• Title/Summary/Keyword: effort estimation

Search Result 285, Processing Time 0.031 seconds

Parameter Impact Applied Case-based Reasoning Cost Estimation

  • Joseph Ahn;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Sooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.475-478
    • /
    • 2013
  • To carry out a one-off construction project successfully, effective and accurate early cost estimation is crucial, especially during the conceptual stage where very limited minimum information of construction project is given. As the level of accuracy of the early cost estimation has huge impacts on precise budgeting and cost management of a project, in other words, reducing the risk of a project, cost must be managed with special awareness. In an effort to improve the estimate accuracy of cost during the conceptual stage, this research introduces a Parameter Impact (PI) which can quantify weights of parameters and rank them; and PI development derived from the principle of impulse in physics is explicated. For a case study, 76 public apartment building cases in Korea are analyzed. To examine the validity of the proposed PI, a validation in terms of CBR applicability test and estimate accuracy comparisons using 10-nearest neighbor cases are carried out. The validation results support that the suggested PI can be applied in quantifying the weights of the parameters and CBR method for early cost estimation.

  • PDF

A study on the fault detection efficiency of software (소프트웨어의 결함 검출 효과에 관한 연구)

  • Kim, Sun-Il;Che, Gyu-Shik;Jo, In-June
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.12 no.4
    • /
    • pp.737-743
    • /
    • 2008
  • I compare my parameter estimation methodoloay with existing method, considering both of testing effort and fault detecting rate simultaneously in software reliability modeling. Generally speaking, fault detection/removal mechanism depends on how apply previous fault detection/removal and testing effort of S/W. The fault removal efficiency makes large influence to the reliability growth, testing and removal cost in developing stage S/W. This is very useful measure during all the developing stages and much helpful for the developer to estimate debugging efficiency, and furthermore, to anticipate additional working amount.

An Effort Estimation Model for Software Maintenance Project (소프트웨어유지보수 프로젝트의 투입인력 규모예측 모형)

  • 안연식
    • Journal of the Korea Society of Computer and Information
    • /
    • v.4 no.2
    • /
    • pp.61-69
    • /
    • 1999
  • In this study, the productivity factors of software maintenance are categorized into the three areas such as maintainer characteristics, software technical characteristics and maintenance environment characteristics. And the various regression analyses are performed for searching the most significant model by using actual project's data. At conclusion, an linear model including new variables derived from factor analysis to estimate the effort for software maintenance project is suggested.

  • PDF

Remaining service life estimation of reinforced concrete buildings based on fuzzy approach

  • Cho, Hae-Chang;Lee, Deuck Hang;Ju, Hyunjin;Kim, Kang Su;Kim, Ki-Hyun;Monteiro, Paulo J.M.
    • Computers and Concrete
    • /
    • v.15 no.6
    • /
    • pp.879-902
    • /
    • 2015
  • The remaining service life (RSL) of buildings has been an important issue in the field of building and facility management, and its development is also one of the essential factors for achieving sustainable infrastructure. Since the estimation of RSL of buildings is heavily affected by the subjectivity of individual inspector or engineer, much effort has been placed in the development of a rational method that can estimate the RSL of existing buildings more quantitatively using objective measurement indices. Various uncertain factors contribute to the deterioration of the structural performance of buildings, and most of the common building structures are constructed not with a single structural member but with various types of structural components (e.g., beams, slabs, and columns) in multistory floors. Most existing RSL estimation methods, however, consider only an individual factor. In this study, an estimation method for RSL of concrete buildings is presented by utilizing a fuzzy theory to consider the effects of multiple influencing factors on the deterioration of durability (e.g., concrete carbonation, chloride attack, sulfate attack), as well as the current structural condition (or damage level) of buildings.

Adjustment of Load Regression Coefficients and Demand-Factor for the Peak Load Estimation of Pole-Type Transformers (주상 변압기 최대부하 추정을 위한 부하상관계수 및 수용율 조정)

  • Yun, Sang-Yun;Kim, Jae-Chul;Park, Kyung-Ho;Moon, Jong-Fil;Lee, Jin;Park, Chang-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.2
    • /
    • pp.87-96
    • /
    • 2004
  • This paper summarizes the research results of the load management for pole transformers done in 1997-1998 and 2000-2002. The purpose of the research is to enhance the accuracy of peak load estimation in pole transformers. We concentrated our effort on the acquisition of massive actual load data for modifying the load regression coefficients, which related to the peak load estimation of lamp-use customers, and adjusting the demand-factor coefficients, which used for the peak load prediction of motor-use customers. To enhance the load regression equations, the 264 load data acquisition devices are equipped to the sample pole transformers. For the modification of demand factor coefficients, the peak load currents are measured in each customer and pole transformer for 13 KEPCO (Korea Electric Power Corporation) distribution branch offices. Case studies for 50 sample pole transformers show that the proposed coefficients could reduce estimating error of the peak load for pole transformers, compared with the conventional one.

A Study on Effort Estimation Model in Software Development Using Component Tools (컴포넌트 개발 툴을 사용한 소프트웨어 개발 노력도에 관한 연구)

  • 서정석;김승렬
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.5 no.3
    • /
    • pp.18-29
    • /
    • 2000
  • This study presents a cost of efforts estimation model under the environment of developing a software using component software package tools. The approach taken was to drive from variety of sources in an attempt to identify the most significant factors. These sources ranged from already existing cost models like COTS integration cost and COCOMO models to information gathered in a data collection survey. Once the candidate drivers had been identified, the next step was to interview with the experts who had been experienced more than 5 years in component development area to identify the most significant driving factors. From those selected drivers, I established the Cost Estimation Model which is suitable for the developing a software using component software package tools by applying the general from of the well-know COCOMO software cost estimation model. To established the best fit in Korean Software industry, I used Regression statistical analysis with 31 data collections.

  • PDF

An Enhanced Function Point Model for Software Size Estimation: Micro-FP Model (소프트웨어 규모산정을 위한 기능점수 개선 Micro-FP 모형의 제안)

  • Ahn, Yeon-S.
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.12
    • /
    • pp.225-232
    • /
    • 2009
  • Function Point Method have been applied to measure software size estimation in industry because it supports to estimate the software's size by user's view not developer's. However, the current function point method has some problems for example complexity's upper limit etc. So, In this paper, an enhanced function point model. Micro FP model, was suggested. Using this model, software effort estimation can be more efficiently because this model has some regression equation. This model specially can be applied to estimate in detail the large application system's size Analysis results show that measured software size by this Micro FP model has the advantage with more correlative between the one of LOC, as of 10 applications operated in an large organization.

Decision of Neural Network Architecture for Software Development Effort Estimation using Prior Information (사전 정보를 이용한 소프트웨어 개발노력 추정 신경망 구조 결정)

  • 박석규;유창열;박영목
    • Journal of the Korea Computer Industry Society
    • /
    • v.2 no.9
    • /
    • pp.1191-1198
    • /
    • 2001
  • An increasingly important facet of software development is the ability to estimate the associate cost and effort of development early in the development life cycle. Most of the proposed models are based upon a combination of intuition, expert judgement, and regression analysis of empirical data. Overall, the work has failed to produce any single model that can be applied with a reasonable degree of success to a variety of environments. This paper presents a neural network (NN) model that related software development effort to software size measured in function element types. The heuristic approach is applied to decide the number of hidden neurons in NN from the relationship between input-output pairs. The research describes appropriate NN modeling in the context of a case study for 24 software development projects. Also, this paper compared the NN model with a regression analysis model and found the NN model has better accuracy.

  • PDF

A Study on Reduced Variance Self-Tuning Algorithm Using a Variable Forgetting Factor (시변 망각 인자를 사용하는 최소 자승 추정의 극점 -배치 자기동조 알고리즘에 관한 연구)

  • Park, Chan-Young;Do, Mi-Sun;Park, Mi-Gnon;Lee, Sang-Bae
    • Proceedings of the KIEE Conference
    • /
    • 1988.07a
    • /
    • pp.305-308
    • /
    • 1988
  • Pole assignment controller with variable forgetting factor is generalizaed to allow the output and/or input variance to be reduced. The algorithm can give significant reductions in variance for little extra computational effort and is presented for servo-tracking using leat-squares estimation. Moreover, the use of a variable forgetting factor with correct choice of information bound can avoid 'blowing-up' of the covariance matrix of the estimates and subsequent unstable control.

  • PDF

소프트웨어 비용추정 모형에 관한 소고

  • Kim, In-Su;Lee, Dae-Gi
    • ETRI Journal
    • /
    • v.9 no.3
    • /
    • pp.139-156
    • /
    • 1987
  • The problems in software cost management are well known. Cost estimates are too low. Software development projects frequently have cost overruns, which are due to poor estimates. A fair amount of work have been done toward developing cost estimation models. These models vary in their outputs (e. g., total cost, manning schedule) and in the factors used to calculate their estimates. They also vary with regard to the type of formula, parameters, use of previous data, and staffing considerations. This paper will distinguish them by the type of formula they use to calculate total effort and staffing level, and will discuss enough models to demonstrate the characteristics of each model category.

  • PDF