Study on System Support for Offshore Plant Piping Process Using 3D Simulator

  • Kim, Hyun-Cheol;Lee, Gyu-Hong
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.3
    • /
    • pp.217-226
    • /
    • 2020
  • An offshore plant is an offshore platform that can process oil and gas resources in rough seas with a poor working environment. Moreover, it is a complex structure with different types of offshore facilities and a large amount of outfitting that connects different offshore installations. In particular, an enormous amount of various piping materials is installed in a relatively narrow space, and thus, the difficulty of working is relatively high compared to working in ships or ground plants. Generally, when the 3D detailed design is completed, an offshore plant piping process is carried out at the shipyard with ISO 2D fabrication drawings and ISO 2D installation drawings. If a worker wants to understand the three-dimensional piping composition in the working area, he can only use three-dimensional viewers that provide limited functionality. As offshore plant construction progresses, correlating work with predecessors becomes more complicated and rework occurs because of frequent design changes. This viewer function makes it difficult to identify the 3D piping structure of the urgently needed part. This study deals with the process support method based on a system using a 3D simulator to improve the efficiency of the piping process. The 3D simulator is based on the Unity3D engine and can be simulated by considering the classification and priority of 3D models by the piping process in the system. Further, it makes it possible to visualize progress information of the process. In addition, the punch content can be displayed on the 3D model after the pipe inspection. Finally, in supporting the data in relation to the piping process, it is considered that 3D-simulator-supported piping installing could improve the work efficiency by more than 99% compared to the existing method.

Application of the Public Buildings for the Korean-style houses in the availability of R&D technologies - Focused on Drawings of Agricultural Education and Experience Center in Na-Ju, Korea

  • Kim, Young-Hoon;Peck, Yoo-Jung;Park, Joon-Young;Chun, Kuk-Chun
    • KIEAE Journal
    • /
    • v.16 no.3
    • /
    • pp.13-23
    • /
    • 2016
  • Purpose: In this paper, based on the design drawings of Naju Agricultural Technology Learning Center by focusing on features of New-Hanok applied technology in the design and construction process of New-Hanok Type Public buildings by looking at the characteristics of the whole building is planned to be presented in the future development direction and value of public architecture applied to public buildings. Method: we first review the Phase 1 study results of technology development and application technology to look at the type and characteristics of the technologies applied in Naju Hanok Experience Agriculture Learning Center. As construction designs through the consultation suggestions reflect changes were seven times. By analyzing the changes in the basic design and conduct design in the process were organized for the new technologies applied and whether the application of existing technology hanok. Result: (1) Complements the shortcomings of technology and R & D to offer an alternative to the reinforcement was omitted modify the construction method or irrational process. (2) Implementation of a technique aiming to apply new-hanok workability and economic efficiency is based on a combination of the modern construction techniques and materials. (3) The use of modern materials to the extent that can assist in the purpose and function of the building are to be accommodated. (4) There is sufficient historical study and design plan for establishing identity is necessary in order to reflect the history and tradition of new-hanok public buildings.

A Study on the Improvement of Total Cost Change Control in Private Investment Projects (민간투자시설사업에 있어 총사업비 변경관리의 개선방안 연구 - 고속도로 민간투자시설사업을 중심으로)

  • Kim Se-Jong;Kim Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.119-126
    • /
    • 2001
  • This paper analyzes problems related to total cost changes in private investment projects, and then proposes an improvement measure for the control of cost changes within the framework of the project management, contract, human resource, project communication, cost, and time management. From the viewpoint of contract management, the basis of cost change ought to be cleared up with standardization of related provisions in the concession agreement, and potentiality of change ought to be excluded with prescription of the private investor's leading role from the design phase. Regarding human resource management, this paper proposes a standard work flow granting much sovereign rights to private parts by putting restriction on work scopes of the entrusted authority of government, and transferring the rights of assignment, contract, and control about the responsible supervisor to the concessionaire. With regard to project communication management the notification of changes on drawings and technical documents ought to be automated and the realtime database ought to be established with DMIS (Drawings & Documents Management Information System). From the cost management point of view, this thesis integrates the control of cost-change-approved items and disapproved items to one cost breakdown system, and then harmonizes the actual progress with EVMS in time management.

  • PDF

Implementation of an Indoor Location Based Contents Displaying System Using Web Services (웹 서비스 이용 옥내위치기반 콘텐츠 디스플레이 시스템 구현)

  • Yim, Jae-Geol;Kim, Min-Soo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.8
    • /
    • pp.147-155
    • /
    • 2011
  • Map rendering, positioning, database managements are key elements of location based services. Google map and GPS (Global Positioning System) have become a very popular solution for map rendering and positioning, respectively. They are very effective and yet free of charge. However, they cannot be used for an indoor location based service system. We cannot render a building drawing with Google map, we cannot determine a moving object's position when it is indoor. This paper introduces our web services of rendering drawings, indoor positioning, and multimedia contents up-loading and playing so that any programmers can use them in developing indoor location based service systems. In order to experimentally show the efficiency of our web services, we have built a location based contents displaying system for museum visitors with them.

Analysis of the Causes of Defects in Fenestration Construction and Their Impacts on Construction Quality - Focused on Door Hardware - (창호철물공사 하자발생 원인과 시공품질 영향분석에 관한 연구 - 문(Door)에 사용되는 창호철물 중심으로 -)

  • Moon, Sang-Deok;Chung, Jae-Min;Ock, Jong-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.4
    • /
    • pp.341-350
    • /
    • 2013
  • For this study, a series of interviews with engineers in the Korean construction industry was carried out through a formal workshop format to analyze the causes of the inferior quality of builders' hardware. The authors established the causes of defects in window hardware construction in relation to the three aspects of system, design, and construction as involving the following seven factors: lack of system (including low ability to create construction specifications); low social awareness of the importance of window hardware; low technical capability to create design drawings; low design costs; small manufacturing capacity; low construction cost; and short duration of construction. Among the seven causes, the biggest cause of defects in window hardware construction is the lack of a system (low ability to create construction specifications), followed by low technical capability to create design drawings. In addition, this study carried out basic research to create measures to prevent defects in window hardware construction by analyzing how such causes of defects are distributed depending on the scale of architectural firms and construction companies during actual projects.

Developing An Automatic System for Quantity Taking-off Cut and Bent Re-Bar and Making a Placing Drawing (가공철근 물량산출 및 배근시공상세도 작성시스템 개발)

  • Park, Hyeon-Yong;Lee, Seung-Hyun;Kang, Tai-Kyung;Lee, Yoo-Sub
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.358-363
    • /
    • 2007
  • Reinforcing steel work plays an important role in terms of its structural performance or weight of construction cost for reinforced concrete structures. Precise estimation of re-bar quantity gives a basis for managing the reinforcing steel work effectively. However, the estimation process is still performed ineffectively based upon the expert's experience or manpower in spite of the advanced technology or improvement efforts. Therefore, the purpose of this research is to develop a prototype system for taking-off the quantity of reinforcing steel bars quickly and accurately in an order consistent with the specific members identified on the drawings. An estimate algorithm considering the connection, settlement and coating thickness of re-bars was suggested regarding to their replacement conditions which places more emphasis on constructibility. Also, this system produces the shop drawings automatically with the calculation results.

  • PDF

Development of Automatic Drawing Program for Elevator Installation Drawing to Strengthen Competitiveness of The Elevator Industry (승강기 산업의 영업설계 경쟁력 강화를 위한 승강기 설치도면 자동생성 프로그램 개발)

  • Ko, Young-joon;Kim, Byoung-ik;Han, Kwan-hee
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.2
    • /
    • pp.172-179
    • /
    • 2019
  • Recently, design automation of installation drawings and design elements has been required in the elevator industry. This is recognized as an important role in securing adaptability on site, reducing design errors, and enhancing export competitiveness. However, in case of a small company doesn't have enough resources to develop the program, and it is difficult to develop a design automation program. Therefore, it is necessary to have an automatic drawing generation program that enables small companies to easily invest and use, while allowing users to concentrate on productive tasks. In this paper, we propose an automatic drawing generation program using parametric coding technique. This program is linked with the web service and automatically creates the drawing when the user enters the site information on the web. This is useful for elevator installation and maintenance due to reduced drawing time for elevator drawings.

Validity Study on Installation of a Combustion Burner for Electric Arc Furnace in Steel Making Plant by the Heat Balance Check and Case Study (열정산과 적용사례 조사에 의한 제강 전기로용 조연버너 적용 타당성 연구)

  • Kim, Hyun-Jin;Hur, Jin-Huek;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.6 no.1
    • /
    • pp.71-75
    • /
    • 2010
  • In this study, the validity study has been carried out to apply the combustion burner in an electric arc furnace. The validity of applying the combustion burner has been studied in the aspect of the operation through the calculation of heat balance. The average decrease rate of power on time is 11.2%. When the maintainability is compared to the door lance manipulator type, the multi-functional combustion burner is simple to replace and repair. The location of burner can be adopted according to the drawings which are recommended in this study. As a result, the validity of applying the combustion burner to improve an efficiency of electric arc furnace has been confirmed.

  • PDF

Periodic seismic performance evaluation of highway bridges using structural health monitoring system

  • Yi, Jin-Hak;Kim, Dookie;Feng, Maria Q.
    • Structural Engineering and Mechanics
    • /
    • v.31 no.5
    • /
    • pp.527-544
    • /
    • 2009
  • In this study, the periodic seismic performance evaluation scheme is proposed using a structural health monitoring system in terms of seismic fragility. An instrumented highway bridge is used to demonstrate the evaluation procedure involving (1) measuring ambient vibration of a bridge under general vehicle loadings, (2) identifying modal parameters from the measured acceleration data by applying output-only modal identification method, (3) updating a preliminary finite element model (obtained from structural design drawings) with the identified modal parameters using real-coded genetic algorithm, (4) analyzing nonlinear response time histories of the structure under earthquake excitations, and finally (5) developing fragility curves represented by a log-normal distribution function using maximum likelihood estimation. It is found that the seismic fragility of a highway bridge can be updated using extracted modal parameters and can also be monitored further by utilizing the instrumented structural health monitoring system.

Work Breakdown Structure for advanced urban transit system (차세대 첨단 도시철도시스템 기술개발사업의 업무분류체계(WBS) 구성에 관한 연구)

  • Park Sung-Hyuk;Oh Seh-Chan;Yeo Min-Woo
    • Proceedings of the KSR Conference
    • /
    • 2005.11a
    • /
    • pp.921-927
    • /
    • 2005
  • Concurrent engineering is considered in the 21st century product development and H&D. Moreover, advancements in IT and advanced system engineering technology enables to produce high-quality article and shorten the period of R&D. The paper propose work breakdown structure(WBS) based on the product data management(PDM), WEB based system engineering technique, to introduce and operate advanced system engineering technique. We will manage systematically all data produced in advanced urban transit system project based on the proposed WBS. Besides, we provide strategic information for improving efficiency of R&D in advanced urban transit system project. Futhermore, we manage data such as images, design drawings, documents as well as numerical data, and will establish PDM system for sharing the data.

  • PDF