• 제목/요약/키워드: effluent treatment

검색결과 1,092건 처리시간 0.026초

방류수질 예측을 위한 AI 모델 적용 및 평가 (Application and evaluation for effluent water quality prediction using artificial intelligence model)

  • 김민철;박영호;유광태;김종락
    • 상하수도학회지
    • /
    • 제38권1호
    • /
    • pp.1-15
    • /
    • 2024
  • Occurrence of process environment changes, such as influent load variances and process condition changes, can reduce treatment efficiency, increasing effluent water quality. In order to prevent exceeding effluent standards, it is necessary to manage effluent water quality based on process operation data including influent and process condition before exceeding occur. Accordingly, the development of the effluent water quality prediction system and the application of technology to wastewater treatment processes are getting attention. Therefore, in this study, through the multi-channel measuring instruments in the bio-reactor and smart multi-item water quality sensors (location in bio-reactor influent/effluent) were installed in The Seonam water recycling center #2 treatment plant series 3, it was collected water quality data centering around COD, T-N. Using the collected data, the artificial intelligence-based effluent quality prediction model was developed, and relative errors were compared with effluent TMS measurement data. Through relative error comparison, the applicability of the artificial intelligence-based effluent water quality prediction model in wastewater treatment process was reviewed.

농업용수재이용을 위한 하수처리장 현황조사 (Investigation of Effluent of Wastewater Treatment Plants for Agriculture Reuse)

  • 이광야;김해도;정광근;이종남
    • 한국농공학회:학술대회논문집
    • /
    • 한국농공학회 2005년도 학술발표논문집
    • /
    • pp.521-526
    • /
    • 2005
  • Water Quality of effluent from wastewater treatment plants was reviewed to reuse effluent for agricultural water as alternative water resources. Among 2004, wastewater treatment plants, 19 plants are found to be used as wastewater resources applicable to irrigation. The total effluent capacities are 9,293 thousand $m^3$per day, which may be used to irrigate paddy fields. In order to know how much the effluent can be use for agricultural water, we classified the effluent according to the river basin area and evaluated the water quality of the effluent.

  • PDF

소규모 농산가공시설 배출수 처리시설 개선방안 (A Study on the Improvement of Effluent Treatment from Small Scale Agro-food Processes)

  • 김영진;전종길;김민영;최용훈
    • 농촌지도와개발
    • /
    • 제23권4호
    • /
    • pp.361-374
    • /
    • 2016
  • This study examined the regulation status on wastewater treatment in agro-food processing and a case study on effluent treatment m ethods was carried out to evaluate any change after the mitigation of regulation. First, in order to clarify the area of investigation, the definition of small-scale agro-processing facilities was reviewed through literature survey and local government ordinance. The current law were separately analyzed into four areas; effluent treatment facilities, development of agro-processing industries, land use and food processes equipment. The exclusion clauses on wastewater discharging facility in the enforcement regulation were defined in detail, which can be served in practice. Site survey, after the questionnaire survey of the person in charge of the local unit, was carried out. As the result, this survey confirmed the positive effects of the deregulation on promoting sewer system service in rural areas, introducing the new processing construction and so on. In addition, it was found that some matters to be considered to determine whether to introduce wastewater treatment plan for public food processing facilities.

유역하수도 공공하수처리시설의 방류수 수질 준수농도 설정방안 연구: 진위천 수계를 중심으로 (A study on Determination Method of the Compliance Concentration of Effluent Limitation from Public Sewage Treatment Works in the Jinwee-stream Watershed Sewer System)

  • 정동환;조양석;김영석;안경희;정현미;권오상
    • 상하수도학회지
    • /
    • 제29권4호
    • /
    • pp.493-502
    • /
    • 2015
  • In accordance with the Watershed Sewer System Maintenance Plan enforced on February 2, 2013, the different compliance concentration of effluent limit be applied to effluent discharged from public sewage treatment works(PSTWs) in each watershed on the basis of water quality thereof. With the introduction of watershed sewer system, it is necessary to set the compliance concentration of effluent limit for PSTWs situated in the watershed, by region and PSTW size, to achieve water quality criteria for regional watersheds or target water quality under TMDL program. Watershed Environmental Agencies establish the Watershed Sewer System Maintenance Plan and set the compliance concentrations of effluent limit for PSTWs under the plan. The agencies plan to apply tougher effluent BOD concentration limits in Class I to IV areas. Effluent BOD concentration limits will be toughened from 5~10 mg/L to 3 mg/L in class II~III areas, from 10mg/L to 5mg/L in class IV areas. Uniform application of effluent BOD concentration limits to PSTWs in the watershed sewer system need to be complemented considering type of sewage treatment technology employed and watershed characteristics. Therefore, this study presents method to determine the compliance concentration of effluent limit from PSTWs in the watershed.

구미시 하수처리 방류수가 하류 하천 영양염류에 미치는 영향: 부하량 비교 (Effects of Gumi City Sewage Treatment Effluent in the Downstream Nutrient Matter: Comparison of Daily Loading)

  • 성진욱;이상팔;이재균;박제철
    • 한국환경과학회지
    • /
    • 제22권12호
    • /
    • pp.1643-1650
    • /
    • 2013
  • This study investigated water quality of effluents and stream from the sewage treatment plants located at Gumi Complex 4, Gumi, and Wonpyeong in Gumi. Downstream region was found to increase the concentration of nutrients for sewage treatment plant effluent. Both phosphorus and nitrogen were accounted most as soluble form. In particular, the high ratio of dissolved effluent of sewage treatment plants were investigated. In the streams, Phosphorus concentration was high during rainy season and nitrogen concentration was high in the dry season. Sewage treatment plant effluent was relatively less microbial activity and nutrient concentrations were higher in the winter. TN/TP ratio was the highest in the upstream region and the lowest in the sewage treatment plant effluent. The effect of the nutrient matter from a discharge of a sewage treatment plant on rivers varied depending on the size of the river and the treatment plant. However, the influence of the concentration was greater than that of flowrate. Sewage treatment plant effluent loads phosphorus, nitrogen accounted for 8% and 6% respectively at the point N3 of the Nakdong river.

인공습지의 농촌지역 오수정화시설에 적용가능성 연구 (Feasibility Study of Constructed Wetland for the Wastewater Treatment in Rural Area)

  • 윤춘경;권순국;권태영
    • 한국농공학회지
    • /
    • 제40권3호
    • /
    • pp.83-92
    • /
    • 1998
  • Field experiment was performed from August 1996 to January 1998 to examine the applicability of constructed wetland system for wastewater treatment in rural area. The pilot plant was installed in Kon-Kuk University and the school building septic tank effluent was used as an influent to the treatment basin. Hydraulic loading rate was about 0.1 6$0.16^3/m^2$ day and theoretical detention time in the system was 1.38 days. The treatment basin was composed of sand and reed. The influent DO concentration was low and many cases close to zero, but effluent concentration was higher than the influent which implies that oxygen was supplied naturally. The average concentration of influent BOD was 126mg/L, and with average removal rate of 69 % the average effluent concentration was 4Omg/L which satisfied the effluent water quality standard for the system of interest. The average influent concentration of COD was 2Olmg/L and average effluent concentration was 75mg/L with average removal rate of 60%. The performance of BOD and COD tends to deteriorate in the low temperature, and appropriate action needs to be taken during the cold winter time for stable operation. The average influent concentration of SS was 5Omg/L, and effluent was 1 1mg/L with average removal rate of 76% which satisfied the effluent water quality standard for the system of interest. The results for the regulated components, SOD and SS, from the experiment showed that constructed wetland system can meet the effluent water quality standards. The average influent concentration of total phosphorus was 25.6mg/L and average effluent concentration was 7.8mg/L with average removal rate of 63%. Not like the performance of the above components, average nitrogen removal rate was only 11.2% which is not satisfactory. Although, nitrogen is not regulated at this moment, it can cause many environmental problems including eutrophication. Therefore, nitrogen removal efficiency should be improved for actual application. From the result of the field experiment, constructed wetland system was thought to be an appropriate alternative for wastewater treatment in rural area.

  • PDF

공공하수처리시설 방류수 TOC에 영향을 주는 요인 분석 (Analysis of factors affecting effluent TOC in publicly owned treatment works)

  • 강성주;강병준;박규홍;정동환;이원석;정현미
    • 상하수도학회지
    • /
    • 제33권2호
    • /
    • pp.141-150
    • /
    • 2019
  • Total organic carbon(TOC) was introduced as the water quality index of the rivers and lakes in 2013. This paper evaluated factors affecting effluent TOC concentrations and treated and discharged loads of existing publicly owned treatment works(POTWs). For selected POTWs with greater treatment capacity than $500m^3/day$, factorial analysis was used to consider effects of kinds of biological treatment processes, inflow of other types of wastewater(industrial, livestock, landfill leachate wastewater, etc.) with domestic wastewater, sewer separation rate, and effluent discharging zones in which different effluent criteria applied. As a result, those factors did not show significant effect on effluent TOC concentration of POTWs in effluent discharging zone I and II. However, In effluent discharging zone III and IV, kinds of biological treatment processes, the inclusion of other waste in influent of domestic wastewater, and the sewer separation rate were significant factors. The treated TOC load in POTWs was also not affected significantly by the variables set in this study. On the other hand, those three factors influenced significantly on the TOC load discharged to water bodies. The sum of factorial effects and the contribution rate of three factors to the discharged TOC load was 60.23 and 41%, 59.57 and 41%, and 42.04 and 18%, respectively.

하수처리장 방류수를 이용한 인공함양 가능성 평가

  • 김병군;서인석;홍성택;김형수
    • 한국지하수토양환경학회:학술대회논문집
    • /
    • 한국지하수토양환경학회 2002년도 추계학술발표회
    • /
    • pp.257-260
    • /
    • 2002
  • The main purpose of this research is to find suitable treatment methods of wastewater effluent for artificial recharge. For this purpose, we search the effluent quality of wastewater treatment plant and possibility of additional filtration process. Particles ranged 2 ~ 5 ${\mu}{\textrm}{m}$ and 15~20 ${\mu}{\textrm}{m}$ in "T" WWTP(Waste Water Treatment Plant) effluent were relatively dominant. In dual-media filtration system operation, head-loss development of column 1 was about two times faster than column 2, and head-loss development within 5 cm from surface was very important factor in operation, Conclusively, for the stable filtration and running time of 1.5~2 day, influent turbidity must keep 5 NTU or below, and filtration system must operated at 280 m/day or below. After filtration of WWTP effluent, water quality reached satisfactory level. This water has potential of agricultural reusing, flushing water in building, recharging water to river or stream at dry season and artificial recharge of ground water.und water.

  • PDF

연못을 이용한 동절기 인공습지 오수처리수의 추가 처리 (Pond System for Further Polishing of Constructed Wetland Effluent during Winter Season)

  • 윤춘경;전지홍;김민희;함종화
    • 한국농공학회지
    • /
    • 제44권4호
    • /
    • pp.139-148
    • /
    • 2002
  • Pilot study was performed to examine the feasibility of the pond system for further polishing of treatment wetland effluent from December 2000 to June 2001. The wetland system used for the experiment was highly effective to treat the sewage during the growing season, but it was less effective and its effluent was still high to discharge to the receiving water body. Therefore, the wetland effluent may need further treatment to prevent water quality degradation. Pond system could be used to hold and further polish the wetland effluent during the winter season and ots feasibility was evaluated in this study. Additional water quality improvement was apparent in the pond system during winter season, and the pond effluent could be good enough to meet the effluent water quality standards if it is properly managed. Timing of the pond effluent discharge appears to be critical for pond system management because it is a closed system and whole water quality constituents are affected by physical, chemical, and biological pond environments. Once algae started to grow in mid-April, constituents in the pond water column interact each other actively and its control becomes more complicated. Therefore, upper layer of the pond water column which is clearer than the lower layer my need be discharged in March right after ice cover melted. In the experiment, water quality of the upper water column was markedly clear in March than ant other times probably because of freezing-thawing effect. The remaining lower water column could be further treated by natural purification as temperature goes up or diluted with better quality of wetland effluent for appropriate water uses. This study demonstrated the feasibility of pond system for subsequent management of wetland effluent during the winter season, however, more study is needed for field application.

우리나라 공공하수처리시설의 TOC 배출특성 및 관리방안 연구 (Characteristics of TOC in effluent discharge from public sewage treatment works in korea)

  • 정동환;최인철;조양석;안경희;정현미;권오상;박후원;신현상;허진
    • 상하수도학회지
    • /
    • 제28권6호
    • /
    • pp.657-668
    • /
    • 2014
  • Under Korea's Enforcement Decree of the Framework Act on Environmental Policy amended in 2013, total organic carbon (TOC) is newly added as water quality parameter to assess organic pollution in water and aquatic ecosystem. To meet the TOC requirement and improve quality of effluent discharged into public watershed, it is also necessary to develop standards for TOC in effluent from public sewage treatment works (PSTWs). In this study, we reviewed the characteristics and removal efficiency of TOC in influent and effluent of PSTWs. The study found that phosphorus treatment process removed not only soluble phosphorus but also a portion of TOC remaining after the secondary treatment process. TOC concentration in effluent from PSTWs operated in tandem with industrial wastewater treatment work was higher due to influx of insoluble substances from the industrial wastewater treatment work. In order to lay a foundation for the management of TOC from PSTWs, it is necessary to carry out research on TOC from different perspectives. For example, studies on the generation mechanism of TOC and the impact of TOC on drinking water resources, assessment of effluent qualities through monitoring, and development of measures to control TOC for the preservation of aquatic ecosystem are needed.