Park, S.M.;Song, S.J.;Uhm, S.J.;Cho, S.G.;Park, S.P.;Lim, J.H.;Lee, H.T.
Asian-Australasian Journal of Animal Sciences
/
v.17
no.12
/
pp.1641-1646
/
2004
The objective of this study was to generate transgenic mice expressing human resistin gene by using the tetraploidembryonic stem (ES) cell complementation method. Human resistin gene was amplified from human fetal liver cDNA library by PCR, cloned into $pCR^{(R)}$ 2.1 $TOPO^{(R)}$ vector and constructed in pCMV-Tag4C vector. Mammalian expression plasmid containing human resistin was transfected into D3-GL ES cells by Lipofectamine 2,000, and then after 10-12 days of transfection, the human resistin-expressing cells were selected with G418. In order to produce tetraploid embryos, blastomeres of diploid embryos at the two-cell stage were fused with two times of electric pulse using 60 V 30 $\mu$sec (fusion rate: 2,114/2,256, 93.5%) and cultured up to the blastocyst stage (development rate: 1,862/2,114, 94.6%). The selected 15-20 ES cells were injected into tetraploid blastocysts, and then transferred into the uteri of E 2.5 d pseudopregnant recipient mice. To investigate the gestation progress, two E 19.5 mused fetuses were recovered by Cesarean section of which one fetus was confirmed to contain human resistin gene by genomic DNA-PCR. Therefore, our findings demonstrate that tetraploid-ES mouse technology can be considered as a useful tool to produce transgenic mice for the rapid analysis of gene function in vivo.
In this paper, represented uninterruptible power supply (UPS) equipment maintaining constant output voltage, the proposes a photovoltaic system constructed with a step up boosting chopper and single phase pulse width modulation (PWM) voltage source inverter. as power source disconnection, voltage variation and output current variation with load variation. This system is driven by being synchronized voltage fed inverter and AC source, and in the steady state of power source charge battery connected to DC side with solar cell using a Photovoltaic that it was so called constant voltage charge. It can be results of saving electric power, and through a normal operation of energy storage system (ESS), the system operated the LED a calling on signal changes at the airport in an efficient manner. In addition, better output waveform was generated because of PWM method, and it was proved to test by experiment maintained constant output voltage regardless of AC source disconnection, load variation, and voltage variation of AC power source.
Maeng, D.Y.;Rhee, C.K.;Lee, N.H.;Park, J.H.;Kim, W.W.;Lee, E.G.
Korean Journal of Materials Research
/
v.12
no.12
/
pp.941-946
/
2002
Both Cu and Cu-oxide nanopowders have great potential as conductive paste, solid lubricant, effective catalysts and super conducting materials because of their unique properties compared with those of commercial micro-sized ones. In this study, Cu and Cu-oxide nanopowders were prepared by Pulsed Wire Evaporation (PWE) method which has been very useful for producing nanometer-sized metal, alloy and ceramic powders. In this process, the metal wire is explosively converted into ultrafine particles under high electric pulse current (between $10^4$ and $10^{ 6}$$A/mm^2$) within a micro second time. To prevent full oxidations of Cu powder, the surface of powder has been slightly passivated with thin CuO layer. X-ray diffraction analysis has shown that pure Cu nanopowders were obtained at $N_2$ atmosphere. As the oxygen partial pressure increased in $N_2$ atmosphere, the gradual phase transformation occurred from Cu to $Cu_2$O and finally CuO nanopowders. The spherical Cu nanopowders had a uniform size distribution of about 100nm in diameter. The Cu-oxide nanopowders were less than 70nm with sphere-like shape and their mean particle size was 54nm. Smaller size of Cu-oxide nanopowders compared with that of the Cu nanopowders results from the secondary explosion of Cu nanopowders at oxygen atmosphere. Thin passivated oxygen layer on the Cu surface has been proved by XPS and HRPD.
Although membrane bio-reactor (MBR) has been widely applied for wastewater treatment plants, the membrane fouling problems are still considered as an obstacle to overcome. Thus, many studies and commercial developments on mitigating membrane fouling in MBR have been carried out. Recently, high voltage impulse (HVI) has gained attention for a possible alternative technique for desalting, non-thermal sterilization, bromate-free disinfection and mitigation of membrane fouling. In this study, it was verified if the HVI could be used for mitigation of membrane fouling, particularly the internal pore fouling in MBR. The HVI was applied to the fouled membrane under different conditions of electric fields (E) and contact time (t) of HVI in order to investigate how much of internal pore fouling was reduced. The internal pore fouling resistance (Rf) after HVI induction was reduced as both E and t increased. For example, Rf decreased by 19% when the applied E was 5 kV/cm and t was 80 min. However, the Rf decreased by 71% as the E increased to 15 kV/cm under the same contact time. The correlation between E and t that needed for 20% of Rf reduction was modeled based on kinetics. The model equation, E1.54t = 1.2 × 103 was obtained by the membrane filtration data that were obtained with and without HVI induction. The equation states the products of En and t is always constant, which means that the required contact time can be reduced in accordance with the increase of E.
Journal of the Korean Society of Fisheries and Ocean Technology
/
v.21
no.1
/
pp.1-6
/
1985
The underwater noise was measured by piezo-electric hydrophones submerged in the water at three different depths. The signals were led through connection cables to preamplifiers, and recorded simultaneously by a four channel tape recorder, and analysed by high resolution signal analyzer. The measurements were carried out at the fjord Skossvassen in archipelago off Bergen and at the cost of Norway in the North Sea. The results of the measurements and the analysis showed that the underwater noise consists of a steady broad band noise superposed by intermittent pulse of various strength. The noise levels measured in fjord Skossvassen indicated that they were generally higher at the shallow (10m) hydrophone than at the deeper hydrophone (25m, 50m). This tendency was not very distinct, however, the noise sources are close to the surface. The underwater noise spectrums measured in the open sea of Norway showed almost similar situation in all layers. This tendency showed that the noise sources are not close to the surface but they are far away from the measuring positions.
In this study, nanostructured Fe-Ce powder with grain size of 10nm was produced by MA (mechanical alloying) process and was consolidated by PECS (pulse electric current sintering) process for the fabrication of bulk nanostructured Fe-Co softmagnetic alloy. PECS process was performed at 700, 800, 900 and $^1000{\circ}C$ with holding time ranging from 0 to 15min. The effectiveness of PECS Process to Produce nanostructured bulk specimens was estimated. The optimal PECS process condition for nanostructured Fe-Co powders was found through observing the change of relative density and microstructure with sintering temperature and holding time. The magnetic properties of the sintered specimens were evaluated through the measurement of coercivity and saturation magnetization.
The Journal of Korean Association of Computer Education
/
v.10
no.6
/
pp.69-77
/
2007
In this paper we implement main functions of electronic measuring devices, which are essential to design electric/electronic virtual laboratories on the Web. The implemented virtual electronic measuring devices such as virtual analog multimeter(VAM), virtual function generator(VFG), virtual oscilloscope(VOSC) enable the learners to perform the virtual experiments on the Web by simple mouse clicks. In order to show their validity virtual experiments for understanding how to use them are designed. The virtual experiments for measuring resistance(OHM), AC/DC Voltage(ACV/DCV) and DC Current(DCA) by the VAM are illustrated. In addition, the learners can change the frequency of the signal generated from the VFG and measure by the VOSC several types of the signals generated from the VFG such as triangular, pulse, sinusoidal waveforms. The VOSC can measure voltage and current through two channels of it and provide the learners with additional functions such as zooming, trigger, cursor, summing of waveforms. Since the virtual electronic measuring devices have been implemented as forms of Java classes, various types of applications are available according to the structures of virtual laboratories.
This paper presents numerical and experimental results on the use of guided waves for structural health monitoring (SHM) of crack growth during a fatigue test in a thick steel plate used for civil engineering application. Numerical simulation, analytical modeling, and experimental tests are used to prove that piezoelectric wafer active sensor (PWAS) can perform active SHM using guided wave pitch-catch method and passive SHM using acoustic emission (AE). AE simulation was performed with the multi-physic FEM (MP-FEM) approach. The MP-FEM approach permits that the output variables to be expressed directly in electric terms while the two-ways electromechanical conversion is done internally in the MP-FEM formulation. The AE event was simulated as a pulse of defined duration and amplitude. The electrical signal measured at a PWAS receiver was simulated. Experimental tests were performed with PWAS transducers acting as passive receivers of AE signals. An AE source was simulated using 0.5-mm pencil lead breaks. The PWAS transducers were able to pick up AE signal with good strength. Subsequently, PWAS transducers and traditional AE transducer were applied to a 12.7-mm CT specimen subjected to accelerated fatigue testing. Active sensing in pitch catch mode on the CT specimen was applied between the PWAS transducers pairs. Damage indexes were calculated and correlated with actual crack growth. The paper finishes with conclusions and suggestions for further work.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.12
/
pp.79-86
/
2008
This paper presents the experimental results of impulse breakdown characteristics in $SF_6/N_2$ gas mixtures under a highly non-uniform electric field with a change in temperature. The test temperature ranges from -25[$^{\circ}C$] to 25[$^{\circ}C$]. The processes of impulse preliminary breakdown developments were analyzed by the measurements of current pulse and luminous signals. As a result, the temperature dependance of breakdown voltage for the negative polarity was much stronger than that for the positive polarity. When increasing the temperature, The leader stepping time for the negative polarity was shown to be longer than that for the positive polarity. The results presented in this paper can be used as a useful information in designing the gas insulation lines with prominent ability for lightning surge.
Kim, Young-Sik;Lee, Yun-Hi;Ju, Byeong-Kwon;Sung, Mang-Young;Oh, Myung-Hwan
The Transactions of the Korean Institute of Electrical Engineers C
/
v.48
no.5
/
pp.319-325
/
1999
Direct current(d.c.)leakage current voltage characteristics of radio-frequencymagnetron sputtered BaTa\sub 2\O\sub 6\ film capacitors with aluminum(A1) top and indium tin oxide (ITO) bottom electrodes have been investigatedas a function of applied field and temperature. In order to study surfacetreatment effect on the electrical characteristics of as-deposited film weperformed exposure of oxygen plasma on $BaTa_2O_6$ surface. d. c.current-voltage (I-V), bipolar pulse charge-voltage (Q-V), d. c. current-time (I-t) andcapacitance-frequency (C-f) analysis were performed on films. All ofthe films exhibita low leakage current, a high breakdown field strength (3MV/cm-4.5MV/cm), and high dielectric constant (20-30). From the temperature dependence of leakage current,we can conclude that the dominant conduction mechanism is ascribed toSchottky emission at high electric field (>1MV/cm) and hopping conduction at lowelectric field (<1MV/cm). According to our results, the oxide plasma surfacetreatmenton as-deposited $BaTa_2O_6$ resulted in lowering interfacebarrier height and thus, leakage current when a negative voltage applied to the A1 electrode. This can be explained by reduction of surface contamination via etching surface and filling defects such as oxygen vacancies.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.