A Study on the Correlation Between Electrical Resistivity and Rock Classification (전기비저항과 암반분류의 상관관계에 대한 고찰)

  • Kwon, Hyoung-Seok;Hwang, Se-Ho;Baek, Hwan-Jo;Kim, Ki-Seog
    • Geophysics and Geophysical Exploration
    • /
    • v.11 no.4
    • /
    • pp.350-360
    • /
    • 2008
  • Electrical resistivity is one of physical property of the earth and measured by electrical resistivity survey, electrical resistivity logging and laboratory test. Recently, electrical resistivity is widely used in determination of rock quality in support pattern design of road and railway tunnel construction sites. To get more reliable rock quality data from electrical resistivity, it needs a lot of test and study on correlation of resistivity and rock quality. Firstly, we did rock property test in laboratory, such as P wave velocity, Young's modulus, uniaxial compressive strength (UCS) and electrical resistivity. We correlate each test results and we found out that electrical resistivity has highly related to P wave velocity, Young's modulus and UCS. Next, we accomplished electrical resistivity survey in field site and carried out electrical resistivity logging at in-situ area. We also performed rock classification, such as RQD, RMR and Q-system and we correlate electrical resistivity to RMR data. We found out that electrical resistivity logging data are highly correlate to RMR. Also we found out that electrical resistivity survey data are lower than electrical resistivity logging data when there are faults or fractures. And it cause electrical resistivity survey data to lowly correlate to RMR.

Proposal of A Novel Generator Efficiency Test Using The Shaft-Torque Method (축-토크법을 이용한 새로운 발전기 효율시험 방법의 제안)

  • Kim, Hyun-Han;Ok, Yeon-Ho;Kim, Kwang-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.4
    • /
    • pp.461-468
    • /
    • 2014
  • An efficiency test for generators is generally required in case of construction of a new power plant or replacement of an existing generator. Generally, the efficiency of generator is measured by the input-output ratio under any given condition. Therefore, the best way is to directly measure the value of input and output power of a generator and calculate the efficiency values. However, it is difficult to measure a generator's input values accurately, especially for large systems. So, we are usually measuring the losses of the generator. But for measuring these values, there are several constraints for test such as preparing additional power generator and releasing the protection relay for manual operation of auxiliary equipments. Therefore, this study suggests that a novel generator efficient test method using the shaft-torque method which can be carried out while the generator is normally operating. The reliability of the result value was verified by comparing with the efficiency test results of the conventional retardation method on IEEE Std 115-1995.

SA-Based Test Scheduling to Reduce the Test Time of NoC-Based SoCS (SA 기법 응용 NoC 기반 SoC 테스트 시간 감소 방법)

  • Ahn, Jin-Ho;Kim, Hong-Sik;Kim, Hyun-Jin;Park, Young-Ho;Kang, Sung-Ho
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.45 no.2
    • /
    • pp.93-100
    • /
    • 2008
  • In this paper, we address a novel simulated annealing(SA)-based test scheduling method for testing network-on-chip (NoC)-based systems-on-chip(SoCs), on the assumption that the test platform proposed in [1] is installed. The proposed method efficiently mixed the rectangle packing method with SA and improved the scheduling results by locally changing the test access mechanism(TAM) widths for cores and the testing orders. Experimental results using ITC'02 benchmark circuits show that the proposed algorithm can efficiently reduce the overall test time.

Investigation of Relation between EFTB Test and RF Conductive Immunity Test Using BER and Baseband Signal

  • Kuwabara, Nobuo;Irie, Yasuhiro;Hirasawa, Norihito;Akiyama, Yoshiharu
    • Journal of electromagnetic engineering and science
    • /
    • v.11 no.4
    • /
    • pp.274-281
    • /
    • 2011
  • High-speed telecommunication systems are influenced by electromagnetic environments because they need a wide bandwidth to transmit signals. Immunity tests of telecommunication equipment are effective for improving its immunity to electromagnetic environments. However, immunity tests are expensive to carry out because there are several different tests. The correlation among the tests should therefore be examined in order to reduce the kinds of tests that are necessary. This paper investigates the correlation between the electrical fast transient/burst (EFTB) test and the radio frequency (RF) conductive immunity test. Imitation equipment was constructed with a balun, and a baseband signal was transmitted from the associated equipment to the imitation equipment. Then, disturbances were applied to the equipment, and the telecommunication quality was evaluated by using the bit error rate (BER). The results from the EFTB test indicated that the BER was less than $6{\times}10^{-5}$ and the value was independent of the peak value. The results from the RF conductive immunity test indicated that the BER was affected by the longitudinal conversion loss (LCL).

A Test System of Valve and Poles for Large Scale Inverter using Resonant Circuit (공진회로를 이용한 대용량 인버터 구성용 밸브 및 폴 시험설비에 관한 연구)

  • Han, Young-Seong;Chung, Chung-Choo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.5
    • /
    • pp.971-976
    • /
    • 2011
  • This paper proposes a test system for a valve and poles building blocks used for large scale inverters such as STATCOM, SSSC, UPFC and VSC HVDC. Power semiconductors in the valve are normally connected in series to withstand switching voltage much larger than the voltage rating of a single power semiconductor. Therefore, there is a need to verify if the dynamic voltage sharing during switching in a valve is satisfactory. In this paper, we propose a test system that provides the necessary test condition: voltage and current in the valve using resonant circuits. A test scheme for a single phase inverter consisting two poles is also proposed. The performance of the inverter pole has to be verified at the factory test, before the system is installed at the site to secure the reliability of the system. The proposed scheme makes it possible to confirm if the pole can withstand voltage and current switching condition and handle loss.

A Study on the Method of Performance Qualification Test for GIL (가스절연송전선로(GIL) PQ시험 방안에 관한 연구)

  • Park, Hung-Sok;Han, Sang-Ok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.5
    • /
    • pp.1062-1067
    • /
    • 2011
  • As the expension of metropolis and increasing of housing site, GIL(Gas Insulated Line) comes to the fore as an alternative to overhead transmission line avoided by local resident. The certification and experimental test for the GIL is now in progress in under ground test lab, Go-chang. For the test, we propose a method of PQ(pre-qualification) test which is essential for development and field application in this paper. The test following this method take about 200 days or 300 days under the circumstances.

A Study on Arc Conductance of Puffer Type SF6 GCB at Current Zero Period (전류영점 영역에서 파퍼식 SF6 가스차단기의 아크 컨덕턴스에 관한 연구)

  • Chong, Jin-Kyo;Song, Ki-Dong;Lee, Woo-Young;Kim, Gyu-Tak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.2
    • /
    • pp.328-332
    • /
    • 2010
  • The SLF(Short Line Fault) breaking capability test for high voltage class $SF_6$ GCB(Gas Circuit Breaker) was conducted. Simplified LC resonant circuit test facility was used for SLF breaking test. During test, Test current was measured by Rogwski coil and arc voltage was measured by voltage divider. Arc conductance was calculated by using these test results before 200ns at current zero. Critical arc conductance value at rated voltage 145kV class is about 2.3mS regardless of breaking current magnitude and arc conductance value at rated voltage 170kV class is about 2.6mS.

Parameters Estimation of Five-Phase Squirrel-Cage Induction Motor in Changing Variable Frequency (주파수 변화에 따른 5상 농형 유도전동기의 정수 추정)

  • Kim, Min-Huei
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.4
    • /
    • pp.241-247
    • /
    • 2014
  • This paper propose a variable parameter estimations of five-phase squirrel-cage induction motor(IM) for speed control system. In order to high performance control of AC motor using a field oriented control(FOC) and direct torque control(DTC) algorithm, there are required precise motor parameters for slip calculation, flux observer, controller gain, rotor position, speed estimation, and so on. We are suggest a analyzed estimation results of the motor parameters that developing five-phase squirrel-cage IM have a stator of concentrated winding for experimental of variable input power frequency. There are results of stator winding test, no-load test, locked-rotor test, variable actual load test, and estimated parameters of equivalent circuits using manufactured experimental apparatus by IEEE Standard Test Procedure for Polyphase Induction Motors and Generators 112-2004.