mechanisms used in 6TALK are the ones predicted to be used in initial transition step to IPv6.

  • PDF

Test-Driven Development Adoption influence to User Satisfaction on OpenSource Project development (오픈소스 프로젝트의 테스트 주도 개발 채택여부가 사용자만족도에 미치는 영향에 관한 연구)

  • Sohn, Hyo-jung;Lee, Min-gyu;Seong, Baek-min;Kim, Jong-bae
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.10a
    • /
    • pp.1075-1078
    • /
    • 2015
  • Three kinds of typical practices to reflect the values of Agile Development Methodology were selected from a previous study. Those were Communicate using Web 2.0 collaboration tools, test-driven development (TDD, Test-Driven Development) method is adopted, and refactoring. In this study, we set up a hypothesis that the adoption of TDD project will make user satisfaction is higher. Select 100 sample projects from SourceForge(sourceforge.net), the most popular open source hosting site, the criteria is we can be determined whether operate in the project (developer least 7 people, bugs can occur more than 100, created the project since 2000). To determine whether the use of automated development tools xUnit of TDD through the CVS and SVN log analysis. Using data from the FLOSSmole and to evaluate the user experience of the project. User satisfaction of each project Rating, bug fix cycle, downloads and pageviews. Through this study, correlates of whether TDD adoption and user satisfaction, we will suggest a reflected the Agile practices new open source development methodology. As a result, it contributes to increase the maturity of the open source community.

  • PDF

Live Lines Tracing Method in Power Distribution System with 3-phase-4 wires (삼상 다중 접지 배전계통에서 활선로 추적 방법)

  • Zheng, Yan-peng;Byun, Hee-Jung;Shon, Sugoog
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2017.05a
    • /
    • pp.559-562
    • /
    • 2017
  • In city, tracing of power transmission lines is difficult due to compound installation of overhead and underground lines, transposition, bad view caused by trees or big buildings. It is hard problem for electrical technician on site to trace power transformers or power lines to serve customers in 3 phase -4 wires power distribution systems. It is necessary that the correct and fast tracing method is required for load balancing among distribution lines. Old technology use to trace off-lines with high power impulse injection. Our proposed method use to trace live lines with very small power high frequency signal injection. Typical power transformers in the distribution system prevent propagating the higher frequency carrier signal. The proposed method uses the limited propagation ability to identify the power transformer to serve customers. Two end communication terminals are required to be synchronized between them for determination on electrically same phases. Challenging issue is to achieve synchronization without GPS providing synchronizing time. A novel power transformer and wire identification system is designed and implemented. The system consists of a transmitter and a receiver with power-line communication module. Some experiments are conducted to verify the theoretical concepts in a big commercial building. Also some simulations are done to help and understand the concepts by using MATLAB Simulink simulator.

  • PDF

Study about Power Transformer and Lines Tracing Method based on Power Line Communication Technology (전력선 통신 기술을 활용한 변압기 및 전력선로 추적 방법 개발에 관한 연구)

  • Byun, Hee-Jung;Choi, Sang-jun;Shon, Sugoog
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.05a
    • /
    • pp.505-508
    • /
    • 2016
  • In city, tracing of power transmission lines is difficult due to compound installation of overhead and underground lines, transposition, bad view caused by trees or big buildings. It is hard problem for electrical technician on site to trace power transformers or power lines to serve customers in 3 phase -4 wires power distribution systems. It is necessary that the correct and fast tracing method is required for load balancing among distribution lines. Old technology use to trace lines with high power impulse injection. Our proposed method uses to trace lines with very small power high frequency signal injection. Simulation models for 3-phase power transformers, 3-phase wire lines, and customer loads are described to investigate the transmission characteristics of high frequency power line carrier. Distribution lines have only a limited ability to carry higher frequencies. Typically power transformers in the distribution system prevent propagating the higher frequency carrier signal. The proposed method uses the limited propagation ability to identify the power transformer to serve customers. The system consists of a transmitter and a receiver with power-line communication module. Some experiments are conducted to verify the theoretical concepts in a big commercial building. Also some simulations are done to help and understand the concepts by using MATLAB Simulink simulator.

  • PDF

Computing Procedure of Daily Average Air Temperature using Field Data and Frost Index Calibration for Anti-Frost Heave Layer Design (현장계측 데이터를 이용한 일평균 대기온도 산정방법과 동상방지층 설계를 위한 동결지수 보정)

  • Cho, Myung-Hwan;Kim, Nakseok;Shim, Jaepill
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.433-439
    • /
    • 2011
  • The frost depth(frost penetration) is used to install anti-frost heave layers in pavement designs. The freezing index is calculated by an annual accumulated value of multiplying the period of time with temperatures below zero, and the corresponding temperature. Therefore, the DAAT(daily average air temperature) calculation method may play an effect on the FI(freezing index). The Weather Observatory used to supply 4 average air temperatures per day, but currently supplies 8 per day. With this study, we divided the southern part(below FI=$350^{\circ}C{\cdot}day$) of the Korean peninsula into 6 areas according to site conditions(low embankment, embankment-cutting slope, and the cutting slope) and established a field measurement system for 15 positions to check the effects on the result of FI according to differing DAAT calculation methods. The air temperatures obtained by the field measurement system was used to calculate and compare the FI. As a result, the freezing index calculated based on the $DAAT_4(T_4)$ is normally greater by 3% than the one on $DAAT_8(T_8)$. In addition, the calibration equation for the freezing index using air temperatures was proposed through the research.