• Title/Summary/Keyword: economic benefit evaluation

Search Result 219, Processing Time 0.03 seconds

Cost-Benefit Analysis of Electrical Safety Speed-call Service Using Electrical Fire Statistics Analysis and Outcome Analysis Logic Model (전기화재 통계 및 성과 분석 모델을 이용한 전기안전 긴급출동 고충처리 서비스의 비용 편익 분석)

  • Jeon, Jeong Chay;Yoo, Jae-Geun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.11
    • /
    • pp.1943-1947
    • /
    • 2016
  • Korea Electrical Safety Cooperation(KESCO) have provided the electrical safety speed-call service from 2007 year. Purpose of the service is to reduce discomfort of electricity use and to prevent electrical accident like as electrical fire and shock accident by providing emergency treatment service on fault of the residential electrical facilities notified in the specific house like as a lower-income group and a social welfare facility. But efficiency and economic evaluation of the electrical safety speed-call service is impossible because analysis on the quantitative effect of the service is difficult. This paper presents cost-benefit analysis method and result of the electrical safety speed-call service. The presented cost-benefit analysis method has a two-step process: the first step is to measure quantitative electrical fire prevention effect of the service by using electrical accident statistics and developing outcome analysis logic model of the service effect, and the second step is to analysis cost-benefit(B/C)of the service by calculating quantitative benefit analysis on the measured quantitative electrical fire prevention effect. The results showed that cost-benefit(B/C)of the electrical safety speed-call service is over 4 after 2010 year.

Economic Evaluation of Information Systems : Case and Software Development (정보화 투자효과분석 사례 및 자동화 소프트웨어 개발)

  • 이국희
    • The Journal of Information Technology and Database
    • /
    • v.8 no.2
    • /
    • pp.137-159
    • /
    • 2001
  • This study provides a thorough methodology for IT Investment evaluation. A software tool to support the evaluation process was introduced along with a case study. The software supports the methodology that consists of 7 phases : Target analysis, ldentifying IT measures, Measuring IT impact, Assessing business value, Analyzing the decree of realization, Cost-benefit analysis, and Reporting. The case study showed that the software (CAFA) was a very useful tool supporting both decision-making and post-implementation reviews of IT investment.

  • PDF

Emergy Cost-Benefit Evaluation of the Down Stream of Nakdong River Using Environmental-Ecological Concept (환경 생태학적 개념을 이용한 낙동강 하류의 에머지 비용-편익 평가)

  • Jung, Hwa-Sook;Lee, Seog-Mo;Son, Hyeng-Sik;Son, Hee-Jong
    • Journal of Environmental Science International
    • /
    • v.22 no.4
    • /
    • pp.507-514
    • /
    • 2013
  • The Nakdong River being used as drinking water sources for the Busan metropolitan city has the vulnerability of water management due to the fact that industrial areas are located in the upper Nakdong River. This study used emergy analysis method to evaluate ecological-economics of water treatment systems of D water treatment plant (WTP) where located in the downstream of the Nakdong River. The emergy methodology is a system evaluation tool that uses energy as the common currency to compare different resources on a common basis. Emergy yield ratio (EYR) and emergy sustainability index (EmSI) of D WTP were 1.16 and 0.18, respectively. It means not resources and sustainable system but consumer goods and not sustainable system. Ratio of emergy benefit to the purchaser (EBP) shows 2.7 times higher than economic costs. To change the weak water source and situations we need to diversity water intake.

Engineering and Economic Evaluation of Production of MgO Nanoparticles using a Physicochemical Method

  • Priatna, Deri;Nandiyanto, Asep Bayu Dani
    • International journal of advanced smart convergence
    • /
    • v.8 no.4
    • /
    • pp.26-33
    • /
    • 2019
  • We conducted research to evaluate economically and engineering about the synthesis of Magnesium Oxide, MgO, nanoparticles using physicochemical methods. The method used was economic evaluation by calculating GPM, BEP, PBP, and CNPV. The other method used was engineering perspective. MgO nanoparticles were synthesized by reacting Mg(NO3)2 and NaOH with a mole ratio 1: 2. Mg(OH)2 formed was heated and calcined to remove water content and to oxidation to form MgO. An economic evaluation by calculating GPM and CNPV for the production of MgO nanoparticles on an industrial scale shows that the payback period (PBP) occur in the third year and profits increase each year. Tax variations show that the higher of tax, the lower profits received. When there was an increase of selling prices, the profit was greater. The variable cost used is the price of raw material. When there was an increased in the variable cost price, the payback period was longer and the profits was reduced. The benefit of this research is knowing the industrial production of MgO nanoparticles is beneficial. The function of MgO nanoparticles is a material for the manufacture of ceramics and can be used as an antimicrobial in the water filtration process.

Community Economic Evaluation and Sample Distribution of a State Park: The Case of the Belum Royal State Park, Malaysia

  • AWANG MARIKAN, Dayang Affizzah;RAMBELI, Norimah;AZMAN, Nur Ain;RAMDAN, Mohamad Rohieszan
    • Journal of Distribution Science
    • /
    • v.20 no.10
    • /
    • pp.19-29
    • /
    • 2022
  • Purpose: This study was conducted to gauge the economic evaluation and sample distribution of conserving the Belum Royal State Park (BRSP) in Perak, Malaysia and to identify factors influencing its use by the community. This study aims to examine community perception on the conservation of the Belum Royal State Park (BRSP) and maximum community's willingness to pay for park entry permits fees. Research design, data and methodology: A questionnaire survey was conducted involving a total of 280 respondents. The study adopted the Dichotomous Choice Contingent Valuation Approach (DC-CVM) and the Logistic Model, to estimate the maximum community's willingness to pay for park entry permits fees. Results: The results established that the factors of respondent's occupation, income, ecotourism influence on the BRSP and maximum entry price, significantly influenced visitors' decision on community's willingness to pay. The average community's willingness to pay was RM9.68 per person. Conclusions: In conclusion, surveillance and patrols in protected areas should be expanded. The extra expense for ensuring safety can be offset through income from ecotourism that should also benefit the local community on economic evaluation and equal distribution on the BRSP.

Economic Analysis of Dam Operation Improvement by Dam Downstream River Improvement Works (II)-Economic Benefit and Cost Allocation Analysis (댐하류하천정비사업의 댐 운영개선 효과 경제성 분석 (II) -경제적 편익 및 비용분담률 분석)

  • Yoo, Seung-Hoon;Lee, Gwang-Man;Lee, Eul-Rae
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.9
    • /
    • pp.765-776
    • /
    • 2011
  • Flood discharge capacity in a dam downstream reach has been decreased after dam construction because of the river cross section reduction impacted by farm lands, sand-bars and parking lots, etc. in river flood plains. Those obstacles being in the river inside areas have caused negative influences to the dam operation policy. Therefore, the dam downstream river improvement work associated with the dam operation improvement plan is under construction for removing reduction factors on the dam effective storage, assuring flood safety in the dam downstream river and incrementing dam operation benefits. But the project has issued some problems such as project feasibility, economic evaluation, cost allocation and benefit share, etc. Since a dam enterpriser has not committed such kind of project before, it is necessary to set up an objective analysis process and a quantitative financial valuation. This study examines the measurable economic benefits and the cost allocation of the project for the fairness between benefit owners (central government and water electricity enterprisers). As a result, the total economic benefit from 3 dams (Imha, Daechung and Youngdam Dam) accounts for 14.41 Billion Won/year. The financial valuation of K-water as a project enterpriser is approximately estimated at 40% of the total value and the government is 60%.

A study on the feasibility evaluation technique of urban utility tunnel by using quantitative indexes evaluation and benefit·cost analysis (정량적 지표평가와 비용·편익 분석을 활용한 도심지 공동구의 타당성 평가기법 연구)

  • Lee, Seong-Won;Chung, Jee-Seung;Na, Gwi-Tae;Bang, Myung-Seok;Lee, Joung-Bae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.61-77
    • /
    • 2019
  • If a new utility tunnel is planned for high density existing urban areas in Korea, a rational decision-making process such as the determination of optimum design capacity by using the feasibility evaluation system based on quantitative evaluation indexes and the economic evaluation is needed. Thus, the previous study presented the important weight of individual higher-level indexes (3 items) and sub-indexes (16 items) through a hierarchy analysis (AHP) for quantitative evaluation index items, considering the characteristics of each urban type. In addition, an economic evaluation method was proposed considering 10 benefit items and 8 cost items by adding 3 new items, including the effects of traffic accidents, noise reduction and socio-economic losses, to the existing items for the benefit cost analysis suitable for urban utility tunnels. This study presented a quantitative feasibility evaluation method using the important weight of 16 sub-index items such as the road management sector, public facilities sector and urban environment sector. Afterwards, the results of quantitative feasibility and economic evaluation were compared and analyzed in 123 main road sections of the Seoul. In addition, a comprehensive evaluation method was proposed by the combination of the two evaluation results. The design capacity optimization program, which will be developed by programming the logic of the quantitative feasibility and economic evaluation system presented in this study, will be utilized in the planning and design phases of urban community zones and will ultimately contribute to the vitalization of urban utility tunnels.

Evaluation of Stored Rainwater Quality and Economic Efficiency at Yangdo Elementary Rainwater Harvesting System (양도 초등학교 빗물이용시설의 수질 및 경제성 평가)

  • Kim, Kiyoung;Park, Hyunju;Kim, Tschungil;Han, Mooyoung
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.36 no.5
    • /
    • pp.333-341
    • /
    • 2014
  • To supply substitution water, $2m^3$ of capacity of rainwater harvesting system is designed calculating rainfall, catchment area and LPCD and has a effects to 34.4% of substitution water supply and 237 days of service day. Rainwater of drinking water quality was judged to be suitable except for bacteria problem, however, groundwater is exceeded in nitrate nitrogen, the evaporation residue and also bacteria, which means that the rainwater is suitable for use as water supply. In addition, to consider cost-benefit ratio, economic analysis conducted. The result is that B/C ratio of RWHS (10 years) is 1.70. It means total benefit is bigger than cost. Except to social factor in this study, there are a variety of benefit such as flood or drought prevention, educational effects inspiring water conservation awareness.

A Study on the Methodologies of Economic Analysis for National R&D Program (국가 연구개발사업의 경제성분석 방법론 고찰 : 가치평가를 중심으로)

  • Rim, Myung Hwan
    • Journal of Information Technology Applications and Management
    • /
    • v.21 no.4_spc
    • /
    • pp.345-359
    • /
    • 2014
  • Technological, policy and economic factors are both important variables in maximizing the results of a national R&D program and key indicators in evaluating an R&D program's eligibility for financial support. Economic analysis, in particular, is used when selecting R&D programs, setting priorities, and estimating economic effects. This paper examines a series of methodological issues related to the economic analysis of national R&D programs within the framework of the current preliminary feasibility evaluation system, and proposes alternative approaches to each of the issues discussed. The issues include the definition of R&D valuation and establishment of valuation factors; estimation of sales attributable to R&D investment; assessment of the total economic value of R&D as intellectual assets; estimation of R&D benefits and assumption of related to sales; and the application of discount rates based on the weighted average cost of capital. Finally, this study presents directions for future research on analytical procedures and methods of improving the reliability of the results of economic analysis within the national technology planning system.

Incorporating Social & Economic Factors for the Pasture Project in Kum River (금강 참게목장화 사업의 사회-경제 통합모델링)

  • Jeon, Dae-Uk
    • Korean System Dynamics Review
    • /
    • v.12 no.1
    • /
    • pp.59-74
    • /
    • 2011
  • This article deals with an economic evalutation of the 'Pasture Project of Kum River', which is the farming plan of mitten crabs in a stream of it. An augmented model of social capital is based on the past ecological-economic system dynamics model and elaborated further with suggestions of social capital literature. During the modeling process a chain diagram of causal relations and its relevant mathematical equations are presented for simulating the project performance, and the simulation results are provided to contrast the dynamic behaviors of the former ecological-economic model with ones of the new model incorporating social capital. The results indicate that an increase in the economic benefit of the project could happen in case of considering the process of social capital accumulation around the case area, which can be regarded as a remarkable trial to approve the common confidence in the role of social capital to enhance an economic achievement.

  • PDF