• 제목/요약/키워드: economic limit

검색결과 453건 처리시간 0.025초

Enhanced Particle Swarm Optimization for Short-Term Non-Convex Economic Scheduling of Hydrothermal Energy Systems

  • Jadoun, Vinay Kumar;Gupta, Nikhil;Niazi, K. R.;Swarnkar, Anil
    • Journal of Electrical Engineering and Technology
    • /
    • 제10권5호
    • /
    • pp.1940-1949
    • /
    • 2015
  • This paper presents an Enhanced Particle Swarm Optimization (EPSO) to solve short-term hydrothermal scheduling (STHS) problem with non-convex fuel cost function and a variety of operational constraints related to hydro and thermal units. The operators of the conventional PSO are dynamically controlled using exponential functions for better exploration and exploitation of the search space. The overall methodology efficiently regulates the velocity of particles during their flight and results in substantial improvement in the conventional PSO. The effectiveness of the proposed method has been tested for STHS of two standard test generating systems while considering several operational constraints like system power balance constraints, power generation limit constraints, reservoir storage volume limit constraints, water discharge rate limit constraints, water dynamic balance constraints, initial and end reservoir storage volume limit constraints, valve-point loading effect, etc. The application results show that the proposed EPSO method is capable to solve the hard combinatorial constraint optimization problems very efficiently.

Rational Criterion of Suing and Labouring Charge in Marine Insurance -Using Game Theoretic Approach-

  • Kang, Jun-Won
    • 한국항만경제학회지
    • /
    • 제20권2호
    • /
    • pp.73-87
    • /
    • 2004
  • The purpose of this paper is to setup reasonable criterion for underwriters to reimburse the expenses of suing and labouring incurred by assured, using game theory. As for the upper limit for the reimbursement, MIA and ICC do not mention at all but stipulate that proper and reasonable expenses shall be reimbursed, while ITC-Hulls set the amount insured as the upper limit to compensate the sum of expenses and damage loss. And as for failed measures of averting and minimizing loss, MIA and ICC do not mention either, while ITC-Hulls stipulates underwriters shall compensate the expenses and damage loss within the amount insured. The main results of this paper are as follows: First, it is for the benefit of underwriters to reimburse the expenses incurred to take such reasonable measures to avert or minimizing a loss which would be recoverable under the insurance. Second, the expenses of single measure should not be above the amount insured. Third, even if the measures failed, the expense should be reimbursed if it is less than the expected value of the subject-matter insured that could be recovered by the measures. Last, if the measures are taken several times individually, even if the sum of expenses might be above the amount insured, it should be reimbursed.

  • PDF

지구정보시스템을 이용한 금수산일대의 암반사면 안정성 평가 (Analysis of Rock Slope Stability by Using GIS in Mt. Keumsu Area)

  • 배현철
    • 자원환경지질
    • /
    • 제33권1호
    • /
    • pp.77-88
    • /
    • 2000
  • The goal of this study is to assess the spatial distribution of natural slopes and cutting slopes under would-be development. For this goal, a quantitative slope stability analysis method using GIS integrated with a computer program was developed. Through field investigations, the discontinuity parameters were collected such as orientation of discontinuity, persistence, spacing, JRC, JCS, and water depth. The distributions were interpolated from the ordinary kriging method in ARC/INFO GIS after variogram analysis. The layers showing all parameters needed for limit equilibrium analysis were constructed. The final layer using GIS works composed of 162,352 polygons, that is, unit slopes. The rock slope stability analysis program was coded by C++ language. This program can calculate geometrical vectors related to rock block failures using input orientation data and direction and dimension of strength to occur failure. Also, this can calculate shear strength of joints through empirical equations and quantitative factors of safety. This methodology was applied to the study area which is located in Jaecheon city and Danyang-gun of the northeastern Keumsu is about 135$km^2$. As a result, the study area was entirely stable but unstable, that is, factor of safety less than 1.0dominantly at the slopes near Keumsil, Daejangri, Keumsungmyun and Sojugol, Mt. Dongsan, Juksongmyun by the natural slope stability analysis. Assuming the cutting slope showing the same direction immediate, and quantitative analysis of factors of safety for a regional area could be conducted through GIS integrated with a computer program of limit equilibrium.

  • PDF

Economic performance of cable supported bridges

  • Sun, Bin;Zhang, Liwen;Qin, Yidong;Xiao, Rucheng
    • Structural Engineering and Mechanics
    • /
    • 제59권4호
    • /
    • pp.621-652
    • /
    • 2016
  • A new cable-supported bridge model consisting of suspension parts, self-anchored cable-stayed parts and earth-anchored cable-stayed parts is presented. The new bridge model can be used for suspension bridges, cable-stayed bridges, cable-stayed suspension bridges, and partially earth-anchored cable-stayed bridges by varying parameters. Based on the assumption that each structural member is in either an axial compressive or tensile state, and the stress in each member is equal to the allowable stress of the material, the material quantity for each component is calculated. By introducing the unit cost of each type of material, the estimation formula for the cost of the new bridge model is developed. Numerical examples show that the results from the estimation formula agree well with that from the real projects. The span limit of cable supported bridge depends on the span-to-height ratio and the density-to-strength ratio of cables. Finally, a parametric study is illustrated aiming at the relations between three key geometrical parameters and the cost of the bridge model. The optimization of the new bridge model indicates that the self-anchored cable-stayed part is always the dominant part with the consideration of either the lowest total cost or the lowest unit cost. It is advisable to combine all three mentioned structural parts in super long span cable supported bridges to achieve the most excellent economic performance.

Cost optimization of reinforced high strength concrete T-sections in flexure

  • Tiliouine, B.;Fedghouche, F.
    • Structural Engineering and Mechanics
    • /
    • 제49권1호
    • /
    • pp.65-80
    • /
    • 2014
  • This paper reports on the development of a minimum cost design model and its application for obtaining economic designs for reinforced High Strength Concrete (HSC) T-sections in bending under ultimate limit state conditions. Cost objective functions, behavior constraint including material nonlinearities of steel and HSC, conditions on strain compatibility in steel and concrete and geometric design variable constraints are derived and implemented within the Conjugate Gradient optimization algorithm. Particular attention is paid to problem formulation, solution behavior and economic considerations. A typical example problem is considered to illustrate the applicability of the minimum cost design model and solution methodology. Results are confronted to design solutions derived from conventional design office methods to evaluate the performance of the cost model and its sensitivity to a wide range of unit cost ratios of construction materials and various classes of HSC described in Eurocode2. It is shown, among others that optimal solutions achieved using the present approach can lead to substantial savings in the amount of construction materials to be used. In addition, the proposed approach is practically simple, reliable and computationally effective compared to standard design procedures used in current engineering practice.

불연속면의 특성은 고려한 보은지역 암반사면 안정성해석 (Rock Slope Stability Analysis in Boeun Region Considering Properties of Discontinuities)

  • 이지수;박혁진;민경덕;구호본
    • 자원환경지질
    • /
    • 제34권6호
    • /
    • pp.601-615
    • /
    • 2001
  • 본 연구지역인 충북 보은군 보은읍 일대는 옥천변성대에 속하며, 도로공사구간 중 1:0.:리 구배로 절취한 암반사 면내의 일부구간에서 평면파괴가 발생하였다. 이 구간은 파괴면과 동일한 방향성을 갖는 불연속면에 의해 추가붕괴가 예상되는 등 불안정한 상태이다. 따라서, 본 사면에 대해 SMR, 평사투영법, 한계평형법으로 안전성을 해석하였다. 그러나, 이러한 방법으로 해석할 수 없는 절취에 따른 암반사면의 응력재분배 및 비선형적인 변위거동에 대해서는 UDEC 을 이용하여 수치해석하고, 보강공법을 적용하여 안정성을 해석해 보았다.

  • PDF

대용량 배전계통 공급용량 증대방안에 대한 경제성 분석 (Economic Evaluations of The Alternatives to Increase the Supply Capacity For Large Customers In The Distribution Systems)

  • 박용기;노재형;박종배;최면송;김광원;김주성
    • 전기학회논문지
    • /
    • 제60권3호
    • /
    • pp.500-508
    • /
    • 2011
  • In the distribution systems, the maximum power transportation capacity is restricted within 40MW based on two lines, because of the thermal current limit of a distribution line. Recently it has been continuously required to expand the abilities of the power transportation in distribution systems, as the number of large scale industrial complexes and distributed generations are growing. In this paper, we suggested the five alternatives combining two methods, laying the two bundle lines and adding another voltage between the 22.9kV and 154kV in distribution systems. This paper implemented the economic evaluations of proposed alternatives from national and customer perspectives. And then we compare the results with those of 154kV transmission system.

장기간의 항만 폐쇄와 일시적 운영 중단이 직립 방파제 케이슨의 최적 설계에 미치는 영향 (Effects of Long-Term Harbor Shutdown and Temporal Operational Stoppage upon Optimal Design of Vertical Breakwater Caisson)

  • 서경덕;김덕래;김경숙
    • 한국해안해양공학회지
    • /
    • 제19권2호
    • /
    • pp.113-127
    • /
    • 2007
  • 본 연구에서는 직립 방파제 케이슨의 활동에 따른 복구비용, 과도한 케이슨 활동 발생시 항만 폐쇄에 따른 경제적 피해 비용 그리고 월파에 의한 일시적 작업 중단에 따른 경제적 피해 비용을 동시에 고려하는 기대 총 건설비 산정 모델을 수립하였다. 발생시점이 서로 다른 피해 비용을 일정한 기준으로 산정하기 위해 할인율을 적용하였다. 케이슨의 최적 단면은 방파제 수명 동안의 기대 활동량의 허용범위 내에서 기대 총 건설비용이 최소가 되는 단면으로 정의되며, 그 기대 활동량의 허용치는 0.3 m와 0.1 m 두 가지 경우에 대해 살펴보았다. 과도한 케이슨 활동에 의한 항만 폐쇄에 따른 경제적 피해 비용과 그 산정 기준이 케이슨 복구비용이나 월파에 의한 작업 중단에 따른 경제적 피해 비용보다 최적 단면 결정에 더 중요한 요인임을 확인하였고, 항만 폐쇄에 대한 케이슨 활동량의 임계 칼이 커질수록 케이슨의 최적 단면은 기대 총 건설비의 최소점보다 기대 활동량의 허용치에 의해 결정되는 것으로 나타났다.

의약품 보험 급여 및 가격 결정과 경제성 평가의 활용 (Use of Economic Evaluation in the Listing and Pricing of Pharmaceuticals)

  • 이태진
    • Journal of Preventive Medicine and Public Health
    • /
    • 제41권2호
    • /
    • pp.69-73
    • /
    • 2008
  • To curb a rapid increase in expenditures for pharmaceuticals, the Korean government introduced a positive list system and a negotiation process for drug prices at the end of 2006. Economic evaluation of pharmaceuticals has begun to have a pivotal role in the listing and pricing of drugs for the Korean National Health Insurance. There are some points to discuss regarding the use of economic evaluation in the listing and pricing in the context of the Korean system. First, the listing and pricing processes have been fragmented, evoking complaints from pharmaceutical companies and delaying the access of new drugs to patients. Second, there is a concern that the positive list system may limit the range and availability of drugs for patients to choose for treatment. Third, the time schedule for de-listing of existing drugs may not be realistic. Fourth, it is not always easy to provide reliable evidence of cost-effectiveness due to a lack of materials. Fifth, there is no consensus on the range of the ICER (incremental cost-effectiveness ratio) acceptable to the Korean society. In conclusion, in the near future, it will be necessary to evaluate the achievements that the economic evaluation has provided to the Korean society.

탄소세(炭素稅)를 고려한 화력발전 설비간의 경제성 평가 (Economic Analysis of Power Plant Utilities Under $CO_2$ Emission Tax)

  • 김지수;이병남;김태진
    • 산업공학
    • /
    • 제10권1호
    • /
    • pp.237-248
    • /
    • 1997
  • The purpose of this study is to make an economic analysis of power plant utilities by examining electricity generating costs with environmental consideration. Economic growth has caused pollutant emission, and subsequent environmental pollution has been identified as a very real limit to sustainable development. Considering the enormous role of electricity in the national economy, it is thus very important to study the effect of environmental regulations on the electricity sector. Because power utilities need large investments during construction, operation and maintenance, and also require much construction lead time. Economic analysis is the very important process in the electric system expansion planning. In this study, the levelized generation cost method is used in comparing economic analysis of power plant utilities. Among the pollutants discharged of the electricity sector, this study principally deals with the control activities related only to $CO_2$, and $NO_2$, since the control cost of $SO_2$, and TSP (Total Suspended Particulates) is already included in the construction cost of utilities. The cost of electricity generation in a coal-fired power plant is compared with one in an LNG combined cycle power plant. Moreover this study surveys the sensitivity of fuel price, interest rate and carbon tax. In each case, this sensitivity can help to decide which utility is economically justified in the circumstance of environmental regulations.

  • PDF