• 제목/요약/키워드: electric work

Search Result 1,037, Processing Time 0.023 seconds

Improvement of Construction Process management dividing the work area reasonably in Building Construction (작업구역의 합리적 분할에 의한 건축 마감공사의 공정운영 개선)

  • Yoon You-Sang;Joung Young-Kwon;Suh Sang-Wook;Shin Dong-Woo;Kim Chang-Duk;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.59-65
    • /
    • 2003
  • The purpose of this study is to suggest a improved tact planning and scheduling by reliable Toning of work area in high-rise building construction. To do this, the characteristics of main work including electric & mechanical work were considered through the interview with field work forces. The content of the study is focused mainly on reliable work flow and rhythmical repetition of uniform resource quantity to manage effective tact planning & scheduling. And also the study recommends more implement of tact planning and scheduling to manage human resources successfully in repetitive building construction.

A Study on Surface Charge Characteristics on Various Plastic Materials for Ttiboelectrostatic Separation of Plastic Wastes (폐플라스틱 정전분리를 위한 하전특성에 관한 연구)

  • 김도균;조희찬;전호석
    • Resources Recycling
    • /
    • v.11 no.3
    • /
    • pp.37-45
    • /
    • 2002
  • Triboelectrostatic Separation procese is a technology that different particles charged after contact and rubbing different materials are separated in an electric field. At this time, charged polarity of different materials depends on their own work function. Therefore this study discovers work functions of various plastics and determines charging characteristics for the specific optimum operation condition. The experiment is conducted with two sample sets composed of various different plastics. Each sample is charged by contact and rubbing different materials. Surface charge of charged particles is measured by Faraday Cage. The specific work function of an each plastic is driven by measured charging amount and charged particles are separated in a certain electric field ($\pm$20 kV). At last, the relationship between charging amount and separation efficiency is induced by the separation experiment.

Evaluation of Fuel Economy for a Parallel Hybrid Electric Vehicle

  • Park, Dookhwan;Kim, Hyunsoo
    • Journal of Mechanical Science and Technology
    • /
    • v.16 no.10
    • /
    • pp.1287-1295
    • /
    • 2002
  • In this work, the fuel economy of a parallel hybrid electric vehicle is investigated. A vehicle control algorithm which yields operating points where operational cost of HEV is minimal is suggested. The operational cost of HEV is decided considering both the cost of fossil fuel consumed by an engine and the cost of electricity consumed by an electric motor. A procedure for obtaining the operating points of minimal fuel consumption is introduced. Simulations are carried out for 3 variations of HEV and the results are compared to the fuel economy of a conventional vehicle in order to investigate the effect of hybridization. Simulation results show that HEV with the vehicle control algorithm suggested in this work has a fuel economy 45% better than the conventional vehicle if braking energy is recuperated fully by regeneration and idling of the engine is eliminated. The vehicle modification is also investigated to obtain the target fuel economy set in PNGV program.

A STUDY ON THE METHODS OF NO POWER INTERRUPTION IN DISTRIBUTION LINE (배전선로의 무정전공법 연구)

  • Jang, J.T.;Song, B.K.;Hong, S.H.;Hwang, S.C.
    • Proceedings of the KIEE Conference
    • /
    • 1992.07a
    • /
    • pp.180-182
    • /
    • 1992
  • In spite of recent stagnation, the rate of electric consumption has highly grown in accordance with a high cultural livings, Also, a usage of electric energy is growing with development of multi-information society. To make the matter worse, hard work of highest order is required because distribution system are widely spread and complex. And consummers demand for the electricity of good quality and it is obstracle to be not able to train related technitian for maintenance without an interruption of electric power. It is sure the counterplan of uninterruption of electric power is very necessary. In this paper, considering the working circumstances, we presented the necessity of work method, the effects and the future prospect for uninterruption power supply.

  • PDF

Training Needs Analysis for the Roles and Competency of Field Representatives in Electric Work (전기공사 현장대리인의 역할 및 역량에 대한 교육요구분석)

  • Yun, Hyeon Woo;Yoon, Gwan Sik
    • 대한공업교육학회지
    • /
    • v.40 no.1
    • /
    • pp.142-162
    • /
    • 2015
  • The purpose of this study are to provide the basic data materials and implementations for successful performance of electric-work field representatives of South Korean firms by identifying their roles and competency and examining their educational need. For this research purposes, three phased analysis was followed on: (1) the roles of electric-work field representatives, (2) competency of electric-work field representatives and (3) educational need for their competency. This research method was to conduct a focus group interview for 10 expert field representatives along with survey. The collected data materials were processed by MS Excel and SPSS 21.0 for statistical analysis including average, standard deviation and other basic statistics; the gap in awareness of field representatives; and need values. For the needs analysis, the difference between significance of field representatives' competency and current status was examined by t test. And the awareness gap between competency importance and current status was identified based on the Borich equation. The Locus for Focus model was employed herein to identify the kinds of competency with high importance and high inconsistency to prioritize. As a result, this research has found as follows: first, the roles of field representatives were found to be in 13 different kinds of roles. Second, electric-work field representatives were found to need to have 16 different skills. Third, regarding the 16 abilities, the gap between current status and significance was analyzed herein. The results showed statistically significant differences in all cases. The Borich needs analysis found the first required ability was communication ability followed by power of execution, conflict management ability, analytical thinking and time management ability. Also, the results of Locus for Focus model analysis displayed that the first quadrant(HH) included 7 highly-demanded abilities of communication ability, analytical thinking, decision making ability, specialty, time management ability, power of execution and drive for work implementation. The top-priority group was found to have 5 items of communication ability, analytical thinking, time management ability, power of execution and drive for work implementation which were commonly seen in the Locus for Focus model outcomes. Based on these findings, this research could identify the roles and competency of electric-work field representatives and provide the basic data materials applicable to future personal management of electricity companies including recruitment, division of work, job description, evaluation, etc. Also this research offered guidelines on demanded abilities in the field and where to place priority. The kinds of abilities with high educational demand as found in this research must be considered in designing educational programs for the competency building of field representatives. This research is expected to provide useful information in developing such educational programs for field representatives.

침수 누전에 대한 자계 특성

  • Kim, Tak-Yong;Lee, Gyeong-Seop;Kim, Jin-Sa;Kim, Chung-Hyeok
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2009.11a
    • /
    • pp.147-147
    • /
    • 2009
  • Every year respect a countermeasure establishment the electric leakage detection system and electric leakage investigation work are becoming enforcement line plentifully in about the electric leakage accident which is increasing, measuring in compliance with a most ground connection voltage and an image electric current mainly is become accomplished, inputs a pulsation group signal in the line and detects a signal change between the line a method which there is. In order to investigate the quality in compliance with an electric leakage electric current from the electric leakage area after conferring the electric leakage environment in compliance with a flooding when the electric leakage electric current exists in the surface, it investigated the electric leakage electric current quality from the electric current distribution and flooded districts from the present paper.

  • PDF

Development of Non-Electric and Delay-Type Explosive Bolt (비전기식 지연형 폭발볼트 개발)

  • Lee YeungJo;Kim DongJin
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.9 no.3
    • /
    • pp.60-65
    • /
    • 2005
  • The present work has developed non-electric and delay-type explosive bolt that does not need electric power supply device and has the delay function in the operation. Non-electric power supply system enables separation device system to be minimized. In order to prove the mechanism of the operation, the power of air resistance caused from aviation object used to ignite the initiator. we can be founded from the present work that the changes in the operation load influence directly the ignition of the initiator. The design of non-electric and delay type of explosive bolt is the most suitable for the separation system that is necessary to reduce the velocity of aviation object and safe landing of parachute system.

Analysis of Electrical Accident for Outlet Circuit of Laboratory on ETA (ETA를 통한 연구실험실 콘센트회로의 전기재해 분석)

  • Kim, Doo-Hyun;Kim, Sung-Chul;Park, Jong-Young;Kim, Sang-Chul
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.2
    • /
    • pp.27-33
    • /
    • 2017
  • This study is intended to identify issues on the basis of investigating the actual state of laboratory environment and outlet circuit, and derive end states by expressing sequences from the initiating event of disaster to accident in leakage current, poor contact and overload through ETA(event tree analysis). To this end, this study investigated the actual state of electric equipment of laboratory at universities in all parts of country. And it is shown that most of them are failure in electric work and user negligence in the investigation of actual state. It is found that there is earth fault and defect in wire diameter in the failure of electric work and the problem of partial disconnection due to wire bundling and poor contact in user negligence. Outlet-related component, failure rate and initiating events are composed of a total of 41 initiating events, i.e., 30 internal initiating events and 11 external initiating events. And end states are composed of a total of 15 parts, i.e., 3 electric power parts and 12 safety parts. Earthing class 3 is the most important safety device against leakage current (initiating event). And in case of poor contact, it is necessary for manager to check thoroughly because there is no safety device. In case of overload/overcurrent, when high-capacity equipment is connected, a molded case circuit breaker, safety device, worked. However, in most cases, it is verified that this doesn't work. This study can be utilized as electric equipment safety guide for laboratory safety manager and managers.