Development of EMTDC Model for Electrified Railroad Supply System (전철 급전계통의 EMTDC 모델개발)

  • 윤재영;최흥관;김종율
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.12
    • /
    • pp.624-629
    • /
    • 2002
  • This paper presents the first Simulation model using EMTDC program to analyze the electrified train voltage distribution characteristics in ac auto-transformer 1110 railroads. In general, all of the electrified train supply system has the characteristics that the train supply line is a naturally non-symmetrical and unbalanced system. Also, it is needed to model the Scott transformer which invert the balanced 3-phase quantity into 2-phase. Therefore, the general simulation methodology using previous simplified equivalent circuit or RMS based program can't obtain the accurate results to reflect the real-time operation because these methodology is basically assumed on completely 3-phase balanced system. To overcome these defects, in this paper, the EMTDC simulation model to analysis the completely electrified railroad system with Scott transformer and AC auto-transformer is presented. Also, the correctness of EMTDC modeling is confirmed by the old basic concepts and we think that this EMTDC model has the future powerful capability for application of railroad system analysis.

Model development of electrified railroad supply system for Electromagnetic Transient Analysis (순시치 해석용 전철급전계통 모델개발)

  • 윤재영;최흥관;김종율;위상봉
    • Journal of the Korean Society for Railway
    • /
    • v.5 no.4
    • /
    • pp.253-259
    • /
    • 2002
  • This paper presents the first simulation model using EMTDC program to analyze the electrified train voltage distribution characteristics in ac auto-transformer fed railroads. In general, all of the electrified train supply system has the characteristics that the train supply line is a naturally non-symmetrical and unbalanced system. Also, it is needed to model the Scott transformer which invert the balanced 3-phase quantity into 2-phase. Therefore, the general simulation methodology using previous simplified equivalent circuit or RMS based program can't obtain the accurate results to reflect the real-time operation because these methodology is basically assumed on completely 3-phase balanced system. To overcome these defects, in this paper, the EMTDC simulation model to analysis the completely electrified railroad system with Scott transformer and AC auto-transformer is presented. Also, the correctness of EMTDC modeling is confirmed by the old basic concepts and we think that this EMTDC model has the future powerful capability for application of railroad system analysis.

FUNDAMENTAL RESEARCH OF A NOVEL 3/1 PHASE CONVERTER FOR ELECTRIFIED RAILROAD

  • Farshad, Siamak;Rongtai, Hao
    • Proceedings of the KIPE Conference
    • /
    • 1998.10a
    • /
    • pp.955-960
    • /
    • 1998
  • Electrified railroads inject large amount of harmonics, negative sequence and reactive currents to electric supply systems. This paper introduces application of active filter as a 3/1 phase converter for electrified railroad. In this system active filter compensate harmonics, negative sequence and reactive currents and electric railroad and active filter together act as a balance three-phase load with power factor 1

  • PDF

Estimation and Measurement of the Traction return current on the electrified Gyeongbu line.

  • Kim, Y.K.;Yang, D.C.;Han, M.S.;Ryu, C.K.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2001.10a
    • /
    • pp.99.5-99
    • /
    • 2001
  • This study presents a simulation of the traction return current based on $2{\times}25kV$ power supply system in order to determine the impedance bond intensity of impulse type track circuit on the electrified Gyeongbu line. The results of the simulation enables us to measure the precise intensity of catenary current that returns to the substation through KTX (Korean Train Express) operated by $2{\times}25kV$ power supply system with common earth network. The combination of $2{\times}25kV$ and common earth network established on the electrified Gyeongbu line for the first time in Korea. We show that the relationships among the traction return current, earth current, and catenary current, and catenary current can be applied to this line in order to determine the optimal impedance bond intensity ...

  • PDF

New Electrified Rail Impact on Conventional Railroad ; An Empirical Analysis (서울~천안간 전철 개통후 일반철도 수요변화 분석)

  • Kim Jyoung-Tae;Lee Jin-Sun
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.6 s.31
    • /
    • pp.592-596
    • /
    • 2005
  • This study analyzed changes of train operation between Seoul~Cheonan after the introduction of new electrified rail in 2005. As expected number of passengers were reduced at specific service section and several railroad stations which were served by the Mugunghwa. Also, the statistic shows that passenter demand concentrated in a specific time, so train service frequency and level of service need to be modified to meet with changed demand pattern. The purpose of this paper is to identify critical demand pattern, especially, in several section of the railroad system. This studies provide a railroad transportation system that is significantly more efficient, with far greater capacity, by providing solutions to the problems of congestion impact.

A Study on Verification of PowerRail based on Voltage Drop under Extended Feeding Condition (연장급전 전압강하 계산을 위한 전기철도 급전 시뮬레이터의 검증에 관한 연구)

  • Kim, Joorak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.64 no.2
    • /
    • pp.331-337
    • /
    • 2015
  • The power flow analysis of electrified railway is required complicated calculation, because of variable load. Train runs trough rail supplied by electric power therefore, the load value in electrified railway system fluctuates along time. The power flow algorithm in electrified railway system is different from general power system, and the power flow simulation is peformed by the particular simulation software. Powerail is simulation software for analysis of traction power supply system developed by KRRI, in 2008. This consists of load forecasting module, including TPS and time scheduling, and power flow module. This software was verified by measured current under normal feeding condition, however, has not been verified by voltage on the condition of extended feeding. This paper presents the verification of PowerRail based on voltage drop under extended feeding condition. This is performed by comparing simulation result with field test. Field test and simulation is done in commercial railway line.

A study on the protection system in electrified railways system (전철시스템에서의 보호시스템에 관한 연구)

  • LEE Heeyong;KIM Wanggon;LEE Jongwoo
    • Proceedings of the KIEE Conference
    • /
    • summer
    • /
    • pp.1406-1408
    • /
    • 2004
  • Recently, the load increasement and regenerative system of electrified railway system make a difficult to distinguish between the load current and fault current and it need a new intelligent protection system. In this paper, we proposed intelligent algorithm for discriminating normal and abnormal situation instead of the system being operated abnormally.

  • PDF

Analysis of Catenary System with Distributed Parameter (분포정수를 이용한 전차선로 회로해석)

  • Kim, Joo-Rak;Shim, Keon-Bo;Kim, Jung-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.1171-1172
    • /
    • 2007
  • This Paper presents circuit model of catenery in electrified railway system. Most of (a.c.)electrified railway system adopted as AT fed power supply system. This system is fed with twice voltage. It is that AT system can be fed through longer distance. Conventional circuit model of catenary is used T equivalent circuit with lumped parameter. This model may include some problem when traction power supply system is analyzed. In addition, the model with distributed parameter is good for analysis of harmonic and EMI

  • PDF

Computation of Current Distribution at AT Fed Electrified Railway with Mixed Grounding Systems (상이한 보호방식의 전차선로에서 고장전류 해석)

  • 정선호
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2002.11a
    • /
    • pp.343-347
    • /
    • 2002
  • This paper analyzed the effect of breakdown electric current and it establishes a countermeasure that objective of the place where it put when with protection method which is applied from the existing electric railroad power supply system and where the protection method which is applied in the newly electrified system. Will reach and in order to attain simulation it did a actual power supply system and it analyzed that result.

  • PDF

Study on capacity calculation of regenerative inverter for DC electrified transit substation (직류전기철도변전소의 회생인버터 용량산정에 관한 연구)

  • Bae, C.H.;Han, M.S.;Kim, Y.G.;Jang, S.J.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07b
    • /
    • pp.1607-1609
    • /
    • 2005
  • This paper presents capability calculation methods for regenerative inverter in DC electrified transit system. The proposed method uses a train performance and power simulation tool to calculate the regenerative power generated in the DC substation and decide the capability of regenerative inverter. The capability of regenerative inverters for Seoul subway line 5, 6, 7, and 8 has been calculated.