A Study on Selection of Roof Waterproofing Method by analyzing Life Cycle Costing (LCC 평가를 통한 지붕방수공법선정에 관한 연구)

  • Choi, Oh-Young;Kim, Tae-Hui;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.127-134
    • /
    • 2008
  • The purpose of this study is to propose the decision making technique in roof waterproofing method at the early construction stage. Selecting the suitable construction method is difficult because of the complex interrelationships between many factors of influencing the construction method selection. This study presents an example of selecting suitable method by analyzing LCC (Life Cycle Cost) in roof waterproofing work. In this study, roof waterproofing method is analyzed by LCC(Life Cycle Cost) which is consists of the initial costs, running costs, and removal costs. Sheet waterproofing, membrane waterproofing and asphalt waterproofing costs are compared to select the most economic method. The result of this study revealed that considering LCC is useful in selecting the proper method in the construction work.

Investigation on Construction Process and Efficiency of Underwater Construction Equipment for Rubble Mound Leveling works (수중 고르기 장비의 건설 공정 및 효율성 분석)

  • Won, Deokhee;Jang, In-Sung;Shin, Changjoo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.5
    • /
    • pp.372-378
    • /
    • 2016
  • A mound was constructed to install a caisson and sofa blocks underwater. The mound riprap, which were of uniform grade, size, shape, and specific gravity, formed the foundation for the support superstructure. Also, rubble leveling works were performed before installing structures such as caissons. In this study, underwater construction equipment was developed with a remotely controlled operating system and underwater environment monitoring system for unmanned underwater rubble leveling work. The performance of the developed equipment was verified using on-land and underwater tests. In addition to the performance verification, the construction process and economic efficiency of the equipment should be checked before applying it to the real construction field for commercial purposes. In this paper, a construction process using the developed equipment was proposed and compared with the existing rubble leveling method. The results demonstrated that the new construction method has higher economic efficiency and safety than the existing construction method.

Analyzing an Economic Feasibility for Restoration/Creation of Artificial Tidal Flats (인공갯벌 조성에 관한 경제적 타당성 분석)

  • Nam, Kwang-Hyun;Oh, Wee-Yeong
    • Ocean and Polar Research
    • /
    • v.25 no.4
    • /
    • pp.593-601
    • /
    • 2003
  • The purpose of this paper is to investigate economic feasibility of creating artificial tidal flats using cost-benefit analyses. We assumed that the cost factors are associated with designing, construction and monitoring, and the benefit factors are associated with fisheries production, habitation, prevention of disasters, water purification, aesthetic value and existence value. First, for analyzing economic feasibility, the scenario suggests that a design can be made in a year, construction can be completed in three years and monitoring must be made for 20 years. Assuming the discount rate of 7.5%, economic feasibility analyses showed that B/C was 2.26 and IRR was 14.50. This study indicated there is economic validity of implementing creation of artificial tidal flat. In addition, we carried out a sensitivity analysis at the change of discount rate and restoration rate. The result of sensitivity analysis clearly showed that economic validity is low when discount rate is over 15%, and changes in restoration rate did not significantly effect on the economic validity.

A Study on Construction of Metro Rapid Transit Network in Daegu Area (철도와 지역발전 - 대구권 광역전철망 구상과 지역발전 효과)

  • Han, Keun-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.06b
    • /
    • pp.27-41
    • /
    • 2008
  • Construction of metro transportation infra is a large-scale project requiring tremendous financial resources. This study suggests operation method to use for rapid transit line existing infra such as Gyeongbu line and spare line capacity following second phase KTX construction. Reviewing various constraints of metro rapid transit operation, we found that the conditions for metro rapid transit operation are already satisfied in Daegu area, just like the case of Gyeongbu line in Seoul Metro area. Also, the evaluation of the economic feasibility of metro rapid transit operation in Daegu area shows that B/C is about 2.4, which implies that there is sufficient economic feasibility. According to the result of sensitivity analysis, the project is economically feasible unless the passenger demand decreases 15% and construction costs increases more than 70%. B/C is evaluated large because the utilization of already exiting infra lowers the initial cost. As one of mass transportation system of large capacity, metro rapid transit can generate significant spillover effect: It will strengthen competitiveness of metro area by connecting cities within the area and by extending one-day life zone of the area, to say nothing of the benefit of improving traffic condition. The construction of metro rapid transit network is necessary for the mass transportation system of Yeongnam area as well as Daegu area, and it may work as a starting point for uniting Daegu and Gyeongbuk and strengthening regional competitiveness.

  • PDF

Economic analysis of irrigation facilities for securing water for field crops

  • Hyung Jin Shin;Jae Young Lee;Jae Nam Lee;Han Na Lee;Sang Hyeon Park;Bum Soo Shin;Sang Sun Cha;Se Myung Kwon;Jung Il Seo;Chan Gi Park
    • Korean Journal of Agricultural Science
    • /
    • v.50 no.4
    • /
    • pp.785-798
    • /
    • 2023
  • Considering irrigation facilities are currently insufficient and drought vulnerability due to climate change is high, efficient measures are required to secure water supply for field crops. This study, therefore, calculated the water shortage to secure water for representative field crops. An economic analysis was further conducted by comparing the production income to the input cost for each method. Here, five distinct regions were selected to represent each crop-Cheongyang-gun for chili peppers, Yesan-gun for apples, Dangjin-si for cabbages, Seosan-si for garlic, and Goesan for beans. The regions with insufficient water supply were estimated by calculating the water requirements and the supplied water from public groundwater wells for each area. A comprehensive set of four scenarios was presented as a strategy to ensure water security and manage irrigation facilities. These scenarios comprised the maintenance of existing groundwater wells, the construction of new water storage tanks, the installation of additional groundwater wells, and the utilization of surface water. B/C (benefit/cost) analysis was conducted for each scenario. As a result, the construction of water storage tanks was selected as a facility and water management plan in Cheongyang-gun, Dangjin-si, and Seosan-si. The analysis additionally indicated the economic viability of installing surface water utilization facilities in Yesan-gun and developing water storage tanks and groundwater (aquifer) wells in Goesan-gun. The results of this study are considered to serve as foundation data that may be utilized in the selection of water management plans for drought-prone areas in the future.

A Case Analysis of the Economic Impact on Accidents during Excavation (터파기 공사 사고의 경제적 영향 사례분석)

  • Go, Kwang-Ro;Lee, Ghang;Choi, Myung-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.7-10
    • /
    • 2008
  • As the land price in the downtown area increases, buildings are becoming bigger, deeper and higher. Consequently, the importance of underground construction has increased. Although construction engineers make every effort to complete underground construction without any problem, construction failures like landslides and the collapse of a retaining wall occur because of the uncertainty of the soil conditions as well as the unexpected risks of excavation work. In order to prevent potential excavation accidents, it is essential to understand the causes and impacts of such accidents. However, there are only a few examples of construction failures, which show the economic impact on accidents during excavation because of the sensibility of the information. This paper presents two cases of excavation accidents, which were investigated by construction insurance company. The compensation for the accidents paid by the insurance company was compared with the estimated costs calculated based on the estimation method for excavation accidents proposed by our previous study. The comparison results showed that the estimate calculated by our method was much less than the actual compensation because the estimate solely focused on the construction costs whereas the compensation included other external factors.

  • PDF

A Study on Motivators of Green Construction of Major Contractors based on the Political Economy Approach (대형 종합건설사의 녹색건설 동기유발요인에 관한 연구 - 정치경제 접근법을 중심으로 -)

  • Kim, Jae-Hee;Kim, Han-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.97-106
    • /
    • 2013
  • The construction industry is now facing a new challenge of green construction. Based on a research question of "what motivates contractors to pursue green construction", the objective of this study is to identify and discuss key characteristics and implications of green construction motivators among major contractors. The Political Economy Approach was adpoted as a main research methodology. The study demonstrated that major contractors show a high level of expectation in the future of green construction and consider economic factors as higher motivators while paying attention to social trends towards green construction. In particular, internal economic motivators were highly considered and the commitment of senior management was viewed as a key motivator.

Cross-border Relationship Analysis Between Base Interest Rates and Construction Investment (국경을 넘어선 기준금리와 건설투자 간의 관계 분석)

  • Kim, Toseung;Lee, Hyeon-soo;Park, Moonseo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.1
    • /
    • pp.47-56
    • /
    • 2019
  • As the zero interest rate era was over with the end of quantitative easing, the economy of several global markets observed the fluctuations of the base interest rate. Interest rate, which is the change of money value with respect to time, is negatively correlated with construction investment. Considering the characteristics of interest rates and construction investment as economic variables, the necessity of cross-border analysis between base interest rate and construction investment was suggested in this paper. Cross-correlation analysis between base interest rates and construction investment crossing the border was performed. The effective correlations were confirmed with values varying by countries. Similar characteristics were also observed among countries with similar economy, which were then divided into three groups. Additionally, identifying the base interest rate that affects the construction investment of a particular country was made possible by reflecting a self-cycle of base interest rates. Lastly, from the result of examining the influence of each rise and fall of the interest rate, it was verified that the difference was more than twice as large in some countries. These results are expected to contribute to construction-related policy makers or investors to make decisions in response to the economic status of the construction market.

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

A study on the economic analysis of high-rise residential-commercial building that is made by precast concrete (초고층 주상복합 프리캐스트 콘크리트 구조물의 경제성 분석에 관한 연구)

  • Kim, Bum-Ki;Suk, Sung-Joon;Lee, Ung-Kyun;An, Sung-Hoon;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.1 s.15
    • /
    • pp.89-96
    • /
    • 2005
  • The increase of hish-rise residential-commercial buildings is required to cut down a term of works and the cost of construction. Reinforced concrete structures and steel framed reinforcement concrete that are commonly used have the difficulty in reducing them. Therefore, the purpose of this study is to propose a new precast concrete complex system and to analyze its economical feasibility. The economic analysis is performed through comparing the cost of a high-rise reinforced building that was already constructed with that of the new proposed precast concrete system, which is limited to structural frame work of typical floors. This study shows that the proposed precast concrete complex system is economical. Further research should be directed at including the influence of a term of works.