A Domestic Power Companies' Strategy to Enter Asian Thermal Power Plant Market (국내 발전기업의 아시아 화력발전플랜트 시장 진출전략)

  • Park, Chang-Hyun;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.58-66
    • /
    • 2011
  • The power plant companies reached the culmination for growth in the domestic market. Besides, we have faced many challenges such as an electricity opening market trend for overseas, banning the use of coal due to the United nations framework convention on climate change, and the meticulous attention regarding the government's electricity charge plan. On the other hand, the overseas business has been a critical issue since China and many other developing countries expanded their projects abroad. Another factor is that power plant industry is being privatized, and it made the market regulation a bit loose. Thus, the market environment became favorable toward those companies which planned many overseas businesses. In this research, the power plant company's current condition for construction and operation as well as its technical competitiveness were analyzed, and an alternative plan using SWOT analysis for entering an oversea market was made. It dealt with both internal and external factors. Also, examined was the current situation under the power plant industry dealing with restructure for electric industry, lack of fossil fuel, and the United nations framework convention on climate change. From the research, it was suggested that many successful strategies to enter the overseas business by using the market trend I researched.

  • PDF

A Study on Turbine Control Algorithms for Large Steam Turbine in a Power Plant (대용량 발전소 재열재생 증기터빈 제어알고리즘에 관한 고찰)

  • Choi, In-Kyu;Jeong, Chang-Ki
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1665-1666
    • /
    • 2008
  • There are three main devices such as boiler producing steam, turbine driving generator and generator producing electricity. An electrical generator in power plant is driven and maintained its speed at rated by steam turbine which is coupled into generator directly. Therefore after the steam turbine reaches its rated speed and the generator gets into parallel operation with power grid, the electrical power can be increased by turbine controller or governor. The first governor was invented by James Watts for the steam engine to be maintained at a constant speed. The first governor by him was mechanical type with fly balls. The electrical type governor was created due to the progress of electronic devices such as operational amplifiers or integrated circuits. and Today digital electronic type of governor is being widely used in most prime movers.

  • PDF

A Numerical Study on the Application of the Ocean Current Power Parks with a Tidal Power Plant (조력발전소와 연계한 해류발전단지의 활용에 대한 유동해석 연구)

  • Lee, Seung-Ho;Lee, Sang-Hyuk;Jang, Kyung-Soo;Lee, Jung-Eun;Hur, Nahm-Keon
    • The KSFM Journal of Fluid Machinery
    • /
    • v.12 no.3
    • /
    • pp.38-43
    • /
    • 2009
  • The Shiwhaho is an artificial lake located in Yellow sea of Korea where the ocean tidal current is significantly strong, and the tidal power plant is currently being under construction to generate electric power from the ocean tidal current. In addition to the tidal power plant under construction, an ocean current power park was proposed to maximize the power generation by utilizing the ocean current generated by the tidal power plant. To evaluate the feasibility of such combined power plant, the flow characteristics in the ocean current power parks connected with the tidal power plants were investigated numerically in the present study. When two different type of generations are operating together as a system, their interference may occur, which affects their efficiency. Therefore, the minimum distances between the tidal power plants and the ocean current power generators are studied in the present study to minimize such interference. The feasible region to generate power around the Shiwha tide embankment is also predicted by considering predicted ocean current speed distribution. Various arrangements of the ocean current generators are examined and an optimal arrangement is also discussed.

Optimal Design of Urban MICROGRID using Economical Analysis Program (경제성분석 프로그램을 이용한 도심형 마이크로그리드 최적 설계)

  • Seung-Duck, Yu;SungWoo, Yim;Youseok, Lim;SungWook, Hwang;JuHak, Lee
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.2
    • /
    • pp.69-72
    • /
    • 2022
  • This paper actually investigates the load on major large-scale buildings in the downtown area, examines the economic feasibility of installing PV and ESS in a microgrid target building, and evaluates whether an electric vehicle capable of V2G through two buildings is effective as an economical analysis program (HOMER) was analyzed using. It is economical to install a mixture of ESS rather than using the whole PV, and it is shown that if there is an electric vehicle using the V2G function of EV, there is an economic effect to replace the PV. So that Incentives and policies are needed to replace a large area of PV and utilize the existing parking lot to lead EV as a resource of the microgrid. Currently, P2X technology that stores power as ESS or converts it to other energy to control when surplus renewable energy occurs in large-capacity solar power plants and wind farms, etc. This is being applied, and efforts are being made to maintain the stability of the system through the management of surplus power, such as replacing thermal energy through a heat pump. Due to the increase in electric vehicles, which were recognized only as a means of transportation, technologies for using electric vehicles are developing. Accordingly, existing gas stations do not only supply traditional chemical fuels, but electricity, and super stations that also produce electricity have appeared. Super Station is a new concept power plant that can produce and store electricity using solar power, ESS, V2G, and P2G. To take advantage of this, research on an urban microgrid that forms an independent system by tying a large building and several buildings together and supplies power through a super station around the microgrid is in full swing.

Operation optimization of auxiliary electric boiler system in HTR-PM nuclear power plant

  • Du, Xingxuan;Ma, Xiaolong;Liu, Junfeng;Wu, Shifa;Wang, Pengfei
    • Nuclear Engineering and Technology
    • /
    • v.54 no.8
    • /
    • pp.2840-2851
    • /
    • 2022
  • Electric boilers (EBs) are the backup steam source for the auxiliary steam system of high-temperature gas-cooled reactor nuclear power plants. When the plant is in normal operations, the EB is always in hot standby status. However, the current hot standby operation strategy has problems of slow response, high power consumption, and long operation time. To solve these problems, this study focuses on the optimization of hot standby operations for the EB system. First, mathematical models of an electrode immersion EB and its accompanying deaerator were established. Then, a control simulation platform of the EB system was developed in MATLAB/Simulink implementing the established mathematical models and corresponding control systems. Finally, two optimization strategies for the EB hot standby operation were proposed, followed by dynamic simulations of the EB system transient from hot standby to normal operations. The results indicate that the proposed optimization strategies can significantly speed up the transient response of the EB system from hot standby to normal operations and reduce the power consumption in hot standby operations, improving the dynamic performance and economy of the system.