Transactions of the Korean Society of Automotive Engineers
/
v.4
no.1
/
pp.123-133
/
1996
From the experimental study of wire-cut Electric Discharge Machining of alloyed tool steel and tungsten carbide, the characteristics such as cutting speed, surface roughness has been observed and evaluated for various conditions. Cutting speed is improved as peak discharge current and wire tension become increased, and gap voltage and spark cycle decreased. Surface roughness can be better when peak discharge current and gap voltage become smaller, or spark cycle and wire tension become larger. Secondary cut is recommended to obtain high precision and good quality.
The Transactions of The Korean Institute of Electrical Engineers
/
v.60
no.1
/
pp.131-137
/
2011
This paper analyzes EM(Electromagnetic) characteristic in the high voltage connector for the hybrid electric vehicle. The connector bridges the electrical components and helps transferring electrical power and signal through it. The necessity of the high voltage and current connector development is emphasized because the hybrid electric vehicle recently uses the high voltage and current more than 500V and 80A. So far there has not been international EMC (Electromagnetic Compatibility) standards to limit the RE(Radiation Emission) from the connector for the hybrid electric vehicle. In this paper we analyzed EM characteristic of the 288V, 65A connector to check if the RE from the high voltage connector could be within the RE limit standard of vehicle. Three-dimensional modeling and simulation was conducted by using MWS(Microwave Studio) of the CST corporation, and the result was compared with the measured RE data, which showed good coincidence each other.
Kim, Chong-Min;Han, Woon-Ki;Bang, Sun-Bae;Kim, Han-Sang
The Transactions of the Korean Institute of Electrical Engineers P
/
v.56
no.4
/
pp.195-200
/
2007
This paper describes the countermeasures for preventing the electric shock which can be occurred in the low-voltage handhole underwater. Low-voltage handholes were designed and made for the test in the testing field. Which were installed 4 cases. a metal handhole cover was employed in case 1; FRP(Fiber glass Reinforced Plastic) handhole cover in case 2; an insulated rubber was put on the joint of the cables in case 3; the exposed conductors(cover, frame etc) were commoned and grounded in case 4. Thus, an ground potential near the low-voltage handhole was measured and evaluated quantitatively for the 4 cases. The measured results show that the potential of case 2.3 were lower than that of case 1 because the insulated rubber and the FRP cover prevented direct contact to the fault point. The case 4 is the lowest among the 4 cases because the common and grounding helps the fault current release into the ground, which makes the ground potential rise lower. As a result, although each case has the defects, these ways can effectively lower the electric shock risk in the low-voltage handhole.
Because on the high-tension underground distribution line of an electric railway high voltage XLPE Cable two or three circuits between railway stations with a standard as receiving transformer facilities are established at a $30km{\sim}50km$ interval, reactive power in which the phase of a current is larger than that of a voltage is supplied when trains are not working, so when there are no loading or low loading as night. Due to the long-distance trend of the underground distribution system on an alternating current railway distribution line, the terminal voltage of a transformer is over the standard voltage, and after all, commercial cycle overvoltage is continued. To solve this problem, the shunt reactor is installed in middle of power distribution lines to maintain receiver voltage meted under the allowance regulation through control of the reactive power. Also, in case that the thickness of single cable is over $60mm^2$ and length of line is about over 30km, a circuit breaker is broken by shorting shunt ability of charging current in excess of shunt current(31.5A.rms). Therefore, this thesis presents installing the location of shunt reactor for quantitative analysis by using optimum algorism for compensation and control of the charging current.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.52
no.9
/
pp.493-499
/
2003
This paper presents exact Autotransformers(ATs)-fed AC electric Railroad system modeling using constant current mode for locomotives. An AC electric railroad system is rapidly changing single-phase load, and at a feeding substation, 3-phase electric power is transferred to paired directional single-phase electric power. As the train moves along a section of line between two adjacent ATs. The proposed AC electric railroad system modeling method considers the line self-impedances and mutual-impedances. The constant current mode model objectives are to calculate the catenary and rail voltages with the loop equation. When there are more than one train in the AC electric railroad system, the principle of superposition applies and the only difference between the system analyses for one train. Filially, this paper shows the general equation of an AC electric railroad system, and that equation has no relation with trains number, trains position, and feeding distance.
Kim, Doo-Hyun;Park, Jong-Young;Kim, Sung-Chul;Lee, Jong-Ho
Journal of the Korean Society of Safety
/
v.25
no.2
/
pp.29-34
/
2010
This paper is aimed to develop monitoring software for detecting the characteristics of current and voltage signals for series arc on electric wire. In order to attain this purpose, the characteristics of series arc were analyzed by the current and voltage signals on electric wire which were installed, and also analyzed by the changes of RMS, instantaneous of waveform value in time domain and THD in frequency domain. Monitoring program which analyze the signal was developed by Labview which can analyze in time domain and frequency domain, and save data. Experimental setup for detecting verification of monitoring program was composed loads of a lamp, an electric heater and an electric fan loads which were usually using. Measurement points for detecting verification of monitoring program were selected at both the panel board and the arc generator at the same time. As results of the experiments by monitoring program, the arc current waveform showed the same characteristic in all measurement points of all load. But the arc voltage waveform was different in each measurement point. When arc occurred, the THD of current value increased above 20%. The results of this study will be effectively used in developing the preventive system of electric fire by series arc.
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.2
/
pp.342-348
/
2015
In this paper, fuel cell power generation system that is being studied in recent railway field was applied to compensate for the voltage drop due to the load as driving electric vehicle. PSIM simulation program is to be used to implement the modeling of the electric railway for AC AT feeder system. For it, It was applied to the product-type single-phase PLL algorithm, step-down converter is controlled as power so as to have the fuelcell generation system. Based on it's result, a reactive power due to the catenary impedance in accordance with the current flowing is compensated as linked with fuelcell generation system which supplied the current to the power supply grid. and then its performance was confirmed that voltage compensation effect obtained at SubStation (SS), SubSectioning Post (SSP), Sectioning Post (SP).
The electric railway has been widely used as a transportation all over the world. It also was opened in 1973 in korea and it has been steadily proceeded in making electric railway network for a big city and building Keongbu high speed , electric railway. That's why the system of electric railway is able to solve the environmental pollution and operate the useful energy in environmental ways, it helps to increase the ability of transportation and to decrease the cost. Because of the advantage of making the economic situation better, the system of electric railway is trying to do their best in developing technique of electric railway. Because of the increasing of transportation and the high speed operation, cars with regenerative braking system was adapted. Therefore, unbalanced voltage and current of three phase system and the drop and rise of voltage of feeding circuit is expected. Now that building the substation, newly spends lots of costs and time, it is a very difficult situation to solve the problem. We can guess that electric railway line can't receive power from the power system of bigger size in building newly electric railway. In this paper, it was proved that series voltage compensator was suitable as a solution according to voltage drop and voltage fluctuating through computer simulation.
Electric vehicle use independent electricity of high voltage. if isolation of electricity is destructed, devices and people are considerably damaged. Therefore, detection of ground fault is necessary for electric vehicle. As the existing detection method of ground fault can not detect ground fault when isolation of both positive side and negative side of electricity is destructed, and change of voltage of electricity. This paper proposed detection method for ground fault of both two sides of electricity and change of voltage. The proposed method is verified by analysis of equivalent circuit.
Proceedings of the Korean Society of Machine Tool Engineers Conference
/
1996.03a
/
pp.132-136
/
1996
A Study is a experiment which is figure out to aptimum discharge cutting condition of the surfaceroughness, electric discharging speed and electro wear ratio with Ton Toff and V(voltage) as an input condition according to the current(Ip) in an electric spark machine ; 1)Electrode is utilized Cu(coper) and Graphite. 2)Work piece is used the material of carbon steel. The condition of experiment is; 1)Current is varied 0.7(A) to 50(A). 2)Pulse time(Ton) is varied 3($\mu$s) to 240($\mu$s) and also Toff is varied 7($\mu$s) to 20($\mu$s). 3)The time of electric discharging to work piece in each time is 30(min) to 60(min) 4)After the upper side of work piece was measured in radius (5${\mu}{\textrm}{m}$) of syulus analyzed the surface roughness to made the table and graph of Rmax by yielding data. 5)Electro wear ratio is; \circled1Coper was measured cx-machining and post machining but the electronic baiance. \circled2The ex-machining of graphite measured by it, the post-machining was found the data from volume specific gravity and analyzed to made its table and graph on ground the data 6)In order to keep the accuracy of voltage affected to the work piece was equipped with the A.V.R(Automatic Voltage Regulator). 7)The memory scope was sticked to the electric spark machine. 8)In order to preserve the precision of current, to get rid of the noise occured by internal resistance of electric spark machine and to force injecting for the discharge fluid, it made the fixed table for a work piece to minimize the work error by means of one's failure during the electric discharging According to above results, the surface roughness by the variation of electrodw and current was analyzed to compare KS(Korea Standards) It was decided the optimum condition of electric discharge cutting through analyzing the effect of electric discharge speed and electro wear ratio.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.